MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.

Slides:



Advertisements
Similar presentations
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Advertisements

Q1 for JLAB’s 12 Gev/c Super High Momentum Spectrometer S.R. Lassiter, P.B. Brindza, M. J. Fowler, S.R. Milward, P. Penfold, R. Locke Q1 SHMS HMS Q2 Q3.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
MUTAC Review, 9 April MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
Magnet quench during a training run Magnet electrical circuit schematic PROGRESS ON THE MODELING AND MODIFICATION OF THE MICE SUPERCONDUCTING SPECTROMETER.
UPDATE of RFCC MOUDLE Derun Li, Steve Gourlay Lawrence Berkeley National Laboratory MICE MICO Meeting December 21, 2011.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Progress on the MICE Cooling Channel Solenoid Magnet System
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
-1- Wang, Li The 23rd MICE Collaboration Meeting to 17 HIT/CHINA WANG, Li Institute of Cryogenics and Superconductivity Technology.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
MICE RF Module Safety Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting February 12, 2005.
10 October 2006 MICE CM-16 at RAL 1 Distributed versus Lumped Coupling Magnets Michael A. Green and Soren Prestemon Lawrence Berkeley Laboratory, Berkeley.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
1 The Genoa Tracker Solenoids and their Contribution toward a New Design Michael A. Green Lawrence Berkeley National Laboratory and Pasquale Fabbricatore.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
12 March 2006NFMCC Meeting, IIT, Chicago1 Progress on the MICE Cooling Channel and Tracker Magnets Michael A. Green Lawrence Berkeley Laboratory.
CM-18 June Magnet Conductor Parameters and How They affect Conductor Selection for MICE Magnets Michael Green Lawrence Berkeley Laboratory Berkeley.
1 Progress on the MICE Cooling Channel Magnets Michael A. Green Lawrence Berkeley National Laboratory 28 June 2005.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
MICE Magnets - Virostek 11 MICE Magnets Steve Virostek Engineering Division Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
RF Cavity / Coupling Coil Module
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Office of Science 3/8/ LBNL MICE Project Status Spectrometer Solenoids, Coupling Coils and RFCC Modules Steve Gourlay MICE Project Board March.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
MICE RFCC Module Derun Li Lawrence Berkeley National Laboratory MICE Schedule Review RAL, UK May 24, 2011 May 24, 2011.
Normal Conducting RF Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 5-6, 2013.
1 WANG,Li/SINAP WANG Li, WANG ShuHua, LIU YiYong, SUN Sen, HU Xiao, YIN LiXin Shanghai Institute of Applied Physics, CAS, Shanghai , China Shanghai.
Preliminary Design for the Coupling Coil Cryostat in MICE
Abstract: The Muon Ionization Cooling Experiment (MICE) is an international effort sited at Rutherford Appleton Laboratory, which will demonstrate ionization.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MICE Cooling Channel Magnets: Spectrometer Solenoid Procurement RF Module Coupling Coil Proposal Steve Virostek Lawrence Berkeley National Lab NFMCC 07.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
MICE/MuCool Coupling Magnets to 22 ICST/HIT MICE/Muool Coupling Magnets Progress Li Wang for MICE Group Institute of Cryogenics.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
Status of MICE Coupling Coil Magnets D. Li and M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory February 16, 2011 MICE CM29-Rutherford.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
Spectrometer Solenoid Update
Spectrometer Solenoid Fabrication Status and Schedule
MICE Coupling Coil Update
Presentation transcript:

MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February 29, 2012 MICE CC Magnet Cryostat Design, LBNL (Feb. 29th 2012)

2 RFCC Modules in MICE Channel RFCC Module #1 RFCC Module #2 2MICE CC Magnet Cryostat Design, LBNL (Feb. 29th 2012)

RFCC Module Overview RF Cavities Coupling Coil 3MICE CC Magnet Cryostat Design, LBNL (Feb. 29th 2012) Tuner arms Couplers

