Frascati, 15 February 2012 Slide 1 DREAM Task 4 Feasibility Analysis Server and Client - Implementation plans for SPS within the DREAM project Presentation.

Slides:



Advertisements
Similar presentations
Software Development Life Cycle. Why Do We need Software Development Models Helps to make sure that we cover all bases during planning and implementation.
Advertisements

©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 4 Slide 1 Software Processes.
Software Processes Coherent sets of activities for specifying, designing, implementing and testing software systems.
1 Independent Verification and Validation Current Status, Challenges, and Research Opportunities Dan McCaugherty IV&V Program Manager Titan Systems Corporation.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 4 Slide 1 Software Processes.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 18 Slide 1 Software Reuse 2.
LIGHTNESS Introduction 10th Oct, 2012 Low latency and hIGH Throughput dynamic NEtwork infrastructureS for high performance datacentre interconnectS.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 4 Slide 1 Software Processes.
©Ian Sommerville 2000, Mejia-Alvarez 2009 Slide 1 Software Processes l Coherent sets of activities for specifying, designing, implementing and testing.
® IBM Software Group © 2007 IBM Corporation J2EE Web Component Introduction
Software Engineering Management Lecture 1 The Software Process.
Lecture 3 Software Engineering Models (Cont.)
1 Some initial Design suggestions… Getting started… where to begin? Find out whether your design architecture will work… as soon as possible. If you need.
1 SWE Introduction to Software Engineering Lecture 4.
SOFTWARE DESIGN AND ARCHITECTURE LECTURE 05. Review Software design methods Design Paradigms Typical Design Trade-offs.
Our goal is to make a web based multi-user organizer that can be accessed via cellular devices. There are three main component for this project: A main.
Unified Distributed (UDub Mail) Life Cycle Objectives Sachin Pradhan Gabriel Maganis.
Petals SAP Point Of Sale System Second Project Presentation M.Tech Team SE 15 (Saturday) Team Aug-2008.
February, TRANSCEND SHIRO-CAS INTEGRATION ANALYSIS.
Implementation of SCENS Yan Zhao. Current Status Current implementation is web-based –
Proposal Nemo Hajiyusuf Ekaterina Mineeva Arpi Shaverdian.
OpenCIT and OpenTicket Demonstrating the functionality of the OpenEngSB.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
ZLOT The Z Texas Implementation Component of the Library of Texas Dr. William E. Moen Principal Investigator.
HMA Sep 2009 – Slide 1 Daniele Marchionni Elsag Datamat HMA Follow On – Task 4 - Workplan.
05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Teleconference, 22 October 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Progress Meeting 26 Nov 2008, by.
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Page 1Overview of the HMA Project, 8 March 2010 Overview of the HMA Project OGC TC Opening Plenary Pier Giorgio Marchetti European Space Agency.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
HMA-FO ODA, January 2011 HMA Follow-On Task 3 Online Data Access in the frame of ESA's Heterogeneous Missions Accessibility (HMA) initiative Acceptance.
1 CleanSeaNet DREAM PRESENTATION. Content Short introduction to EMSA EMSA Objectives and expected main results from DREAM EMSA Activity/Processes to which.
Page /06/2014HMA-S Final Presentation - 11/06/2014 HMA for Science Executive Summary Y. Coene, Spacebel s.a. C. Gizzi, Airbus Defence and Space Final.
HMA-T Progress Meeting 26 November 2008 Slide 1 IMAA-CNR activity report HMA-T Progress Meeting 26 November 2008 S. Nativi, E. Boldrini, F. Papeschi IMAA-CNR.
HMA AWG, 6 November 2013 Slide 1 HMA for Science - Status HMA AWG Meeting 6 November 2013, ESRIN Frascati Yves Coene, Spacebel s.a. Claudio Gizzi, Astrium.
Spacebel - Hoeilaart, February 2009 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Acceptance Review 1 18.
19 January 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Ricardo.
Open GIS Consortium Charles Heazel March 19, 2003.
HMA Follow On Activities
HMA AWG Configuration Management Status 1 December 2008
HMA Follow On Activities
Software Engineering Management
DREAM High-Level Architecture
HMA Follow On Activities
WPS updates from ESA Projects
HMA Identity Management Status
Multilevel Marketing Tree Viewer
HMA Follow On Activities
OGC Web Processing Service 2.0 SWG Insights from last TC OGC
HMA SPS Mandatory I/F Development
Data Access Operational Interfaces for GMES Contributing Missions
HMA Follow On Activities
HMA Follow On Activities
HMA-Testbed Phase 2 AR-2 Meeting July 2009, Frascati
HMA Follow On Activities
Contributions to Testing and Reference Data
HMA Follow On Activities
Standardisation Status Update
DREAM Project CSA-ESA Bilateral Meeting 16 February, Frascati
Pier Giorgio Marchetti, Philippe Mougnaud European Space Agency
Software Design Lecture : 14.
OGC and activities HMA-T Phase 2 KO Meeting
Status OpenSearch Standardisation Activities - HMA-S Project
Project Change Control
Pier Giorgio Marchetti - European Space Agency
HMA for Science Task 1 – Project Management
Web Service Security support in the SSE Toolbox
CNR-IMAA Proposal ( and )
Presentation transcript:

Frascati, 15 February 2012 Slide 1 DREAM Task 4 Feasibility Analysis Server and Client - Implementation plans for SPS within the DREAM project Presentation to HMA AWG 15 February 2012 Corentin Guillo, Astrium Ltd

Frascati, 15 February 2012 Slide 2 DREAM Task 4 Objectives  Implement a demonstrator that would: Re-use the HMA-FO SFRE Prototype (SPS Interfaces hard- coded)  sweCommon 2.0 (Data Model and Service Model)  Sensor Planning Service 2.0  EO Extension for Sensor Planning Service 2.0 Implement SPS Evolutions (Dynamic SPS interfaces) and upgrade the EO CFI Offer to EMSA a better responsiveness than the GEST system for emergency request (taking into consideration the existing CleanSeaNet System and user needs) Take into account ngEO and DAIL systems evolution Be integrated in the overall DREAM system

Frascati, 15 February 2012 Slide 3 Prototype Architecture

Frascati, 15 February 2012 Slide 4 SoW Requirements

Frascati, 15 February 2012 Slide 5 System Delivered Data Dissemination based on ngEO concept and technologies

Frascati, 15 February 2012 Slide 6 End-to-end Demonstration

Frascati, 15 February 2012 Slide 7 Evolution within the DAIL

Frascati, 15 February 2012 Slide 8 Evolution within ngEO

Frascati, 15 February 2012 Slide 9 Step Forwards  Integration of the feasibility analysis servers into the DAIL as a permanent test-bed (SPS Interface validation)  Early Integration of GCMs (Spotimage, CSA…)  IVV of SPS 2.0 for the DAIL-SSE Consolidation  ngEO Evolution, CDS V3?