Total Data Volume (January 2000 - December 2000) Passes Total Data Volume Performance Standard is 1500 Passes Mt. Stromlo Yarragadee Monument Peak Greenbelt.

Slides:



Advertisements
Similar presentations
The Matera Laser Ranging Observatory FSP-06, Frascati, Italy, March 2006 Giuseppe Bianco Centro di Geodesia Spaziale, ASI – Matera, Italy.
Advertisements

RIGA Event Timer A032-ET Riga A032-ET in Graz. RIGA Event Timer A032-ET Eastbourne, October 2005  Graz uses routinely the Graz E.T. (Dassault Modules)
Do you have any energy monitoring? YES Potsdam. During the pass, the instantaneous and the average return rate are displayed on the observer's screen.
Centre-of-mass correction issues: Toward mm-ranging accuracy Toshimichi OTSUBO National Institute of Information and Communications Technology.
PNT Advisory Board| Chevy Chase Pavilion | May 14, 2009 | 0 Michael Pearlman Director Central Bureau International Laser Ranging Service Harvard-Smithsonian.
Upgrading Plans of the Chinese SLR Network Upgrading Plans of the Chinese SLR Network Yang FuMin(1), Wu Bin(1), Zhang ZhongPing(1), Guo TangYong(2), Zhao.
KHz Single Photon Ranging: A Precise Tool to Retrieve Optical Response of Satellites Toshimichi Otsubo Hitotsubashi University 16th International Workshop.
PNT Advisory Board| Alexandria, Virginia | November 5 – 6, 2009 | 0 Michael Pearlman Director Central Bureau International Laser Ranging Service Harvard-Smithsonian.
Laser Ranging to the Lunar Reconnaissance Orbiter (LRO): a Global Network Effort Jan McGarry, Tom Zagwodzki, Ron Zellar, Carey Noll, Greg Neumann NASA.
The methods of converting observation data of SLR between two nearby stations.
1 Progress of Changchun SLR You ZHAO, Cunbo FAN, Xinwei HAN, Gang ZHAO, Ziang ZHANG, Xue DONG Changchun Observatory/NAOC, CAS, , China.
Photon counting detectors for future space missions Ivan Prochazka, Josef Blazej Ulrich Schreiber * presented at 16 th International Workshop on Laser.
© GMV, 2008 Property of GMV Aerospace and Defence S.A.; all rights reserved USE OF SLR OBSERVATIONS TO IMPROVE GALILEO GIOVE-B ORBIT AND CLOCK DETERMINATION.
Summary: Scientific Achievement, Applications and Future Requirements Zueheir Altamimi Steve Klosko Richard Gross Aleksander Brzezinski.
Canberra, Australia On the Generation of SLR Output Files at Mt Stromlo Chris Moore, Peter Wilson.
TOR TanDEM-X 16th International Workshop on Laser Ranging, Poznan, October 2008 ILRS Support for TerraSAR-X and TanDEM-X - Status and Future Prospects.
High Repetition Rate Systems (1) Number of kHz Systems is now increasing exponentially:  Graz2 kHz400 µJ5 years of continuous kHz operation completed;
ILRS Status Report ILRS General Assembly October 17, 2008 ILRS Central Bureau NASA GSFC, Greenbelt, MD USA
Canberra, Australia Assessing Tracking Performance of High Satellites at Mt Stromlo SLR Station Chris Moore.
Moblas 8 Return to Operations 16 th International Laser Ranging Instrumentation Workshop Poznan, Poland October 16, 2008 Scott Wetzel, Howard Donovan,
ESTIMATION OF THE ELASTICITY EARTH PARAMETERS FROM THE SLR TECHNIQUE M.Rutkowska Space Research Centre, Polish Academy of Sciences M. Jagoda Technical.
HEO - Daylight Tracking Some things to consider...
Michael Pearlman 1, Carey Noll 2, Jan McGarry 2, Werner Gurtner 3, and Erricos Pavlis 4 1Harvard-Smithsonian Center for Astrophysics 2NASA Goddard Space.
New Prediction System - Introduction  The Consolidated Prediction Format (CPF) provides a single, convenient method for most stations to range to disparate.
E. C. Pavlis Geoscience Australia Seminar Canberra, Australia 29 August, 2005 Implications of SLR Network Variations On Geodetic and Geophysical Products.
 decimals/cc-7th-fracs-to-decimals/v/converting-fractions-to-decimals-example.
Main tasks  2 kHz distance measurements to 60 satellites  Precision: 2.5 mm single shot;
ILRS WorkshopEastbourne, UK October 3 - 7, 2005 ILRS ACTIVITIES SLR Workshop Eastbourne, UK October 3 - 7, 2005.
System Operations Eastbourne, October 2005 Towards the 1-mm: -A realistic goal ? -A vision ? -A myth ? -???
01/0000 HEO and Daylight Ranging “Reality and Wishes” Ramesh Govind ILRS Fall Workshop, 4 th October 2005.
Honeywell Technology Solutions Inc AWG Meeting, Washington DC, Oct 3-4, 2002 Comparison of ILRS Station Positions (“AA” & “A” Series, i.e. 1999) Van Husson.
ILRS Workshop Herstmonceux 2005 Network collaboration ILRS 2005 Workshop Eastbourne, UK, October 6th, 2005.
September 2008 SundayMondayTuesdayWednesdayThursdayFridaySaturday
VARIABILITY OF TOTAL ELECTRON CONTENT AT EUROPEAN LATITUDES A. Krankowski(1), L. W. Baran(1), W. Kosek (2), I. I. Shagimuratov(3), M. Kalarus (2) (1) Institute.
Presentation on editors draft resolution of comments on SC32 N2148 PDTR ISO/IEC JTC 1/SC 32 Plenary and WG2 meeting Berlin, Germany, 7, June, 2012.
I.Prochazka, CTU Prg Dec 2010 Ivan Procházka, Josef Blažej, Jan Kodet presented at : ELT meeting CTU in Prague, December 8, 2010 Czech Technical University.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Control Files Werner Gurtner Astronomical Institute University of Bern ILRS Workshop 3-7 October 2005 Eastbourne.
I. Prochazka 1, J. Kodet 1,2, J. Blazej 1 K.G. Kirchner 3, F. Koidl 3 Presented at 2015 ILRS Technical Workshop, Matera, Italy, October 26 – 30,
Math Review 4 th Grade. Dates There are 52 weeks in one year. There are 365 days in one year. January, March, May, July, August, October, and December.
TEMPORAL VISUALIZATION OF DATA FROM THE FRENCH SENTINEL NETWORK.
Christmas Tree Volume. 17 Sections 181 Data Points Disk and Washer Method used to find volume.
N Co-location with other techniques or slr systems Annoucement of opportunity for Scientific projects including FTLRS operations GRGS/OCA Ftlrs Oca-Grasse.
300keV emittances February 1, Scan _1835 FC0=1.13E-04 [A] Collimator=7.50E-06 [A] DF=1% Peak current = 100 [μA] RF = [dB] Power = 30.
Determination of the SLR station coordinates and velocities on the basis of laser observations of low satellites Paweł Lejba, Stanisław Schillak Space.
Sections & Council Formation Dates In China SectionsGeo CodeFormation Date 1China CouncilR Jun-07 2BeijingR Dec-84 3ChengduR Nov-06.
Total Data Volume (October September 2000) Passes Total Data Volume Performance Standard is 1500 Passes Monument Peak Mt. Stromlo Yarragadee Greenbelt.
The reading is 7.38 mm. The reading is 7.72 mm.
Satellite Laser Ranging Technique
Unit4 It’s warm today Part A let’s learn 东村小学 石开利.
璜田学校 程选子 25 ℃ warm 14 ℃ cool -13 ℃ cold 35 ℃ hot.
Mission of the ILRS Laser ranging activities are organized under the International Laser Ranging Service (ILRS) which provides global satellite and lunar.
NSGF prediction service
CMP Model Effects on ILRS Products
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Validation Activities for Jason-1 and TOPEX/Poseidon Precise Orbits
McDonald’s Kalender 2009.
Zimbabwe 2017/18 Seasonal update
X SERBIAN-BULGARIAN ASTRONOMICAL CONFERENCE 30 MAY - 3 JUNE, 2016, BELGRADE, SERBIA EARTH ORIENTATION PARAMETERS AND GRAVITY VARIATIONS DETERMINED FROM.
Geo Units Formation Dates In China
EMPLOYER TESTING On-Going Employees (one who has been with the employer for at least one standard measurement period) STANDARD MEASUREMENT PERIOD 3 – 12.
McDonald’s calendar 2007.
McDonald’s calendar 2007.
Operational Update 1.
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
Naval Complexes Meeting April 15, 2019
2015 January February March April May June July August September
UNITS OF TIME QUESTIONS.
Presentation transcript:

Total Data Volume (January December 2000) Passes Total Data Volume Performance Standard is 1500 Passes Mt. Stromlo Yarragadee Monument Peak Greenbelt Herstmonceux Graz Grasse San Fernando McDonald Zimmerwald Changchun Wettzell Simosato Arequipa Potsdam Beijing Shanghai Grasse (LLR) Tateyama Tahiti Riga Kunming Kashima Borowiec Koganei Wuhan Matera Maidanak 2 Miura Metsahovi2 Helwan Hartebeesthoek Beijing (TROS) Golosiiv Haleakala Komsomolsk Katsively Mendeleevo Simeiz Cagliari Riyadh

LEO Pass Total (January December 2000) Passes LEO Data Volume Performance Standard is 1000 Passes Monument Peak Mt. Stromlo Greenbelt Yarragadee Grasse San Fernando Herstmonceux Graz McDonald Zimmerwald Changchun Simosato Arequipa Potsdam Wettzell Beijing Shanghai Riga Tahiti Tateyama Kashima Borowiec Kunming Matera Koganei Wuhan Metsahovi2 Helwan Miura Maidanak 2 Golosiiv Beijing (TROS) Hartebeesthoek Mendeleevo Haleakala Komsomolsk Katsively Simeiz Cagliari Riyadh

LAGEOS Pass Total (January December 2000) Passes LAGEOS Data Volume Performance Standard is 400 Passes Mt. Stromlo Yarragadee Monument Peak Herstmonceux Greenbelt Graz Wettzell McDonald Grasse Zimmerwald San Fernando Tateyama Changchun Tahiti Simosato Kunming Grasse (LLR) Kashima Potsdam Shanghai Beijing Arequipa Miura Koganei Borowiec Maidanak 2 Riga Wuhan Hartebeesthoek Matera Metsahovi2 Katsively Beijing (TROS) Haleakala Simeiz Cagliari Komsomolsk Helwan

High Satellite Pass Total (January December 2000) Passes High Satellite Data Volume Performance Standard is 100 Passes Yarragadee Mt. Stromlo Grasse (LLR) Graz Monument Peak McDonald Herstmonceux Wettzell Greenbelt Shanghai Changchun Zimmerwald Wuhan Tateyama Maidanak 2 Beijing Simosato Kunming Kashima Koganei Grasse Potsdam Beijing (TROS) Miura Komsomolsk Hartebeesthoek Borowiec Katsively Metsahovi2 Haleakala Simeiz

Total NP Volume (January December 2000) Normal Points Monument Peak Yarragadee Grasse Graz Mt. Stromlo Greenbelt San Fernando Herstmonceux Zimmerwald McDonald Changchun Simosato Wettzell Potsdam Arequipa Riga Shanghai Beijing Tahiti Tateyama Borowiec Matera Kashima Kunming Metsahovi2 Wuhan Koganei Grasse (LLR) Miura Maidanak 2 Golosiiv Helwan Beijing (TROS) Hartebeesthoek Katsively Haleakala Komsomolsk Simeiz Mendeleevo Cagliari Riyadh

LAGEOS NP Total (January December 2000) Normal Points Mt. Stromlo Yarragadee Herstmonceux Monument Peak Graz Greenbelt Grasse Zimmerwald Wettzell McDonald Grasse (LLR) San Fernando Tateyama Tahiti Simosato Kunming Changchun Kashima Potsdam Shanghai Borowiec Arequipa Riga Koganei Miura Wuhan Beijing Maidanak 2 Matera Hartebeesthoek Metsahovi2 Beijing (TROS) Katsively Haleakala Simeiz Cagliari Komsomolsk Helwan

LEO NP Total (January December 2000) Normal Points Monument Peak Grasse Graz Greenbelt Yarragadee San Fernando Mt. Stromlo Herstmonceux Zimmerwald Simosato McDonald Changchun Arequipa Potsdam Riga Wettzell Beijing Shanghai Tahiti Borowiec Tateyama Matera Kashima Metsahovi2 Kunming Wuhan Koganei Golosiiv Helwan Miura Maidanak 2 Beijing (TROS) Hartebeesthoek Katsively Haleakala Komsomolsk Mendeleevo Simeiz Cagliari Riyadh

