Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.

Slides:



Advertisements
Similar presentations
Load Management System with Intermittent Power on the Grid Ruth Kemsley CEng MIMechE MIEE Econnect Ventures Ltd.
Advertisements

The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
ABA CLEAN ENERGY CARBON PROJECT Bruce Johnston
Antitrust/Competition Commercial Damages Environmental Litigation and Regulation Forensic Economics Intellectual Property International Arbitration International.
Wind Energy – H.R Scenario KIIT University 27 th Nov 2013 KIIT University 27 th Nov
EVOLVE INDIA SOLAR SOLAR FINANCE SOLAR B. O. O
World Forum on Energy Regulation IV Athens, Greece October , 2009 Energy Market Design and Promotion of Efficient Emissions Reductions John Tamblyn.
Cleveland Power Pty Ltd
IDEAS Business models to underpin Energy Positive Neighbourhoods Dr Tracey Crosbie Teesside University INTERNATIONAL CONFERENCE SUSTAINABLE PLACES October.
Albanian power market Sokol RAMADANI Chairman ERE- Albania 1 FEBRUARY 2012 Electricity market design and regulatory issues in Albania and South East Europe.
The Wider Offshore Industry - Introduction. Why Renewables? Mb/doe Gas Nuclear Oil Renewables Coal Incremental.
Making the Right Wind Power Investment University of Toronto Wind Workshop October 12th, 2005 Mike Crawley, President/CEO AIM PowerGen Corporation.
SOLAR IMPACT ON FYI Kevin Meikle, Architect Airports Planning Manager 4995 E. Clinton Way Fresno, Ca (559)
Presentation on Green Electricity Juliet Davenport Chief Executive of unit[e] a renewable electricity supplier.
Insight Conference How to Profit from the Business of Renewable Energy October 20, 2003, Hilton Toronto SMS Energy-Engineering Inc. Safouh Soufi.
Longyuan Mulilo De Aar 2 WEF MW Onshore Wind Energy Facility
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
The International Trade Administration: Clean Energy Priorities and Programs Mary Saunders Assistant Secretary of Commerce for Manufacturing and Services.
THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Bruce Hedman, Institute for Industrial Productivity September 16, 2014.
Greta’s Grand Valley Wind Farm Contributing to Ontario’s Energy Future March, 2012 Greta Energy Inc.
You currently have no control over ever rising electricity prices Electricity costs have doubled over the last 10 years* What will your electricity bill.
RENEWABLE ENERGY POLICY. Renewable energy is energy that comes from resources which are continually replenished such as sunlight, wind, rain, tides, waves.
1 Utility Ownership of Wind Power: Why it makes sense now American Wind Energy Association May 17, 2005 Eric Markell Senior Vice President Energy Resources.
COPYRIGHT © 2010 BALLARD POWER SYSTEMS INC. ALL RIGHTS RESERVED B A L L A R D P O W E R S Y S T E M S PUTTING FUEL CELLS TO WORK NOVEMBER 2010 Utilizing.
North Eastham Wind Feasibility Study Results Brian Eastman Eastham Energy Committee Kristen Burke Massachusetts Technology Collaborative Ric O’Connell.
Quantum Leap in Wind Role of Institutions and Regional Cooperation Chunhua Li DGM Goldwind International June 2011, Manila.
National Inter-Ministerial Dialogue on Climate Change Bay Gardens Hotel Castries, saint Lucia Date, 2009 Energy Sector By Bishnu Tulsie and Judith Ephraim.
GB Electricity Market Reform: The implementation challenges ahead IAEE International Conference Stockholm, June 20 – Dorcas Batstone
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
© OECD/IEA 2010 Energy Policies of the Czech Republic 2010 In-depth Review Energy Policies of the Czech Republic 2010 In-depth Review Prague, 7 October.
Financing climate-friendly projects in the Balkan region DAC PROJECT CAPACITY BUILDING IN BALKAN COUNTRIES IN ORDER TO DEAL WITH CLIMATE CHANGE Prepared.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
The Role of Renewable Energy in Addressing Climate Change Australian Government Support for Renewable Energy Denis Smedley Director Renewable Energy Technologies.
Session 3: Project Development Agenda The Voice of a Technologist Utility Project Development Reliability Concepts Residential Project Development Homework.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Track 5 Project FinanceSession 6 Renewables Through Private Financing.
BRITO Portugal Session 4 – Block 1 Barcelona May EDP Distribuição Energia, S.A. Internalisation of Environmental Benefits Concerning Dispersed.
Wind farm Kalin / Bulgaria. Wind farm Kalin / Bulgaria – 99 MW ♦ 55 x Vestas V100 with 1,8 MW rated power ♦ 95 m hub height ♦ average wind speed 5,9 m/s.
DG Toronto Hydro’s Perspective Task Force on Distributed Generation Richard Lü VP, Environment, Health & Safety March 5, 2003.
An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.
Wind, Wind Power and Vestas Implementation of Wind Power.
The global energy landscape and its impact on Bangladesh Dr. Boris Gehring TÜV SÜD Slide 1 13/10/15‘Safe Future Now’ Summit on Power and Energy in Bangladesh.
Page 1 Implemented by Up-Scaling of Wind Power in Vietnam AHK Business Trip “Wind Power in Vietnam” Ho Chi Minh City, 23 November 2015 Peter Cattelaens.
1 Financing sustainable development Role of Banks Key financing prerequisites Major project parties “Hybrid” Models Demand side management Conclusions.
Demand Response
Philippine Feed-In Tariff System Implementation 1.
Presented to ABA RADER Committee/Columbia Law School's Environmental Law Society Symposium INTRODUCTION TO RENEWABLE ENERGY DEVELOPMENT Becky.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
© «Samruk-Green Energy» LLP BRIEF COMPANY OVERVIEW March «Samruk-Green Energy» LLP Bagdat Oral Project Manager.
North Coast Wind Farm Tolano Environmental Consulting.
08/11/2013 Tidal Energy: a Vision from West Normandy Region and ALSTOM Thematic Workshop 2: Energy J. CREST, Business Development Manager, ALSTOM Ocean.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
Sustainable Energy for the World: Developing Sustainable Energy Projects Rachel Robboy, Principal Investment Officer Structured and Corporate Finance Department.
Tackling climate change in a practical way 18 May 2016.
Renewable Distributed Generation and Public Water Supply Utilities CWWA/CTAWWA Fall Conference Paul R. Michaud, Esq. October 20, 2015.
Planning and Realisation of Wind Farms
Tackling climate change in a practical way
The state of play of renewables in Australia
South East Europe Regional Consultation Meeting Bucharest, Romania 6 – 7 October 2016 Session II: Opportunities and Challenges in RE Deployment in the.
Overview on Renewable energy in Bulgaria
The state of play of renewables in Australia
Closed Loop Wind Farm Control
The ISLES Project Bob Hanna
Making Green Tariffs Work for Your Customers
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
U.S./European Cost Comparison Study Preliminary Results
Opportunities for Local Energy
Albanian power market ERE- Albania Sokol RAMADANI Chairman E R E
Presentation transcript:

Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China and East Asia - June 2005 Ricky Fong James Pennay

Agenda  Introduction to Wind Prospect  Wind Direct Concept and Benefits  The Project Development Cycle  Case Study – A Successful Implementation  Critical Issues and Success Factors  Next Steps

Wind Prospect Group  Wind Farm Design & Development  Construction Project Management  Operations Management  Due Diligence and Validation  Involvement in 1,222 MW approved; over 50 staff  Offices in: UK Hong Kong Australia Ireland

Wind Prospect Activities

The Wind Direct Concept Erect wind turbines directly on industrial sites Embedded generation into the existing electrical infrastructure Reduce demand for fossil-fuel based power generation and reliance on diesel back-up Opportunity to lower electricity costs Turbines reliably produce power for year life

The Wind Direct Concept Long-term contract for Green Certificates Long-term PPA for ‘Green Electricity’ Wind Direct Turbines Electricity Supplier Actual ‘Green Energy’ flow Long-term land lease agreement Balancing ‘Brown Electricity’ supply Low-cost ‘Green Electricity’ supply

Key Benefits Financial Benefits Potential savings on electricity costs Releasing revenue to support core business streams Environmental Benefits Reducing greenhouse emissions is deemed increasingly important internationally Key measure in corporate Environmental Reports Establish a real renewable “Green Image”

Project Development Cycle Core Activities Site identification and selection Wind farm design and development Construction project management Operations and maintenance management

Development Process Suitable Site Identification Considerations Potential operating sites Available wind resource Site demand profile Power price review Available land Access to the site Proximity to physical constraints Internal company support for the project

Project Timeline Turbines are designed to operate for years

New Site Development Environmental assessment Wind resources and energy yield Technical design and cost estimation Financial evaluation Attain necessary government approvals Commercial arrangements Development Process

Electrical Planning Plant integration Grid integration Control systems design Construction Pre-construction Turbine selection and procurement Construction project management Commissioning Development Process

Potential Cost Benefits

Case Study – Successfully Implementing “Voridian – North West England”

Case Study Two 2 MW turbines on the Voridian industrial complex Close to the existing Siddick Wind Farm The turbines will directly supply Voridian with electricity

Case Study 1km

Case Study 2 x 2MW Vestas V80 turbines at Voridian England

Case Study  Owned by Wind Direct Ltd - three way joint venture between; Wind Prospect Ltd – wind energy experts Econnect Ltd and – electrical connection experts Optimum Energy Ltd – supply experts  To be constructed and operated by Wind Prospect Ltd by the end of 2005  Benefits to Voridian decreased electricity costs due to lower tariff and avoidance of Climate Change Levy green image

Critical issues and success factors  Wind regime  Energy consumption data  Long term security for viability and financing Land Power purchase Support mechanisms Exporting power Energy Bureaus Pricing – fixed or spot market and term Priority dispatch Connection costs  Regulatory framework: LONG - LOUD - LEGAL

Thank you! W I N D P R O S P E C T 2802 Admiralty Centre, Tower 1 18 Harcourt Road Hong Kong t: (+852) f: (+852) e: PO Box 722 5th Floor, 495 Boundary Street Spring Hill, Brisbane QLD 4004 Australia t: +61 (0) f: +61 (0) e: