Prevention of BSI and VAP Measuring Change in Outcomes Part II Ted Speroff, PhD.

Slides:



Advertisements
Similar presentations
Excel Vocabulary.
Advertisements

Statistical Process Control
Measurement for Improvement. Why we look at data graphed over time Change Made Change to process made in June.
Overview Lesson 1. Objectives Step-by-Step: Start Excel 1.Click the Start menu, and then click All Programs. 2.On the list of programs, click Microsoft.
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 9 Process Capability and Statistical Quality Control.
1 DSCI 3123 Statistical Process Control Take periodic samples from a process Plot the sample points on a control chart Determine if the process is within.
Statistical Process Control Used to determine whether the output of a process conforms to product or service specifications. We use control charts to detect.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
An Introduction to Statistical Process Control Charts (SPC) Steve Harrison Monday 15 th July – 1pm Room 6 R Floor RHH.
6-1 Is Process Stable ? The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process.
Chapter 6 - Part 1 Introduction to SPC.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
Goal Sharing Team Training Statistical Resource Leaders (1)
T T20-06 Control Chart (with Runs Tests) Purpose Allows the analyst create and analyze a "Control Chart". A visual analysis of the control time.
Control Charts.
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
1 Doing Statistics for Business Doing Statistics for Business Data, Inference, and Decision Making Marilyn K. Pelosi Theresa M. Sandifer Chapter 16 Improving.
X-bar and R Control Charts
The Bell Shaped Curve By the definition of the bell shaped curve, we expect to find certain percentages of the population between the standard deviations.
10-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
Step-by-Step Demonstration: Run Chart Tools (Excel Templates) 1.
NU Data Excel Orientation Graphing of Screening Data and Basic Graphing Functions.
Statistical Process Control
Chapter 13 Quality Control and Improvement COMPLETE BUSINESS STATISTICSby AMIR D. ACZEL & JAYAVEL SOUNDERPANDIAN 7th edition. Prepared by Lloyd Jaisingh,
Sharing and explaining the standardized infection ratio (SIR): Does your audience prefer words, colors, and/or δymβφĨs? Dana Burshell, MPH, CPH, CIC HAI.
10-1Quality Control William J. Stevenson Operations Management 8 th edition.
Statistical Process Control Tim Wiemken, PhD MPH CIC Assistant Professor, University of Louisville School of Medicine, Division of Infectious Diseases.
Forecasting and Statistical Process Control MBA Statistics COURSE #5.
Descriptive Statistics
The epidemiology of HAI Scotland Dr Jacqui Reilly Consultant Epidemiologist Head of HAI and IC Group.
Presenting Data & Standardized Infection Ratios Tim Wiemken PhD MPH CIC Assistant Professor of Medicine Assistant Director of Epidemiology and Biostatistics.
Introduction to Control Charts: XmR Chart
Understanding Variation in Your Charts Module 5. What is the state of Statistical Control? A stable mean over time with only random variation about that.
Process Capability and Statistical Process Control.
Prevention of BSI and VAP Measuring Change in Outcomes Part I Ted Speroff, PhD.
Reducing Adult Central Line Related Bloodstream Infections.
Operations Management
Slide Slide 1 Copyright © 2007 Pearson Education, Inc Publishing as Pearson Addison-Wesley. Lecture Slides Elementary Statistics Tenth Edition and the.
Managing Quality CHAPTER SIX McGraw-Hill/Irwin Statistical Process control.
MORE THAN MEETS THE EYE Wayne Gaul, Ph.D., CHP, CHMM Tidewater Environmental Columbia, SC SRHPS Technical Seminar, April 15, 2011.
Copyright © 2010, 2007, 2004 Pearson Education, Inc Lecture Slides Elementary Statistics Eleventh Edition and the Triola Statistics Series by.
Slide 1 Copyright © 2004 Pearson Education, Inc..
2 How to use the seven tools of quality Tools for identifying problems / collecting data Check sheets Scatter diagrams Statistical process control (SPC)
Quality Control  Statistical Process Control (SPC)
Understanding and Presenting Quality Data in Healthcare Center for Clinical Effectiveness Loyola University Health System.
10 March 2016Materi ke-3 Lecture 3 Statistical Process Control Using Control Charts.
Section Copyright © 2014, 2012, 2010 Pearson Education, Inc. Lecture Slides Elementary Statistics Twelfth Edition and the Triola Statistics Series.
MOS 3330 Operations Management Professor Burjaw Fall/Winter
Establishing baselines Detecting a Trend What to do following a Trend How to re-baseline Life Cycle of a Trend.
Process Control Charts
QUALITY CONTROL CHAPTER 8.
PROCESS CAPABILTY AND CONTROL CHARTS
Chapter 2 Descriptive Statistics.
Chapter 2 Descriptive Statistics.
Statistical Process Control (SPC)
Theoretical Basis for Statistical Process Control (SPC)
Variation and Control Charts A Leadership Perspective
10 Quality Control.
10 Quality Control.
Statistical Process Control
Statistics Process Control
The MIS and Dashboard.
Control chart (Ex 3-2) Subgroup No. Measurement Average Range Date
Hanford Performance Indicator Forum
Special Control Charts II
Introduction to Control Charts
The Life Cycle of a Trend Savannah River Nuclear Solutions, LLC
Basic Training for Statistical Process Control
 Statistical process control chart for adverse drug events (ADEs) per 1000 doses of medication dispensed during the entire period of audit from January.
The Quality Improvement Model
Presentation transcript:

Prevention of BSI and VAP Measuring Change in Outcomes Part II Ted Speroff, PhD

Using NNIS Rate Measures is a Problem for QI NNIS Rates are used in surveillance to detect outbreaks – a rise in rates! –Also, easier to make site comparisons –And easier to pool data into single rate However, the goal of QI is to decrease the rate. The area you have to work with is between the mean rate and 0. It is very hard to show improvement using rate as your measure.

Control Chart for NNIS Rate Central Line is Mean =5.0/1000 days UCL LCL = -1.7 When the lower (LCL) control limit is below zero, you have to collect data for a much longer period of time to move the LCL above zero. X-axis is Time Scale: days, weeks months To show improvement the rate will be in this area.

Solution: g Chart Change your Measure The number of days between events –Date #2 minus Date #1 Goal: to increase the number of days between events There is no upper boundary As the NNIS rate decreases, the number of days between events increases. G chart is sensitive for detecting a decrease in NNIS rate Don’t need to know the census (denominator), just the dates of infections. Thus, not dependent on the number of line-days or vent-days of your ICU.

Example Qual Saf Health Care 2005;14: Figure 3. Days between CVC-related bloodstream infections (G Chart) January 2000 – October 2004 The G chart monitors time between events. The goal is to increase time between infections, hence higher points indicate better performance. As the BSI rate decreases, there are fewer data points per year—this is reflected in shorter calendar-year bars along the top. The baseline period is from January 2000 through October 2002 (infections 1 – 39). The intervention period is from November 2002 through October 2004 (infections 40-45). During the baseline period, the number of days between infections was consistently below the upper control limit (UCL), suggesting the variation in time between infections was random and inherent to the process of CVC care. During the post-intervention period, the number of days between infections was frequently above the UCL, suggesting the intervention had introduced non-random improvements into the process of care.

Additional Rules for Control Charts Statistical Significance Single point above the UCL 2 of 3 consecutive points between 2 and 3 sigma 6 consecutive points in an upward trend 9 consecutive points above or below the central line (mean)

Excel File Template: Tabs – C-Line BSI & VAP

Reminder: Change Name of File and Save Often

First Entry: MM/DD/YYYY Date of first BSI in your ICU

Continue with Second Entry Note: Days between Events takes at least two entries

Completion of Second Entry starts the Control Chart

Baseline Data Entry From Row 20 to 42

Set Baseline: Move Cursor to Cell F20 Edit from B45 to B42

Edit of Chart Title and Data Entry Complete

Print

VAP G Chart

VAP NNIS Worksheet

End of Part II Questions and Comments so far? Continue Part III