High Satellite NP Total (January December 2000) Normal Points Yarragadee Mt. Stromlo Graz Monument Peak Grasse (LLR) Greenbelt Herstmonceux McDonald Wettzell Shanghai Changchun Zimmerwald Wuhan Tateyama Simosato Beijing Kunming Grasse Kashima Maidanak 2 Koganei Beijing (TROS) Potsdam Miura Hartebeesthoek Borowiec Katsively Haleakala Komsomolsk Metsahovi2 Simeiz

Minutes of Tracking Coverage (January December 2000) Minutes of Tracking Yarragadee Mt. Stromlo Graz Monument Peak Greenbelt Herstmonceux Grasse McDonald Zimmerwald Wettzell Grasse (LLR) San Fernando Changchun Simosato Shanghai Tateyama Potsdam Tahiti Kunming Beijing Arequipa Wuhan Kashima Riga Borowiec Koganei Miura Matera Maidanak 2 Metsahovi2 Beijing (TROS) Hartebeesthoek Katsively Helwan Haleakala Golosiiv Komsomolsk Simeiz Cagliari Mendeleevo Riyadh

LAGEOS Single Shot RMS (October December 2000) RMS (mm) Arequipa Monument Peak Graz Mt. Stromlo Tahiti Greenbelt Hartebeesthoek Yarragadee Haleakala McDonald Tateyama Grasse Potsdam Herstmonceux Changchun Shanghai Kashima Helwan Beijing Wuhan Riga Grasse (LLR) Metsahovi2 Wettzell Zimmerwald Beijing (TROS) Borowiec Simosato Kunming San Fernando Katsively Simeiz Matera

LAGEOS NP RMS (October December 2000) RMS (mm) Hartebeesthoek Yarragadee Monument Peak Tahiti Grasse Greenbelt Graz Mt. Stromlo Herstmonceux McDonald Tateyama Arequipa Grasse (LLR) Zimmerwald Potsdam Kashima Wettzell Shanghai Katsively Metsahovi2 Haleakala Borowiec Wuhan Simosato Riga Beijing Changchun Beijing (TROS) Kunming San Fernando Maidanak 2 Helwan Matera Simeiz

Short Term Bias Stability (October December 2000) Bias Stability (mm) Short Term Bias Stability Performance Standard is 20 mm Greenbelt Graz Yarragadee Grasse (LLR) Herstmonceux Grasse Zimmerwald Monument Peak Haleakala Arequipa McDonald Mt. Stromlo Borowiec Potsdam Simosato Tateyama Changchun Tahiti Metsahovi2 Wuhan Katsively Kashima Wettzell Riga Hartebeesthoek Shanghai San Fernando Helwan Beijing Maidanak 2 Simeiz Matera Beijing (TROS) Kunming

Bias Stability (mm) Long Term Bias Stability (January December 2000) Long Term Bias Stability Performance Standard is 10 mm Yarragadee Greenbelt Monument Peak Herstmonceux Graz Mt. Stromlo Zimmerwald McDonald Grasse Grasse (LLR) Tahiti Arequipa Tateyama Potsdam Wettzell Changchun Simosato Shanghai Borowiec Beijing Kashima Matera San Fernando Maidanak 2 Riga Kunming

% of LAGEOS NP Accepted (October December 2000) Percentage of NP Accepted Performance Standard is 95% of NP accepted Graz Herstmonceux Haleakala McDonald Grasse Zimmerwald Greenbelt Yarragadee Monument Peak Grasse (LLR) Mt. Stromlo Simosato Arequipa Potsdam Tahiti Kashima Borowiec Hartebeesthoek Wettzell Changchun Wuhan Shanghai Riga Tateyama Maidanak 2 Metsahovi2 Katsively San Fernando Kunming Beijing Helwan Matera Beijing (TROS) Simeiz

Data Latency (October December 2000) Data Latency (hours) Data Latency Performance Standard is 12 hours Borowiec Simosato Zimmerwald San Fernando Herstmonceux Yarragadee McDonald Wuhan Greenbelt Monument Peak Tahiti Hartebeesthoek Matera Changchun Riga Grasse Arequipa Kashima Tateyama Helwan Shanghai Beijing (TROS) Potsdam Metsahovi2 Beijing Kunming Simeiz Grasse (LLR) Haleakala Graz Mendeleevo Wettzell Mt. Stromlo Maidanak 2 Katsively