RFCC Module Overview The MICE RFCC Module has been designed by LBNL and our collaborators; The MICE RFCC Module has been designed by LBNL and our collaborators; The MICE cooling channel incorporates two RFCC modules to be provided by LBNL; The MICE cooling channel incorporates two RFCC modules to be provided by LBNL; Each RFCC module consists of a single superconducting Coupling Coil magnet integrated with four tunable 201 MHz normal conducting RF cavities and a vacuum vessel; Each RFCC module consists of a single superconducting Coupling Coil magnet integrated with four tunable 201 MHz normal conducting RF cavities and a vacuum vessel; The Coupling Coil design was developed by the Harbin Institute of Technology (HIT) in China (a MICE collaborator), in collaboration with LBNL; The Coupling Coil design was developed by the Harbin Institute of Technology (HIT) in China (a MICE collaborator), in collaboration with LBNL; A third Coupling Coil magnet (first delivered) for MuCool will be sited in the MTA at Fermilab; A third Coupling Coil magnet (first delivered) for MuCool will be sited in the MTA at Fermilab; The CC magnet is the largest of the three types of magnets in MICE channel in terms of diameter and stored magnetic energy at full current. The CC magnet is the largest of the three types of magnets in MICE channel in terms of diameter and stored magnetic energy at full current. 4MICE CC Magnet Cryostat Design, LBNL (Feb. 29th 2012)

The Coupling Coil Magnet MICE CC Magnet Cryostat Design, LBNL (Feb. 29th 2012)5

The CC Magnet Overview The coupling magnet is the largest of the three types of magnets in MICE both in terms of diameter and stored magnetic energy at full current; The coupling magnet is the largest of the three types of magnets in MICE both in terms of diameter and stored magnetic energy at full current; The CC magnet assembly consists of a single coil (cold mass with quench protection and cooling circuit) that fits into a cryostat vacuum vessel;The CC magnet assembly consists of a single coil (cold mass with quench protection and cooling circuit) that fits into a cryostat vacuum vessel; The CC magnet is designed to operate in the MICE cooling channel where the fields from SS and AFC magnets can interact with the magnet;The CC magnet is designed to operate in the MICE cooling channel where the fields from SS and AFC magnets can interact with the magnet; Tight spacing determined by adjacent RF couplers for 201-MHz cavities;Tight spacing determined by adjacent RF couplers for 201-MHz cavities; The inner diameter of the CC magnet mainly determined by the diameter of the RF cavities and the vacuum vessel that must go around the cavities;The inner diameter of the CC magnet mainly determined by the diameter of the RF cavities and the vacuum vessel that must go around the cavities; The CC magnet is to be cooled by 3 cryocoolers that provide up to 1.5 W at 4.2 K /ea;The CC magnet is to be cooled by 3 cryocoolers that provide up to 1.5 W at 4.2 K /ea; The magnet is designed to minimize heat leak, maximize the magnet operating temperature margin.The magnet is designed to minimize heat leak, maximize the magnet operating temperature margin. 6MICE CC Magnet Cryostat Design, LBNL (Feb. 29th 2012)

The CC Magnet Overview (cont’d) QP for the CC magnet is passive, protected by cold diodes and resistors across sections of coil and quench back from the 6061 aluminum mandrel: QP for the CC magnet is passive, protected by cold diodes and resistors across sections of coil and quench back from the 6061 aluminum mandrel: – Original design has 8 sub–division to reduce quench voltages (MIT presentations) The CC magnet cold mass support adopts a self-centering support system consisting of eight tension bands that the magnet center does not change as the magnet is cooled down:The CC magnet cold mass support adopts a self-centering support system consisting of eight tension bands that the magnet center does not change as the magnet is cooled down: —The support system is designed to carry a sustained longitudinal force up to 500 kN (50 tons) in either direction during anticipated operation and failure modes The magnet could be powered a single bi-polar power supply: The magnet could be powered a single bi-polar power supply: – Current range: -240 A to +240 A; voltage range: -10 V to +10 V 7MICE CC Magnet Cryostat Design, LBNL (Feb. 29th 2012)

Main Parameters of CC Magnet MICE CC Magnet Cryostat Design, LBNL (Feb. 29th 2012)8 Parameters 240 MeV/c and b= 420 mm 200 MeV/c and b= 400 mm Operation modes FlipNon-flipFlipNon-flip Coil Length (mm) Coil Inner Radius (mm) Coil Thickness (mm) Number of Layers 9696 No. Turns per Layer Magnet Self Inductance (H) Magnet J (A mm –2 ) Magnet Current (A) Stored Energy (MJ) Peak Induction in Coil (T) Coil Temperature Margin (K)  0.77  1.1  1.6  1.8

SC Conductors MICE CC Magnet Cryostat Design, LBNL (Feb. 29th 2012)9 Insulated dimension 1.00mm x 1.65mm Cu to S/C Ratio 4.0 ± 0.5 Cu RRR >70 No. Filaments 222 Filament Diameter ~41  m Filament twist Pitch 19 mm ± 6 Ic (4.2K, 5T) > 760 A n > 5T Length  260 km

The Magnet & Cryostat Overview MICE CC Magnet Cryostat Design, LBNL (Feb. 29th 2012)10 Three cryocoolers demountable windows Welded flanges

