LBT Q4 2007 Engineering Review HBSC Hydrostatic Bearing System.

Slides:



Advertisements
Similar presentations
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
Advertisements

LBT Q Engineering Review ALPC – Primary Mirror Aluminum Shooting.
MCS-Connect Intro to Connect Connection and Setup Display Menus Graphics Uses in troubleshooting Overview.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Office 2003 Introductory Concepts and Techniques M i c r o s o f t Access Web Feature Sharing Data among Applications.
Next Home Remote Controlled Cliqueur troubleshooting guide Start the slide show then click Next.
Software Evolution Planning CIS 376 Bruce R. Maxim UM-Dearborn.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
Windows Basics: Desktop, Taskbar and Window
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
ICC Features Features Supporting unlimited projects per ICC –Advanced technical support Friendly registration utility 5 password-levels exceptional workspace.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Mathew Watkins: Project Manger Larry Wu: Hardware Engineer Eric Robbins : Software Engineer Libby John: Systems Engineer Sponsor: Jeff Smith Advisor: Dr.
Advanced CIS NAME: ___________________. OBJECTIVE: Maintaining, Managing, and Troubleshooting Systems Maintenance includes following established procedures.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status Sam Burke UCSB HEP Group.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LHC Collimators low level control rack test experience in CNGS A Masi, LHC Collimators low level control rack test experience in CNGS LHC Collimators low.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
Communications & Computer Networks Resource Notes - Network Hardware
LBT Q Engineering Review Instrument Cooling.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Engineering Review SAB Static Balancing.
Communicating Visually with Visio Gini Courter Annette Marquis.
MCS-Connect Revision - 12/22/2015.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
Programming Fx Plc And HMI Step 1 Set Up The HMI For Transparency.
Chapter - Software Engineering Fail safe design problems Component jams Operator detected failure Erroneous input Unsafe modes Programming errors Sabotage.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Engineering/Software Review ROTRotators.
Configuring a New Program in PLC’s Window 7. Step 1 Click on the Blank Paper icon to begin a new program.
Managing Your Computer Staff Development Day January 14, 2008 Presenter: Jenny Wallskog.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
Welcome to Computer Solutions 1! Before we begin our nine weeks, it is important that you have some basic knowledge about using and maintaining your computer.
E2Q6 Rectangular Proximity Sensor Customer Presentation September 2015.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
LBT Q Engineering Review Primary Mirror Cells.
PRESENTATION ON AUTOMATION,PLC AND SCADA
Using the Mouse Dead Application
بسم الله الرحمن الرحيم الموضوع:الوضوء صفته وفرائضه وسننه
Laptops and Windows tips
Instrumentation and control
Presentation transcript:

LBT Q Engineering Review HBSC Hydrostatic Bearing System

21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Capillary adaptors installed on Az and EL in L-R corner. Capillary adaptors installed on Az and EL in L-R corner. Limited measurements made with proximity sensor Limited measurements made with proximity sensor We can now read the status of the stow pins and stow pin proximity switches when in local or remote mode on the SCP. We can now read the status of the stow pins and stow pin proximity switches when in local or remote mode on the SCP. Can locally save changes to flash card Can locally save changes to flash card

21-Dec-2007LBT Q Engineering Review

21-Dec-2007LBT Q Engineering Review

21-Dec-2007LBT Q Engineering Review

21-Dec-2007LBT Q Engineering Review

21-Dec-2007LBT Q Engineering Review

21-Dec-2007LBT Q Engineering Review Open Issues Technical Technical PLC Control law unknown, undocumented. PLC Control law unknown, undocumented. Firewall not penetrable for WinCC Firewall not penetrable for WinCC Capillaries adaptors not installed in El and Az pads 1, 2 & 3 Capillaries adaptors not installed in El and Az pads 1, 2 & 3 Capillaries not installed in any El and Az pads Capillaries not installed in any El and Az pads Capillaries uncharacterized/adjusted Capillaries uncharacterized/adjusted Schedule Schedule None None Financial Financial None None Resource Resource Mountain support pacing operation Mountain support pacing operation Network and Firewall communications issues unresolved Network and Firewall communications issues unresolved

21-Dec-2007LBT Q Engineering Review Progress (Q4/2007) Capillary adaptors installed on Az and EL in L-R corner. Capillary adaptors installed on Az and EL in L-R corner. Limited measurements made with proximity sensor Limited measurements made with proximity sensor We can now read the status of the stow pins and stow pin proximity switches when in local or remote mode on the SCP. We can now read the status of the stow pins and stow pin proximity switches when in local or remote mode on the SCP. Can locally save changes to flash card Can locally save changes to flash card

21-Dec-2007LBT Q Engineering Review Planning (Q1/2008) Move the El and Az capillaries to the pads and resize Move the El and Az capillaries to the pads and resize Systematic measurement of lift, tuning system to maximize stiffness Systematic measurement of lift, tuning system to maximize stiffness Replace hoses with hard pipe on level 5 Replace hoses with hard pipe on level 5 Document existing S7 code with a process flowchart (VoltsDC) Document existing S7 code with a process flowchart (VoltsDC) Describe new control laws correcting: Describe new control laws correcting: pressure OK pressure OK system shutdown when pocket pressures fail system shutdown when pocket pressures fail control around pressure, not lookup table (LBT) control around pressure, not lookup table (LBT) Rewrite PLC code using new control laws (VoltsDC) Rewrite PLC code using new control laws (VoltsDC) Reduce system pressure from 120 to 95 bar. Reduce system pressure from 120 to 95 bar.