201 Mhz Cavity Installation. Removing Old 201 Cavity Came in through door with fork lift Will go out through labyrinth Requires new 3 ton Gantry crane.

Slides:



Advertisements
Similar presentations
Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
Advertisements

Starter Solenoid Contacts Replacement Sherco Automotive Supply
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
MER/SUP 1 DOOR EVAPERATOR DRAIN PAN REPLACEMENT 1. Remove the (4) screws that secure the evaporator coil, using a 5/16” socket.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
HFT Safety --PXL detector September 26, Dana Beavis.
Vacuum Vessel Production Readiness Review
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
2004 BRASS INSTALLATION HARDWARE. BRASS INSTALLATION FOR 2004 TOP AND BOTTOM SEXTANTS ONLY PROCEEDURE AND FIXTURES FOR TOP AND BOTTOM ARE SIMULAR.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements ( )
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
5.8m Solar House Installation Instruction. Introduction Step 1. connect the corner panels Step 2. connect the back and side wall panels Step 3. Install.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
H. Hayano, KEK, New SRF Facility at Belgrade SRF-WG.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
Barrel Calorimeter Support Mechanism Two designs are proposed for review –Design1. Individual module (Segment) of the Barrel Calorimeter is placed inside.
805 MHz Status IIT NFMCC Meeting March 12-15, 2006 A. Moretti March 12, 2006.
Issues with variable thickness absorbers Iouri Ivaniouchenkov, RAL MICE Video Conference, 22 Jan
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
GLAST LAT ProjectMarch 08, 2004 Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation]
RICH Installation and integration in CLAS12 October 13 th 2015 D. Orecchini, S. Tomassini 1 CLAS12 RICH- Mid Term Review.
Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) 19/03/2014Mathieu Therasse BE/RF/SRF1 Special Linac WG meeting:
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
MTA RF Status 01/31/ 2007 NF&MCC Meeting UCLA A. Moretti.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
GLAST LAT Project Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation] –A)
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
China Gracemac Paper Limited. 1 Lift the printer cover door.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
LIU-SPS RF Power upgrade | 09 December 2015.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
Chicago-Area Industrial Spaces Looking for off-site assembly spaces.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
US Construction Project: SSs, PRY, Cavities and test program 1.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
Completion of the MICE-US construction project
CERN – Zanon discussions
HAMANASI Truss Installation Graphics February 2014
ILC-SCRF Test Facilities considerations
ELENA electron cooler and SEM grids status
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
WP 3 coordination meeting Saclay May 2008
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
RDR Baseline Layouts for Interaction Region
Ferrol Shipyard Total area : m² Dock equipment : m.
Cryomodule transportation strategies
Presentation transcript:

201 Mhz Cavity Installation

Removing Old 201 Cavity Came in through door with fork lift Will go out through labyrinth Requires new 3 ton Gantry crane – To remove from stage Will roll out using 4 casters

On Operational Stand

201 Module Installation Will bring into MTA hall through labyrinth Heavily ribbed doors are too wide for labyrinth – Will remove and roll in doors separately – Put on thin cover plate to keep module inside clean Stand is too tall for clean room and labyrinth – New “transport” stand is 10” shorter

On Transport Stand, thin doors

Lab 6 Clean Room Once doors removed & transport stand installed Cavity installation – Vertical – In Lab 6 clean room – Class 100 – Insertion picture shown is old design – Allan DeMello is sending new design soon – Mechanical and electrical testing in clean room too

Assembly in MTA Hall Remove transport stand, install operational stand In MTA Clean Room – Install doors – RF Couplers – Other vacuum hardware

Put on doors in MTA clean room