Report on Payload and Calibration splinter meeting B. Maffei M. Bersanelli 1CERN 17-20 May 2016.

Slides:



Advertisements
Similar presentations
FP7 Preparations ISTC meeting 31 March Content FP7 preparation approach and timetable Context for FP7 and for ICT in FP7 Research in New Financial.
Advertisements

Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Space environment and detection : lessons learned from PLANCK/HFI François PAJOT Institut d'Astrophysique Spatiale François PAJOT Institut d'Astrophysique.
Aug.19, 1999 George T. Roach Integration Mission Design Center NASA- GSFC Code 543 Greenbelt, MD FAX
Thermal Design and Modeling for Infra Red Spectroscopic Imaging Survey Payload (IRSIS) S. L. D’Costa.
Solar Orbiter EUV Spectrometer
07/07/2005 Coupling with PF2012: No existing PF “as is” able to accommodate Karin On going study in France to develop a new generation of PF product line.
B-pol optical configurations Telescopes and Focal plane options B. Maffei for the B-pol collaboration G. Pisano A. Murphy T. Peacocke.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
14/06/20151 MORE Requirements seen from ESA Pedro Pablos 1 st MORE Team Meeting 27 Febrero 2007.
Cryogenics for B-Pol S. Masi, reporting from F.X. Desert L. Piccirillo …. Use SAMPAN as a baseline, and look for improvements/variations.
Millimetron mision sensitivities and instrumentation concept
Constellation Orion Visible Light Constellation Orion Infrared Light.
SLAC, May 12th, 2004J.L. Puget PLANCK J.L. Puget Institut d'Astrophysique Spatiale Orsay.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Optical characteristics of the EUV spectrometer for the normal-incidence region L. Poletto, G. Tondello Istituto Nazionale per la Fisica della Materia.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
Cardiff University Astronomy Instrumentation Group IRAM Camera meeting October 13-14, Cardiff University Astronomical Instrumentation Peter Ade.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
Close Cycle Dilution for Space Ph. Camus, G. Vermeulen, G. Chaudhry, A. Benoit, F. Martin B-POL Workshop, IAP Paris, 29th July 2010.
Student Satellite Project University of Arizona Team Goals Design, Fabricate, and Analyze a Structure that will Support the Payload –Space Allocation of.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
Engineering: NAHUAL Ireland Acquisition Camera, Focal Plane Mechanisms and Layout Tully Peacocke, National University of Ireland Maynooth Carlos del Burgo,
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
Design study for ET 3rd generation Gravitational Wave Interferometer Work Package 2 Suspension, Thermal noise and Cryogenics Piero Rapagnani
1 A. Boccaletti Pasadena, Sept th Imaging EGPs with JWST/MIRI and VLT/SPHERE valuable experiences for TPF-C A. Boccaletti, P. Baudoz D. Rouan + coronagraphic.
Advanced VIRGO WG1: Status VIRGO, Cascina Andreas Freise University of Birmingham.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
Space Research Centre EDDICAM Interests in EDDINGTON Professor Alan Wells and Dr Matthew Burleigh Space Research Centre, University of Leicester.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
3.1 Optomechanical systems (1) Scientific and engineering resources are available to carry out the optomechanical work on DECam. The highly distributed.
B-pol optical configurations B. Maffei (JBCA – University of Manchester) C. O’Sullivan (NUI Maynooth)
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Cryogenics for FPP S. Masi Two inter-related issues: –Cryogenic chain for the focal plane (final temperature 0.1K) –Thermal system to radiatively cool.
N I K A Grenoble (Néel, IRAM, LPSC, LAOG) Cardiff SRON Roma-Trento Néel IRAM KIDs Array Grenoble (Néel, IRAM, LPSC, LAOG) Cardiff SRON Roma-Trento.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
Thoughts on the Design of a WVR for Alan Roy (MPIfR) the Twin Telescope at Wettzell.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
The GRI Laue-lens and lens spacecraft - configuration options - lens performance calculations Niels Lund Danish National Space Center.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
Kinetic Temperature Retrievals from MGS TES Bolometer Measurements: Current Status and Future Plans A.A. Kutepov, A.G. Feofilov, L.Rezac July 28, 2009,
B-Pol L. Piccirillo Jodrell Bank Centre for Astrophysics (University of Manchester) A European mission to get a CMB polarization measurement limited only.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
Extended Detector Cutoff Considerations WFIRST Project Office May
K-Band Focal Plane Array Project Engineering Overview Matt Morgan National Radio Astronomy Observatory 2/27/2008.
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
Multi-Microhannel Cooling Model Silicon Micro-Cooling Element to be applied on a pixel detector of CERN (ALICE) / Parametric Study Footprint area: (6.0.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
The integration of 420 m detectors into the LHC
EXTP Accomodation Study Hong Bin, Zhang Long Institute of Spacecraft System Engineering. CAST Oct 27th, 2015.
Cryogenic Cooling Schemes for the SPL U. Wagner TE-CRG.
SpaceTEG feasibility study May 1, 2005 B. Tuinstra.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Giampaolo Pisano Radioastronomy Technology Group Jodrell Bank Centre for Astrophysics, University of Manchester, UK B-Pol Meeting - Paris, July 2010.
Introduction to JEM/SMILES
Internal review of IR2 LEP cryostats (WP11/WP5) Close out session
Second SPL Collaboration Meeting, Vancouver May 2009
TBM thermal modelling status
Cryogenics, Cryostat, Optics Technology Development
JEM-SMILES Instrumental Capabilities
Nov. 19, 2009 prepared by H. Matsuhara, N. Takahashi, T. Nakagawa
A High Intensity Neutrino Oscillation Facility in Europe
TEC assembly and commissioning at Lyon
SPICA / FPI Mechanical /Optical Issues
as a prototype for Super c-tau factory
THERMAL CONTROL SYSTEM
Presentation transcript:

Report on Payload and Calibration splinter meeting B. Maffei M. Bersanelli 1CERN May 2016

Payload requirements in order of priority ? (at least from ESA perspective) Costs – 550 M€ + EU National agencies ? + External collaborators ? Cannot take into account externals for the proposal Probably 650M€ max High TRL and low risk scheme – Need to pass the “technology screening” Dimension envelope – Ariane 6 fairing cylinder of 4.6m diameter x 4m high – 2m diameter, 2 m height available for payload Mass – Safely assume that we cannot go beyond Planck mission – COrE+ 2014: 1958 kg; Planck was 1500kg Power consumption – Will dictate if we need deployable solar panels or not (added risks) – COrE+ 2014: 2073 W; Planck was 1700 W Data rate – COrE+ 2014: 2.4 Mbits/s 2CERN May 2016

Payload trade-off – Sub-systems cannot be treated independently 3 Size and configuration of the telescope No more than 1.5m diameter primary Rather 1.2m Cannot use CTR configuration No HWP (at least as the first element) (Cost, Dimensions & Mass) Size and configuration of the telescope No more than 1.5m diameter primary Rather 1.2m Cannot use CTR configuration No HWP (at least as the first element) (Cost, Dimensions & Mass) Descope ? Impact on Science? Descope ? Impact on Science? Complex scanning strategy Impact on solar panels size Impact on data transfer (Cost, Power, Data transfer) Complex scanning strategy Impact on solar panels size Impact on data transfer (Cost, Power, Data transfer) Cooling chain Passive / active Choice: impact on signal, …. (Cost, Power, dimensions, mass, TRL) Cooling chain Passive / active Choice: impact on signal, …. (Cost, Power, dimensions, mass, TRL) Ground Tests and calibration Impact on in-flight calibration (Cost, Schedule, Risks) Ground Tests and calibration Impact on in-flight calibration (Cost, Schedule, Risks) FPU and number of detectors Technology (EU) (Cost, Power, cooling power, Data transfer, dimensions, mass, TRL) FPU and number of detectors Technology (EU) (Cost, Power, cooling power, Data transfer, dimensions, mass, TRL) CERN May 2016

4

5

6

7

8

9

10

CERN May

CERN May

CERN May Will need to think seriously about the impact as this is a way to cut cost !

Cryogenics: Lessons learnt from Planck Need for a system engineering from the start ! – Contrary to Planck where this was set up towards the end Margin management – critical without system coordination Testing is never too much ! – Anticipate testing with different models – test subsystems together CERN May G. Morgante

How to achieve 20K ? Sorption cooler based on Planck heritage performed well – Expertise “lost” in the US who provided Planck 20K cooler – Could be developed in Europe with Planck expertise: Possible backup solution. Pulse Tube Cooler could be the solution – Advantages Lower base temperature (15K) Lower mass Also provide cooling power at 100K – Disadvantage Mechanical cooler  vibrations But should be low enough (TBC) and KID detectors are less prone to microphonics vs TES CERN May

CERN May Y. Pennec – Air Liquide Soon to be developed to TRL6 by Air Liquide

CERN May G. Vermeulen

CERN May Plan only - not yet funded !

