SBN Far Detector Building Conventional Facilities Update Steve Dixon WG3 Workshop 11 September 2014.

Slides:



Advertisements
Similar presentations
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Advertisements

Timeline of Key Milestones and Dates DateKey Milestone February 2007Washtenaw County Drain Commissioner’s Office authorizes a project to identify opportunities.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Kansas Renewable Energy and Energy Efficiency Conference Wind 2007 RFP Update John Grimwade - Sr. Director Strategic Planning and Development September.
San Dieguito Wetland Restoration Update on Progress by SCE June 3, 2004.
Suzanne Macey.  DEC looks at known occurrences with 1 mile  FWS looks at known occurrences plus the potential for suitable habitat  Contact DEC and/or.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
December 12, 2013 Glenn's Bay Road Widening and Interchange Project.
Stormwater Quality Enhancement
Carbon Management Steering Board 7 th October 2011 ETHOS (waste to heat) & ComPod – Update CARBON MANAGEMENT BOARD – October 2011.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Interlocal Agreement – Transportation Impact Fees City Council Workshop July 9, 2013.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
University of Toronto Mississauga Campus: UTM Master Plan Update Campus and Facilities Planning | March University of Toronto Mississauga Campus.
Fermilab 1 AP Dept. Activities Report September 20, 2006Dixon Bogert AP Dept. - Activities Report Dixon Bogert - AP Dept. Meeting September 20 th, 2006.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Logistics and Practical Aspects of Construction of a Large LAr Tank in a Remote Location FLARE Workshop November 5, 2004 Elaine McCluskey Fermilab FESS/Engineering.
Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
MOORESTOWN TOWNSHIP MUNICIPAL COMPLEX 3/22/10 Update.
James W. Beever III Southwest Florida Regional Planning Council 1926 Victoria Avenue Fort Myers, FL ( , ext 224)
ULCH Stormwater Fees An Equivalent Stormwater Unit (ESU) is calculated so 1 ESU covers the average impermeable surface in one normal city lot Given all.
E GNV Orange County Solid Waste Management Facility Southern Expansion Site Project.
Gary Feldman MINOS in Cambridge 24 March NO A Update MINOS Collaboration Meeting Cambridge, England 24 March 2009 Gary Feldman.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst Tuesday, July 14 th 2015.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Interlocal Agreement – Transportation Impact Fees City Council Meeting July 16, 2013.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
Needs What is it? Needs What is it?. Minnesota Statute Apportionment of money to counties. Subd. 2. Money needs defined. For the purpose of this.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Work Related to Senate Bill 2202 (effective January 1, 2001)
Long-Baseline Neutrino Facility LBNF Far Site Conventional Facilities (FSCF) Scope and Interface Overview Tracy Lundin as borrowed from Headley & Willhite.
1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) LAGUNA PROJECT Paris Meeting – March 2012 Update.
SBN Near Detector Building Conventional Facilities Update Steve Dixon LAr1-ND Collaboration Meeting 16 September 2014.
105 Updates and Top Challenges For SEPA RC&D Engineer’s Workshop Montgomery County Community College May 24, 2016.
Carolina North Carolina North Annual Report for Chapel Hill Town Hall September 29, 2010.
The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects the current highway location in order to continue.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
WBS Experiment Infrastructure: Design Status Discussion Dixon Bogert Prepared for the MicroBooNE Collaboration Meeting 6/17/11.
OTE Building PMG Report June 25, 2012 Rhonda Merchut 1.
District of Columbia Public Schools | 1200 First Street, NE | Washington, DC | T | F | Murch.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Siting/Conventional Facilities Jonathan Hunt PIP-II Machine Advisory Committee 9 March 2015.
Conventional Facilities/Siting Jonathan Hunt Project X Machine Advisory Committee March 18-19, 2013.
MENTAL HEALTH CLINIC Siting Process and Analysis.
EDD 581 Week 5 Individual Action Research Proposal, Section Two To purchase this material click 581-Week-5-Individual-Action-Research-Proposal-
EDD 581 Week 6 Individual Action Research Proposal, Section Three To purchase this material click
EDD 581 Week 7 Individual Action Research Proposal, Section Four Finalize and submit Section Four of the Action Research Proposal. To purchase this material.
Municipal Solid Waste Program Update TCEQ Environmental Trade Fair
The SABRE Crystals Frank Calaprice.
Issaquah-Fall City Road
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
David Salazar, Chief Facilities Executive
North Georgia Water Resources Partnership Spring Annual Meeting/ Educational Seminar RUSSELL CREEK RESERVOIR April 25, 2018.
SB 807 Implementation Status Update October 2018
Pacific Flyway Center Open Space Preserve and Interpretative Educational Facility Applicant: The Pacific Flyway Fund LLC.
Periodic Review Reports for 15A NCAC 02N, 02O, and 02P
Strategic Planning Timeline Overview
Magnet, Support and Infrastructure
Walker Street Reconstruction Project 25% Design Public Hearing
JLEIC Accelerator R&D Meeting
Space Coast TPO State Road (S.R.) 528 Update
Presentation transcript:

SBN Far Detector Building Conventional Facilities Update Steve Dixon WG3 Workshop 11 September 2014

Agenda Truck Access Wetlands Far Detector Building Options What’s Next 11SEP14S. Dixon | Conventional Facilities Update2

Truck Access Options 11SEP14S. Dixon | Conventional Facilities Update3 Option 1 Wetland Delineation – June 2014 Option 2

Wetlands Process Delineation - complete Report - complete Discussion with USACOE – in progress –Visited the Site - complete –Submit Permit - complete –Additional Information Requested – in progress Mitigation Options –Create Wetland –Purchase Credit – Preferred Option 11SEP14S. Dixon | Conventional Facilities Update4

Wetlands 11SEP14S. Dixon | Conventional Facilities Update5 MINOS Construction Wetland Delineation – June 2014 July Wetland Goals Less Impact is better <0.1 acre = Letter of No Objection <0.25 acre = Regional Permit >0.25 acre = Standard Permit July 2014: 0.24 acres September 2014: 0.17 acres

Wetlands – Reduced Building and Access Road 11SEP14S. Dixon | Conventional Facilities Update6 Wetland Delineation – June 2014

Far Detector Building Options Option 1- Surface Building Option 2 – Shielded Enclosure Option 3 – Removable Roof + Shielding 11SEP14S. Dixon | Conventional Facilities Update ’(6m) 18.04’ (5.5m) 77.08’(23.5m) Weight: 110,230 pounds (50 metric tons)

Design/Cost Estimate Process – Shielded Enclosure Refined July 2014 Design External Estimate - $13.5m (total project cost) Reduced Size of Surface Building External Estimate - $12.4m (total project cost) Separated “lid” from Enclosure/Building External Estimate –$8.9m (Enclosure/Building) – Fits within GPP envelope –$3.5m (Lid and Shielding) – Assumes funded separately –$12.4m total of all both projects 11SEP14S. Dixon | Conventional Facilities Update8

Shielded Enclosure Option 11SEP14S. Dixon | Conventional Facilities Update9 Plan at Detector Level

Shielded Enclosure Option 11SEP14S. Dixon | Conventional Facilities Update10 Plan at Grade Level

Shielded Enclosure Option 11SEP14S. Dixon | Conventional Facilities Update11 Section

Shielded Enclosure Option 11SEP14S. Dixon | Conventional Facilities Update12 Wetland Delineation – June 2014 Section

Design/Cost Estimate Process – Removable Roof+Shielding Refined July 2014 Design External Estimate - $16.1m (total project cost) Reduced Size of Surface Building External Estimate - $15.6m (total project cost) Reduced Size of Surface Building Again External Estimate - $14.3m (total project cost) Separated Projects –$9.8m (Building with Removable Roof ) – Fits with GPP Limit –$1.5m (Site Prep and Utilities) – Assumes funded separately –$3.6m (Shielding and Crane) – Assumes funded separately –$14.9m total of all three projects 11SEP14S. Dixon | Conventional Facilities Update13

Removable Roof + Shielding 11SEP14S. Dixon | Conventional Facilities Update14 Wetland Delineation – June 2014 Plan at Detector Level

Removable Roof + Shielding 11SEP14S. Dixon | Conventional Facilities Update15 Plan at Grade Level

Removable Roof + Shielding 11SEP14S. Dixon | Conventional Facilities Update16 Section

Removable Roof + Shielding 11SEP14S. Dixon | Conventional Facilities Update17 Wetland Delineation – June 2014 Section

Removable Roof + Shielding 11SEP14S. Dixon | Conventional Facilities Update18

Removable Roof + Shielding Potential Changes Consolidate Tanks Relocate Service Bay Rigging for Detector Install 11SEP14S. Dixon | Conventional Facilities Update19

What’s Next Wetland Mitigation Updated information to US Corps Of Engineers Regional Permit Process Project Plan Goal was to have completed by 10OCT14 Text 85% complete, Drawings 95% complete Funding needs to be determined before issued for 2 week review 3 weeks after funding determination to complete 11SEP14S. Dixon | Conventional Facilities Update20

What’s Next Final Design Have Soil Boring Proposal (~$20k) Need requirements – November 2014 Start Final Design Request for Proposal – October SEP14S. Dixon | Conventional Facilities Update21

Questions 11SEP14S. Dixon | Conventional Facilities Update22