Wet Demonstrator Objectives. 2 A Brief History Functional Requirements First DraftJuly 2014 Wet Demonstrator Scope First DraftJuly 2014 Singapore Workshop.

Slides:



Advertisements
Similar presentations
John A. Orcutt Deputy Director, SIO Ocean Observations Initiative NSF MREFC Chair, NSF/CORE DEOS Comm.
Advertisements

Testing Medical Devices A Brief Overview © 2005 Max Cortner. Copying and distribution of this document is permitted in any medium, provided this notice.
SUYAMA Masuo, FUJITSU LTD Estimates of Required Funding for Green Cable Development Phase.
Radiopharmaceutical Production
Lecture 8: Testing, Verification and Validation
Robert Beckman Director, Centre for International Law (CIL) National University of Singapore UNCLOS Legal Regimes and Green Cable Systems JTF Workshop.
Network Design and Implementation
1 Highly Accelerated Life Test (HALT) Wayne Bradley 8 April 2014.
© ABB-EWEC 2006 ATHENS /03/06 EWEC 2006 Athens The Challenges of Offshore Power System Construction Peter Jones Lars Stendius ABB.
The EX100 & EX1000 Oil in Water Monitors. The EX100/1000 Oil In Water Monitor Features 1.Continuous Flow and Accurate Measurement. 2.Measurement range.
VLNvT workshop Amsterdam October 5-8th 2003 P. Lamare SACLAY DSM/DAPNIA Experience with electro-optic cable Wet mateable connection.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
14/06/20151 MORE Requirements seen from ESA Pedro Pablos 1 st MORE Team Meeting 27 Febrero 2007.
Networking for Ocean Bottom Observatories Taken from the Cabled Observatory Presentation School of Ocean and Earth Science and Technology February 2006.
Steven S. Thumbeck October 5-8, 2003 NIKHEF, Amsterdam VLV ν T Workshop "Technical Aspects of a Very Large Volume Neutrino Telescope in the Mediterranean.
4. Quality Management System (QMS)
Many Roads To Home. LAN Roads UTP STP Coaxial Fiber Optics.
Amsterdam October 2003 M. Sedita VLVnT Installation and Maintenance of the submarine network The Maintenance aspect present some difficult as their.
4. Quality Management System (QMS)
CSE 550 Computer Network Design Dr. Mohammed H. Sqalli COE, KFUPM Spring 2007 (Term 062)
Stephanie Fultz. Overall Modeling Modeling is a way of thinking about the problems using models organized around the real world ideas. A modeling method.
SCADA and Telemetry Presented By:.
System Software Integration Testing Mars Polar Lander Steven Ford SYSM /05/12.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Introduction to ISO New and modified requirements.
Managing Software Quality
VALIDATION METHODOLOGY
1 wp4 – Technical Issues for payload integration within the Nacelle for High Altitude flight Budapest 24/11/04 Marco Bobbio Pallavicini Carlo Gavazzi Space.
3- System modelling An architectural model presents an abstract view of the sub-systems making up a system May include major information flows between.
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
Equipment Management Audience – Local lab responsibilities.
PIPELINE ENGINEERING Multi-Diameter Pigging – Factors affecting the design and selection of pigging tools for multi-diameter.
1 Chapter 9 Database Design. 2 2 In this chapter, you will learn: That successful database design must reflect the information system of which the database.
Mission Assurance Concepts and Discussion NEPTUNE Power CoDR Richard Kemski June 10, 2002.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
INFO 627Lecture #101 Requirements Engineering and Management INFO 627 Review Glenn Booker.
CONNECT Roadmap Draft version as of February 4 th,
Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
Subcommittee on Design New Strategies for Cost Estimating Research on Cost Estimating and Management NCHRP Project 8-49 Annual Meeting Orlando, Florida.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Green Cables for ocean and climate monitoring and disaster warning Erica Campilongo, ITU.
1 Recommendations Now that 40 GbE has been adopted as part of the 802.3ba Task Force, there is a need to consider inter-switch links applications at 40.
Green Systems: Wet Demonstrator Stephen Lentz Director of Network Development.
Green Systems: Science & Engineering Stephen Lentz Director of Network Development.
The KM3NeT consortium ( - supported through the European Union's 6th framework programme in a 3-year Design Study - aims at the construction.
Page 1 NEPTUNE Alternate System Design Peter Phibbs 7-8 January 2003.
A Deep-Ocean Exploration ROV For the Okeanos Explorer
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
SENSOR SELECTION CALIBRATION OVERVIEWOVERVIEW DESIGN ROADMAP ACKNOWLEDGEMENTSACKNOWLEDGEMENTS The project would not have been possible without the extensive.
PPM DU Sea Qualification Tests 1.General constraints & requirements 2.Preliminary tests 3.Full mechanical test.
Legal framework of telework – practical solutions for employers Dr. Jacek Męcina.
QUTE’98 Workshop Heidelberg, October 1998 A framework for the determination of user’s QoS requirements by Antony P Oodan of Telecommunications Quality.
Rosanna Cocimano for the NEMO collaboration VLV T08, Toulon, France April 2008 Rosanna Cocimano for the NEMO Collaboration A comparison of AC and.
배관의 내부검사용 이동로봇 및 조향장치 등록번호 : , 특허권자 : 최 혁 렬 외 2 명.
The electro-optical cabling system for the NEMO Phase-2 tower Antonio D’Amico INFN - LNS.
Camera PDR/CD1 Planning 19 September 2008
Possible options of using DDS in oneM2M
OVERVIEW Impact of Modelling and simulation in Mechatronics system
CINEMA System Engineering
ITU-UNESCO:IOC-WMO Joint Task Force on SMART Submarine Cable Systems
The Web Application Development Process Models
Expandable Seafloor Observatory
Open Discussion Laurie Doyle Technical Marketing Director – APAC
Junction Boxes for KM3NeT
Flooding Walkdown Guidance
Module – Groundwater Level Measurement
Presentation transcript:

Wet Demonstrator Objectives

2 A Brief History Functional Requirements First DraftJuly 2014 Wet Demonstrator Scope First DraftJuly 2014 Singapore Workshop DiscussionsOct 2014 General Requirements Draft to ITUFeb 2016

3 Submission to ITU SG15 Establishes criteria for  Sensor performance  General capabilities: reliability, design life, environment, repair  Operational requirements: error rate, latency, calibration, management Does NOT impose requirements on:  Power delivery  Communications  How to build it “Compliance with this Recommendation is voluntary.”

4 Features of a sensor-enabled submarine cable system A sensor-enabled submarine cable system incorporates temperature, pressure and three-axis acceleration sensors at regular intervals along the cable. Sensor sets are nominally located once per repeater span, however other arrangements may be considered. Sensor sets shall be no more than 150 km apart. The system shall provide continuous power for the sensors and a means of transmitting data to one or more shore stations. The presence of sensors shall not preclude the use of branches, fixed OADM or ROADM. To the extent feasible, branch cable segments should also be equipped with sensors.

5 Capabilities of a sensor-enabled cable system The presence of sensors and the sensor subsystem shall have no net impact on the performance of telecommunications functions. Any allocation to the system performance budget resulting from the sensors or sensor subsystem shall be identified. The addition of sensors and the sensor subsystem shall have negligible impact on the availability of telecommunications functions. Any unavailability resulting from the presence of the sensors and sensor subsystem shall be identified. The design life of the sensor subsystem shall be ten years or greater. Sensor failures or sensor subsystem failures that have no affect on telecommunications functions will not be repaired. The sensors and sensor subsystem shall be compatible with conventional installation methods including, but not limited to, cable transport, cable and repeater storage on vessels, linear cable engines, three meter sheaves, plough burial, ROV burial and jetting.

6 Wet Demonstrator Objectives - Science Demonstrate the ability of sensors to be installed as part of a submarine telecommunications system Demonstrate the accuracy and usefulness of the sensor data when the sensors are deployed in a realistic manner Prove the assumptions related to sensor orientation and direction when laid as part of a cable system

7 Wet Demonstrator Objectives - JTF Provide baseline requirements that will facilitate continued discussion Maintain and strengthen interaction between interested parties Establish credibility needed to solicit more substantial resources from governments, NGOs, and industry

8 Wet Demonstrator Objectives - Suppliers Encourage system suppliers to allocate modest resources to early development stages Allow system suppliers to consider suitability of existing product lines

9 Wet Demonstrator Engineering Goals Sensors can be integrated into the cable system; Sensors can survive deployment stresses; Data can be collected and transmitted to shore; Data will provide value to science, and The system can continue to operate for months or years.

10 Configuration Requirements Each sensor set shall consist of one temperature sensor, one pressure sensor, and one three-axis accelerometer meeting the performance parameters provided in the Functional Requirements. Sensors shall be housed in or placed adjacent to a cable body that matches the physical and mechanical characteristics of a repeater housing. The submarine cable shall be a conventional [12mm], 17mm, 20mm or 21mm type suitable for the expected deployment conditions such as Lightweight (LW) or Lightweight Protected (LWP), or a cable armor type that is typically used for repeater tails. Power and communications shall be provided to the sensors. Note, however, that the power feeding and communications methods are not required to be similar to a conventional cable system and may be specific to the wet test. Note: It is expected that each supplier will demonstrate full integration of the sensors into their repeaters through appropriate qualification and sea trials at a later stage of development.

11 Basic Configuration

12 Connection to Observatory The wet test will be laid in an area of seabed supported by a cabled observatory The observatory shall agree to make the data from the wet test available to interested parties for review and verification The wet test shall include a suitable wet-mate connector for connection to a cable observatory. The wet test shall include any necessary adaptation to convert power received from the cabled observatory to power needed for the sensors. The wet test shall include any necessary adaptation to connect the sensors and the wet test system to the communications interface provided by the cabled observatory.

13 Installation The wet test shall be laid using conventional cable lay equipment At least one sensor location shall be visually inspected by ROV after installation. The wet test cable will be laid at typical speed for repeater installation. No attempt will be made to reduce loads on the instrument housing.

14 Criteria for Success All sensors operational following installation 99.99% availability of sensor data over test period No more than one sensor of each type failing over a six month period Successful validation of sensor data based on agreed qualitative and quantitative criteria

15 Summary Representative Mechanical Design  Real repeater housing  Sensor attachment to housing or cable No Specific Electrical Power Requirements  Does not require repeater power supply  Any convenient method can be used No Specific Communications Requirements  Does not require integration to optical line  Any convenient method can be used

16 Criteria for Success All sensors operational following installation 99.99% availability of sensor data over test period No more than one sensor of each type failing over a six month period Successful validation of sensor data based on agreed qualitative and quantitative criteria

17 Do requirements need to be modified? First two requirements for the wet demonstrator are intended to simulate a repeatered telecom system A repeater or repeater-like housing is required, as is the ability to terminate the cable onto this housing Relaxing or removing the first two requirements would allow alternative mechanical designs

18 Revised Requirements Sensors can be deployed on an instrument platform of any convenient design Deployment assumes good weather, careful handling Data can be collected and transmitted to shore Data will provide value to science, and The system can continue to operate for months or years.

19 Revised Development Effort Off-the-Shelf  Sensors  Serial converters  Optical ethernet links  Housings Re-use Existing Bespoke Designs  DC-DC converters  Cable termination Potential Suppliers  Telecom system suppliers  Systems integrators  Ocean observatory engineering teams

20 Revised Engineering Goals Sensors can be integrated into the cable system; Sensors can survive deployment stresses; Data can be collected and transmitted to shore; Data will provide value to science, and The system can continue to operate for months or years.

21 Conclusions Wet demonstrator requires development of mechanical interface to a repeater Wet demonstrator does not require electrical or optical integration Efforts to engage industry are ongoing Alternative approaches would diminish the value of the Wet Demonstrator