Environmental Mitigation and ePM Project Commitment Database.

Slides:



Advertisements
Similar presentations
Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.
Advertisements

Indistar® Leadership Team Meetings. Where can we plan a meeting? Choose ‘Plan Your Meeting’ from the main menu screen Click on Meeting Agenda Setup.
Environmental Commitments Categorical Exclusion Training Class.
KompoZer. This is what KompoZer will look like with a blank document open. As you can see, there are a lot of icons for beginning users. But don't be.
NEW PROGRAMMATIC CATEGORICAL EXCLUSION AGREEMENT A WORK IN PROGRESS… ODOT—Office of Environmental Services Environmental Update Meeting20 November 2014.
Introducing the National Guard Performance Appraisal Application (PAA) PAA 201: Supervisor Training This briefing is UNCLASSIFIED Joint Force Headquarters.
CPIT 102 CPIT 102 CHAPTER 1 COLLABORATING on DOCUMENTS.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
Orchard Harvest™ LIS Review Results Training
Order to Dismiss a Petition Pennsylvania’s Protection From Abuse Database.
Left Navigation Bar – Account Management (Non-JHED Users Only) – eIRB Training – My IRB Studies – Create New Application Welcome Message.
Word Lesson 8 Increasing Efficiency Using Word
1 of 5 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2006 Microsoft Corporation.
WETLANDS and ODOT Environmental Services Oregon Department of Transportation.
Working with SharePoint Document Libraries. What are document libraries? Document libraries are collections of files that you can share with team members.
WETLANDS and LOCAL PROGRAMS Environmental Services Oregon Department of Transportation.
Performance Appraisal Application (PAA). Rating Cycle Rating Official reviews and approves the Performance Plan Rating Official Transfers to Higher Level.
Indistar® Leadership Team Meetings. Where can we plan a meeting? From the Navigation Toolbar, simply click on ‘Team Agendas & Meetings’
Software Enhancements Operations keeps the lights on, strategy provides a light at the end of the tunnel, but project management is the train engine that.
Tutorial 6 Using Form Tools and Creating Custom Forms
Module 7: Construction Phase
Welcome to Century Equipment’s Shop Online Website! This presentation will highlight some of it’s key features.
1) Main Menu: You can access all aspects of the database from this screen 2) Contacts: You can access the “contact database management” side of the program.
PROCAL-TRACK VIRTUAL JOB SHEET & INSTRUMENT STATUS.
Automated OUTLAY REPORT. The is an Excel spreadsheet which is used to track all funds related to the project, from beginning to end.
Ensuring a desirable workplace which creates a diverse team of all kinds of people and professions. To be a progressive state transportation agency recognized.
This document focuses on setting up and maintaining agency information Total Pages: 20 SMART Agency Administration Tipsheet Agency Administration Agency.
UNCLASSIFIED / FOUO Introducing the National Guard Performance Appraisal Application (PAA) This briefing is UNCLASSIFIED.
Using Form Tools and Creating Custom Forms Microsoft Access 2010.
Microsoft Access Get a green book. Page AC 2 Define Access Define database.
Sharepoint Getting started. Please log on to the Adult and Family Education website: adulted.d11.org Then go to AFE Teaching Staff and click on Valerie.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
2014 © 2014, Battelle for Kids. All Rights Reserved. ROSTER VERIFICATION Teacher Guide.
1 OPOL Training (OrderPro Online) Prepared by Christina Van Metre Independent Educational Consultant CTO, Business Development Team © Training Version.
XP New Perspectives on Microsoft Word 2002 Tutorial 31 Microsoft Word 2002 Tutorial 3 – Creating a Multiple-Page Report.
1 OrderPro Point of Sale (POS) Training Prepared by Christina Van Metre Independent Educational Consultant CTO, Business Development Team © Training Version.
Approve Documents (Requisitions) in Owl Link Updated May 3, 2012.
Microsoft Access You will need a pen/pencil.. What is Microsoft Access? Access is a database management system.  Create a database, add/change delete.
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
KRONOS Electronic Timekeeping 5.1 Upgrade. The Payroll Department Upgrades KRONOS!!!  With this new system upgrade comes a few enhancements.  Timecard.
Omeka Creating Exhibits. Select “Create an Exhibit” Log in to Omeka at:
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
BA Team: Product Ownership, Analysis, and Solution Design BA Bi-Weekly Mini-meeting May 19, Acceptance Criteria Defining Success one Story.
Course ILT Forms and queries Unit objectives Create forms by using AutoForm and the Form Wizard, and add or modify form headers and footers Open and enter.
INFORMATION TECHNOLOGY DATABASE MANAGEMENT. Adding a new field 1Right click the table name and select design view 2Type the field information at the end.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Locally Administered Federal-Aid Project Initiation Workshop Prospectus Part 3 and NEPA Requirements Presenter: Howard Postovit; ODOT Region 5 Region Environmental.
4 th grade Excel.  Omemc Omemc.
Section 4(f)/6(f) Categorical Exclusion Training Class.
AESuniversity User Tips & Tricks. Where to Search – NEW client 1.Quickest search for New Client is Demographics page in HOH Check field 2.Or enter Social.
Federal Lands Highway Commitment to Excellence Environmental Concerns with Estimating TEA/TUG Conference Portland, Maine October 2006 Jack Van Dop Eastern.
When the program is first started a wizard will start to setup your Lemming App. Enter your company name and owner in the fields designated “Company Name”
Adding/Removing Responsible Party This module will discuss how to add and remove Responsible Party information.
Warranty – Online Tag This great new feature allows Warranty Tags to be created in Order Entry accessing JEN. This is the first phase in a 3-part project.
UNCLASSIFIED / FOUO Introducing the National Guard Performance Appraisal Application (PAA) for Rating Official and HLR This briefing is UNCLASSIFIED.
1 Introduction to MBProject. 2 Part I: MBProject and how it is used. Part II: What MBProject might do in the future. Also, as-built data collection and.
This tip sheet focuses on how to share client records and make client referrals using SMART. Total Pages: 6 Client Consent and Referral Consent Referral.
Title of your site Title of your page Text and images arranged on the page in the design of your choice. Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page.
Overview of Everything You Need to Know About Mitigation.
COPA Rollover How to successfully complete the COPA School Year End Rollover from to
Presentation 4 Creating Databases Part III (Creating Reports)
NS5 Session #3 Unplanned Maintenance
European Computer Driving Licence
Kevin “Doc” Hoover Water’s Edge Hydrology, Inc.
You must log in using both you address and your Full name before proceeding
Environmental Commitments
Environmental Commitments
Chapter 18 Finalizing a Database.
European Computer Driving Licence
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Presentation transcript:

Environmental Mitigation and ePM Project Commitment Database

Why we developed a project commitment database:  Ensure we are fulfilling what we promised  Help us keep track of what we have done/not done  Central location for all of UDOT to access  Get Credit for all the GOOD things we do

Commitment Definitions  Any action that is intended to avoid, minimize, and mitigate environmental impacts  Any action that is required to be implemented as a condition of project approval, or has been committed to by the project sponsor

Examples  Project Design – Use retaining wall rather than a fill slope in order to minimize impact on adjacent wetland  Project Design – Use native plant species when revegetating disturbed areas  Construction – Use equipment that has been retrofitted with technologies to minimize emission of MSATs

Examples (continued)  Mitigation – Construct replacement wetlands  Stewardship – Retrofit existing roadways with storm water management facilities  Maintenance – Manage a storm water facility to a certain level of sedimentation

Sources of Environmental Commitments  National Environmental Policy Act (NEPA) EIS/ROD EIS/ROD EA/FONSI EA/FONSI CE CE State Environmental Study (SES) State Environmental Study (SES)  Section 106 Memorandum of Agreement (MOA)  Biological Opinion/Incidental Take issued by USFWS under Section 7

Sources of Environmental Commitments  Section 404 permit issued by U.S. Army Corps of Engineers/delegated states under the Clean Water Act  State environmental agency permit  State, regional, and local permit  Other study documents, MOUs, permits, or approvals  Commitments to stakeholders

Making Commitments  Make sure they are clearly worded  Make sure they are not contradictory to other commitments  Consider practical impact of the commitments on design, construction, maintenance  Provide flexibility to adapt commitments in the future

Responsibility It is everyone’s responsibility. Environmental Manager Project Manager DesignersConstruction Project Team Member Maintenance

System for Tracking Commitments Spreadsheet  ePM Screen 775: Project Commitments

Screen Location – Environmental Menu

Add a NEW Environmental Commitment - Click the Add button

Complete Environmental Commitment Information Phase, Commitment, Responsible to Implement, Due Date

Complete Environmental Commitment Information  PHASE PE – Commitment that a Designer needs to incorporate into Plans/Specials; Pay item; Limits of Operation PE – Commitment that a Designer needs to incorporate into Plans/Specials; Pay item; Limits of Operation CONST - UPDES Permit Conditions; Standard Spec CONST - UPDES Permit Conditions; Standard Spec ROW - Commitment ROW staff makes with public (i.e.: Wait until school year is over to move family with kids) ROW - Commitment ROW staff makes with public (i.e.: Wait until school year is over to move family with kids) MAINT – Cultural area to avoid putting fill on MAINT – Cultural area to avoid putting fill on  COMMITMENT Be Concise Make sense and constructible Put intent rather than the solution, in cases where not much design was done  RESPONSIBLE Who will do it? You can pick a generic job title and then update with a specific name.  DUE DATE Estimated time to complete the commitment

Complete Environmental Commitment Information

Now you have two commitments: 1. UDOT Standard Spec Section 01355, Part MOA Stipulations to complete ILS documentation

Edit Existing Commitment Double Click to choose commitment you want to edit. Change “UDOT Standard Spec 01355, Part 1.13” to: “Follow UDOT Standard Spec Section – Environmental Protection, Part 1.13-Discovery of Historical, Archaeological, or Paleontological Objects, Features, Sites, Human Remains, or Migratory Avian Species.” Double Click “Cultural”

Edit Commitment Make changes and SAVE

Print Last page of Study has the Mitigation Commitments. Commitments are separated by PHASE

Managing Commitments Screen 775 – Project Commitments

Project Commitments Use Screen 775 to Manage the Commitments You can: Add, Modify, Delete, and Complete Double Click Resource to pick record to work with. (Modify, Delete, Complete)

ADD a Commitment Commitments can come from other sources than the Environmental Document, such as Public Involvement or Right of Way. Click ADD for a blank record. Complete information and SAVE.

Modify or Delete Commitment MODIFY: Pick commitment (by double click), Make Changes, and Save DELETE: Pick commitment (by double click), Hit Delete Double click to pick commitment

COMPLETE a Commitment Click on Complete Button, It opens a Complete Window Fill in the Date and Completed by, Return and Save. Click

Commitment Information Source of Commitment was from PI, not the NEPA document This commitment has been COMPLETED. It displays a “Y”.

Report Many options to select what you want to show on your report. Reports can be run for a single project or an entire Region.

Report Sample