Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

Progress and Plan for Superconducting RF Cavity RF Group.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
ORNL is managed by UT-Battelle for the US Department of Energy Commissioning and Operation of the Horizontal Test Apparatus at SNS Presented at: CEC/ICMC.
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Heat load study of cryomodule in STF
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
Signal port flange and beam pipe Norihito Ohuchi 2009/10/27122nd S1-G Webex meeting.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
ORNL is managed by UT-Battelle for the US Department of Energy 2-K Pump Down Studies at SNS Presented at the CEC/ICMC 2015 – C3OrA Matthew Howell SCL Systems.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
● Offer the reliable system to the Asian regional facility STF. ● Improve TTF design and demonstrate in the beam line for RDR / TDR. ● Establish industrial.
SNS Operating Modes and Reliability Studies Presented at the 4 th Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-4),
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
Road map of the workshop Machine availability: – “work-horse” in the injection chain – 100% availability not viable,.What is achievable? And at which cost?
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
CARE SC meeting August 2005 T. Garvey JRA1 – SRF (WP 7 – 11)
Definition of Work Area H. Hayano, KEK EDR-KOM-cavity at DESY Issues of Cavity and Cavity Package, Work Package discussion.
704 MHz warm cavity November 4, 2015 A.Zaltsman: SRF & warm RF components for LEReC1  A single cell 704 MHz warm cavity is used to correct the beam energy.
HOM Experiences at the SNS SCL SPL HOM Workshop CERN June 26, 2009 Sang-ho Kim SNS SCL Area Manager SNS/ORNL.
February 17-18, 2010 R&D ERL Gary McIntyre R&D ERL ERL Status & Schedule Gary McIntyre February 17-18, 2010 ERL Status & Schedule.
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
A 350 MHz, 200 kW CW, Multiple Beam IOT Lawrence Ives, Michael Read, David Marsden, R. H. Jackson, Thuc Bui Calabazas Creek Research, Saratoga, CA. USA.
ORNL is managed by UT-Battelle for the US Department of Energy Fundamental Power Couplers Overview, Performance, and Plans at the Spallation Neutron Source.
HiLumi-LHC/LARP Crab Cavity System External Review – May Work partly supported by the EU FP7 HiLumi LHC grant agreement No and by the.
The SNS Power Upgrade Project Building on the Success of the SNS Accelerator Deployment Kevin Jones Research Accelerator Division Director.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
1Managed by UT-Battelle for the U.S. Department of Energy LCWA 2009, September 29, 2009 The Spallation Neutron Source Linac: Performance and Operational.
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
JLAB Pressure Systems Considerations Ed Daly. Outline Introduction Federal Law - 10CFR851 Compliance JLAB Pressure Systems Program –Complies with 10CFR851,
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
Jefferson Lab Cryomodule Cost and Optimization. Based Jlab energy upgrade Cryomodule design and produced to increase the energy gain of CEBAF to 12 GeV.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Cryomodules Matthew Howell and Stephen Stewart Cryomodule Design Team Members.
Thomas Jefferson National Accelerator Facility Page 1 FNAL September 11, 2009 Design Considerations for CW SRF Linacs Claus H. Rode 12 GeV Project Manager.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Cavities, Cryomodules, and Cryogenics Working Group 2 Summary Report Mark Champion, Sang-ho Kim Project X Collaboration Meeting April 12-14, 2011.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
Rev 0.3: Aug 7, Notes from TRISTAN Experiences N.Toge (KEK) for GDE RDB S2 Rev.0.3 Aug. 7, 2006.
S1G Experiment Schedule Plan
Cryomodule test stand at ESS site
Requirements for Efficient CW SRF Cryomodules
T5.2: Harmonization - Material and Component Reference
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
RF interlocks for higher intensities (LMC 15 June)
SNS Operational History
Cavity + He Vessel interface
UK RFD Pre-Series cryomodule
XFEL cavities and cryomodules measurements at AMTF
SNS Fundamental Power Coupler History
Wolfgang Anders, BESSY, Berlin
CEPC RF Power Sources System
Strategy for operation and recovery of performance at SNS -Background -History of performance -What is our operational strategy -Performance recovery.
Performance Recovery at CEBAF
SNS Cryoplant Commissioning Past Experiences
SNS PPU Cryomodule Instrumentation
Cryomodule Assembly Plan
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL SAFETY AND RAMI INPUTS - Franck Peauger OLIVIER KUSTER (INSTALLATION AND.
Cryomodule Test Schedule
SNS PPU Cryomodule Instrumentation
Presentation transcript:

Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL

2Managed by UT-Battelle for the U.S. Department of Energy MSU Visit., July 23, 2010 SNS LINAC Twenty-three cryomodules – 11 medium beta cryomodules – 12 high beta cryomodules – 9 empty slots for high beta cryomodules

3Managed by UT-Battelle for the U.S. Department of Energy MSU Visit., July 23, 2010 Machine Availability Optimization Strategy is to minimize downtime by recognizing nuisance failures and permitting continued operations Many component failures create no downtime due to redundancy or operational strategy Machine interlocks allow bypassing non-critical failed components and controlling operations via redundant components until repairable during scheduled maintenance period Proactive maintenance program repairs or replaces weak components prior to failure minimizing impact on reliability

4Managed by UT-Battelle for the U.S. Department of Energy MSU Visit., July 23, 2010 Most Frequent Maintenance / Repair Activities Pressure Transducers Cold Cathode Gages Tuner – Piezo / Harmonic Drive HOM Issues Helium Circuit / Beam line Vacuum Leaks Loose RF Cable

5Managed by UT-Battelle for the U.S. Department of Energy MSU Visit., July 23, 2010

6Managed by UT-Battelle for the U.S. Department of Energy MSU Visit., July 23, 2010 Pressure Transducers Multiple incidents of PT failures (35 – 40) PT’s are located on surge tank and return piping Component electronics failures due to radiation damage Failure is considered a nuisance failure and not a reliability issue Replacement transducers have had much better service life.

