Frascati, 15 February 2012 Slide 1 DREAM Task 4 Feasibility Analysis Server and Client - Implementation plans for SPS within the DREAM project Presentation to HMA AWG 15 February 2012 Corentin Guillo, Astrium Ltd
Frascati, 15 February 2012 Slide 2 DREAM Task 4 Objectives Implement a demonstrator that would: Re-use the HMA-FO SFRE Prototype (SPS Interfaces hard- coded) sweCommon 2.0 (Data Model and Service Model) Sensor Planning Service 2.0 EO Extension for Sensor Planning Service 2.0 Implement SPS Evolutions (Dynamic SPS interfaces) and upgrade the EO CFI Offer to EMSA a better responsiveness than the GEST system for emergency request (taking into consideration the existing CleanSeaNet System and user needs) Take into account ngEO and DAIL systems evolution Be integrated in the overall DREAM system
Frascati, 15 February 2012 Slide 3 Prototype Architecture
Frascati, 15 February 2012 Slide 4 SoW Requirements
Frascati, 15 February 2012 Slide 5 System Delivered Data Dissemination based on ngEO concept and technologies
Frascati, 15 February 2012 Slide 6 End-to-end Demonstration
Frascati, 15 February 2012 Slide 7 Evolution within the DAIL
Frascati, 15 February 2012 Slide 8 Evolution within ngEO
Frascati, 15 February 2012 Slide 9 Step Forwards Integration of the feasibility analysis servers into the DAIL as a permanent test-bed (SPS Interface validation) Early Integration of GCMs (Spotimage, CSA…) IVV of SPS 2.0 for the DAIL-SSE Consolidation ngEO Evolution, CDS V3?