Heat Load Calculations MICE CC Magnet Cryostat Design, LBNL (Feb. 29th 2012)11 Heat loads from 300K to 60K (W) Copper leads from 300 K Cold mass supports (intercept T=72-77 K) Radiation Heat to the Shields 8.47 Instrumentation wires He Cooling Tubes 2.91 Level sensor tube 0.85 Cooler SS sleeves 9.73 Neck shield supports 0.88 Heat shield supports 0.37 (longer support) Sub-total (calculated) Total Heat Load with 50% Contingency Total Heat Load with 100% Contingency Heat load from 60K to 4.2K (W) Current design HTS current leads (T = 64 K) K Cold mass supports (T=73-78K) Radiation heat to 4.2K cold mass (Shield Tave = 70K) (W) (MLI layer :20) Instrumentation Wires He cooling tubes 0.09 Level sensor tube 0.03 Cooler SS sleeves (testing data) Superconducting Splices at 10 nW per splice and 210 A 0.01 Total with 50% Contingency Total with 100% Contingency

3D Cryostat Model MICE CC Magnet Cryostat Design, LBNL (Feb. 29th 2012)12 Coil cold mass Cold mass support Neck shield Main shield Shield support

Major Sub-Assemblies MICE CC Magnet Cryostat Design, LBNL (Feb. 29th 2012)13

Major Assembly: Cold-Mass (1) Cold-mass from China: Cold-mass from China: – Coil and welded cover plate Weld cooling tubes, fill-in line and thermal siphon line Weld cooling tubes, fill-in line and thermal siphon line Support brackets Support brackets Vacuum potting Vacuum potting Quench protection circuits Quench protection circuits & installation & installation Lead stabilization Lead stabilization Diagnostic sensors Diagnostic sensors Top reservoir Top reservoir *some of the images presented here have not been updated yet MICE CC Magnet Cryostat Design, LBNL (Feb. 29th 2012)14

Major Assembly: Cooling Circuit (2) Cooling circuit assembly Cooling circuit assembly MICE CC Magnet Cryostat Design, LBNL (Feb. 29th 2012)15

Major Assembly: Shielding (3) MICE CC Magnet Cryostat Design, LBNL (Feb. 29th 2012)16

Major Assembly: Vacuum Vessel (4) MICE CC Magnet Cryostat Design, LBNL (Feb. 29th 2012)17

Current Status and Plan Cold-mass testing in preparation at LBNL Cold-mass testing in preparation at LBNL – Scheduled to ship to Fermilab by end of April 2012 – Remaining tasks at LBNL: Welding of cooling tubes Welding of cooling tubes QP circuit design, fabrication and installation (with MIT) QP circuit design, fabrication and installation (with MIT) Vacuum potting and high pot testing Vacuum potting and high pot testing Cold-mass testing at Fermilab Cold-mass testing at Fermilab – Summer 2012 Superconductors ordered Superconductors ordered Coil winding review at QH Coil winding review at QH – Mid-late April 2012 MICE CC Magnet Cryostat Design, LBNL (Feb. 29th 2012)18

Current Status and Plan (cont’d) Near term plan Near term plan – Preparation for the cold-mass testing at Fermilab – Finalize QP and lead stabilization design (MIT) Generation of fabrication drawings Generation of fabrication drawings Parts fabrication Parts fabrication – Updating and generation of the fabrication drawings of the cryostat parts – Deliver the drawings to QH for fabrication Estimated fabrication time for the parts: four months Estimated fabrication time for the parts: four months 2 nd and 3 rd coil winding at QH 2 nd and 3 rd coil winding at QH – Coil winding (estimated winding time: 3-4 months/ea) – Cover plate welding at HIT (estimated time: 4 weeks) – Shipping the cold-mass to US (3 weeks) Testing and cryostating in the US Testing and cryostating in the US MICE CC Magnet Cryostat Design, LBNL (Feb. 29th 2012)19

Magnet & Cryostat Design Details Cryostat Mechanical Design Details Cryostat Mechanical Design Details – Allan DeMello Cryostat Thermal & Stress Analysis Cryostat Thermal & Stress Analysis – Heng Pan Cooling Circuit Design Cooling Circuit Design – Steve Virostek Quench Protection Analysis Quench Protection Analysis – Brad Smith (MIT) Lead Stabilization Lead Stabilization – Alexy Radovinsky (MIT) Instrumentation Plan Instrumentation Plan – Steve Virostek MICE CC Magnet Cryostat Design, LBNL (Feb. 29th 2012)20