7Managed by UT-Battelle for the U.S. Department of Energy MSU Visit., July 23, 2010 Cold Cathode Gages Two types of CCG on the existing CM. They are located on the Insulating Vacuum and on the Fundamental Power Coupler (FPC) CCG failure in the insulating vacuum are considered a nuisance failure and does not affect machine reliability FPC cold cathode gauges, provide interlock signals for window protection, proved to be troublesome and unreliable in operation, often with an erratic signal character. Operational input is being transitioned from CCG to electron probe interlock for RF window protection

8Managed by UT-Battelle for the U.S. Department of Energy MSU Visit., July 23, 2010 Tuner Pressure fluctuations, 2-4-2K transition, component installation issues, and component manufacturing issues  about 14 tuners have been repaired. – Harmonic driver, piezo stack and/or motor failure – Worn out in progress, loosen connection, slips; unstable mechanical boundary; irregular detuning Piezo Actuator (2X) Flexure Connection to Cavity (2X) Flexure Connection to Helium Vessel Motor & Harmonic Drive Connection to Helium Vessel

9Managed by UT-Battelle for the U.S. Department of Energy MSU Visit., July 23, 2010 Failed piezo at tuner end

10Managed by UT-Battelle for the U.S. Department of Energy MSU Visit., July 23, 2010 Failed piezo base

11Managed by UT-Battelle for the U.S. Department of Energy MSU Visit., July 23, 2010 Harmonic Drive Components

12Managed by UT-Battelle for the U.S. Department of Energy MSU Visit., July 23, 2010 Harmonic Drive operating principle

13Managed by UT-Battelle for the U.S. Department of Energy MSU Visit., July 23, 2010 Harmonic Drive Operating Principle

14Managed by UT-Battelle for the U.S. Department of Energy MSU Visit., July 23, 2010

15Managed by UT-Battelle for the U.S. Department of Energy MSU Visit., July 23, 2010

16Managed by UT-Battelle for the U.S. Department of Energy MSU Visit., July 23, 2010 HOM coupler issues – Introduced to avoid beam break-up and cavity heating from high order mode (very small probability) – Some cases showed excessive fundamental power coupling and attenuator damage – 6 HOMs feed throughs have been removed from 2 CM

17Managed by UT-Battelle for the U.S. Department of Energy MSU Visit., July 23, 2010 HOM in SNS SNS HOM history Beam breakup & instability; no issue HOM power is the main reason for SNS to have HOM coupler (but chance is very small) More realistic analysis with actual frequency distributions measured. Probabilities for hitting dangerous beam spectral lines are much less. Future concerns HOM feedthroughs will be taken out as needed Spare cryomodule Does not have HOM feedthroughs for cavities PUP cryomodule Will not have HOM couplers for new cavities

18Managed by UT-Battelle for the U.S. Department of Energy MSU Visit., July 23, 2010 Helium Circuit and Beamline Leaks Predominately ceramic feed throughs in end cans – Multiple have been replaced – Spare and PUP CM end cans will not use these ceramic feedthroughs HOM ceramic feed throughs have also been an issue – Spare and PUP CMs eliminate the HOM ceramic feedthrough Also experienced one end dish to helium tank weld leak

19Managed by UT-Battelle for the U.S. Department of Energy MSU Visit., July 23, 2010 CM23 Repair Leak in the weld between the NbTi end dish and the Ti Helium vessel. Was repaired in the Front End building by SNS personnel.

20Managed by UT-Battelle for the U.S. Department of Energy MSU Visit., July 23, 2010 Loose RF Cable Two incidences of loose RF cable impacting operations Cryomodule warm-up procedure now includes step verifying cable tightness

21Managed by UT-Battelle for the U.S. Department of Energy MSU Visit., July 23, 2010 SNS SCL, Operations and Performance We have learned a lot in the last 6 years about operation of pulsed SC linacs: – Operating temperature, Heating by electron loadings (cavity, FPC, beam pipes), Multipacting & Turn-on difficulties, HOM coupler issues, RF Control, Tuner issues, Beam loss, interlocks/MPS, alarms, monitoring, … Current operating parameters are providing very stable and reliable SCL operation – Less than one trip of the SCL per day mainly by errant beam or control noise Proactive maintenance strategy (fix annoyances/problems before they limit performance) Several cryomodules were successfully repaired without disassembly – Multiple beam-line repairs were successfully performed

22Managed by UT-Battelle for the U.S. Department of Energy MSU Visit., July 23, 2010 Thank you for your attention!