Comments from Y. Pennec Heritage from Planck is invaluable – V-Groove + Dilution + Structure Cryo chain for CORE feasible but extremely challenging Do not underestimate mechanical design constraints – launch locks/Isolators/Dampers/Supports CCDR is ready for an EM level development (funding?) Priority: define realistic cryostat Critical inputs: define thermal loads – Depends on detector technology Main issue is not 100K/40K telescope The scary bit: mass of the focal plane – 30 kg as for the M4 proposal would be extremely challenging (and probably very costly) – 3 – 5 kg more reasonable CERN May

Cryogenic chain comment / conclusions & Actions Open Dilution Refrigerator (Planck) a possibility ? – Price of 3 He might not be such a big issue in comparison to the cost of developing the CCDR – It will depend on the cooling power needed FPU mass and dissipation – Has a limited lifetime Actions to go forward – Define the cooling needs and the mass of the FPU M. Bersanelli, Joel Ullom et al: Evaluate Mass of focal plane with horns with Aluminum platelets, coated silicon (or combination) – J. Delabrouille: to ask CNES for thermo mechanical structure basic design – To be given as input to Y. Pennec to refine thermal/cryo analysis CERN May

Systematics CERN May A. Mennella

CERN May

CERN May

CERN May

CERN May

Ground Calibration CERN May M. Bersanelli: Large heritage from Planck Challenge: ∼ 100 times more channels, ∼ 30 times deeper From Planck

CERN May

CERN May

CERN May

Planck Telescope: alignment Mechanical alignment Photogrammetry Specific RF component added on FPU for ground tests – Extra horn + diode at 320 GHz (RTH) 30CERN May 2016

31

Beam verification for Planck CERN May ESA - Thales Tauber J. et al, A&A GHz Xpol 320 GHz copol Comparison between simulations and measurements MeasuredSimulated Main beams 4π

Optical simulations Very good agreement between RF measurements and GRASP simulations Further progress in optical simulations performed since then – Talk from F. Villa, M. Sandri et al – GRASP adapted for focal surface evaluation (WaFER tool) Other tools will most probably need to be developed – We need an excellent RF model of the instrument – Tools developed for R&D need to be adapted – FEA, MoM,….. – Then fed back into GRASP CERN May

Optical testing and verification From Planck to COrE Similarities – Telescope: Can re-use the same technology – Can re-use verification / alignment procedures ? Differences – Many more pixels (10s to 1000s) + More spectral bands (9 to 15?)  which testing strategy? Test on samples for components? Then rely on integrated tests on overall instrument? – Calibration needs more accuracy due to increase sensitivity (x30)  need to have a better understanding of the instrument / reduce systematics Will need to use more accurate testing equipment – Different technology Use of planar / lens technology with possibility of cold stop and potentially higher straylight 34CERN May 2016

FPU Technology 1000s of pixels  Is it realistic to use horns? If European technology used – Use of planar / lens technology with possibility of cold stop and potentially higher straylight 35 ~15cm Few mm Detectors + lens? Band-pass filter Common filters HFI bolometric detector FPU scheme How to get an accurate representative measurement? Array CERN May 2016

Equivalent of RFQM beam measurement Telescope with a cold instrument in CTR? – Unlikely feasible by industry (Thales, Airbus space) or at a huge cost – Warm instrument  need to replace detector – Could we think of a test at Liege facility? – Will need combination of validation tests 36 Detectors + lens? Band-pass filter Common filters ? Design of cavity-backed sinuous antenna with baluns. Cold stop ? Baffles CERN May 2016

Conclusion on Calibration and Verification Calibration and Verification for COrE will be extremely challenging – More detectors, more bands, higher specs Strategy has to be thought well in advance Need to re-use what has been used for Planck as much as we can – But not all tests can be re-cycled – Will need to come up with new tests depending on technology used We probably need to include a calibration strategy / plan in the proposal 37CERN May 2016