Energy Program Implementation Reducing Operational Expense by Benchmarking and Continuous Improvement Practices
Presentation Objectives Initial steps taken for energy management implementation Benchmarking development Cost benefit analysis for energy conservation projects as a case study Benefits and results
Aurora Health Care Private not for profit integrated health care provider serving eastern Wisconsin 15 Hospitals Over 200 clinics and other real estate 70 Pharmacies 14,800,000 sq. ft. of managed space $58M utility spend
Our purpose: We help people live well. Our values: Every patient deserves the best care Responsibly managing resources Building a healthy workplace through accountability, teamwork and respect
Where We Started in 2008 A collection of hospitals with separate utility budgets. Facility managers reporting to local hospital administrators Volatile energy costs System energy intensity benchmarks at 229 kBtu/sq ft
Energy Management Guidelines Connections: EnergyStar ASHRAE Standard ASHRAE 2011 Handbook, Chapter 36 Practical Experience Opportunities in your buildings
Where are you at?
Establish Baselines Use historic data Usage vs. average temperature Model a best fit line for prediction Input of daily temp = output of expected energy use Use statistical tools to react
Establishing historical daily meter reading
Daily electric read
Daily Temperature Reading NOAA Weather underground
Daily Temperature Reading NOAA Weather underground
Best Fit equation - Electrical
Best Fit equation – Natural Gas typical
Daily Report – on site
Monthly report and review - system
Best Practices and Knowledge Sharing Monthly Facility Energy Team Meeting. Share Best Practices – Facility Manager presents topic Track implementation at each site Develop knowledge sharing document(who, what, how much, how to) Energy tours by Facility Managers
Energy project review prioritization Idea generation Measure monitor Estimate savings Estimate costs Establish available grants Evaluate implementation feasibility Pareto
Measurement
.
Pareto Internal ideas through meeting Outside contractors Utility and State Efficiency programs #Project Entry Date StatusPersonTask Cost Savings/ Year Focus Incentive (est) Payoff in Yrs. 27 EnergyMisers (VendingMisers)Nov-12StudyBrad EnergyMiser cost (about $75) /Energy Savings/FOE Rebate($15) $ 1, $ $ Wall Wash FixturesOct-12PlanMike Without Aurora Coloring. 90 fixtures from 175 w Metal halide to Phillips Power core Fixtures $ 13, $ 5, Boiler Stack Economizer / Steam Heat RecoveryAug-12PlanColin Revised estimate/Moving forward to Luann & Tom /FOE Rebate = $23000, ( ) $ 220, $ 46, $ 30, Chiller Condensate Reuse projectAug-12PlanJon Second bid being sought for new estimate to pipe condensate inside./Simple Payoff / FOE ? $ 131, $ 32,
Aurora Medical Center Oshkosh (AMCO) Energy Reduction Projects Energy Reduction from the AMCO Facilities Department that were implemented to reduce energy costs
#1 Continuous steam trap audits and repairs to failed traps
#2 Chilled water pump speed reset and changed controls
#3 Reduced steam pressure on boilers
#4 Chilled water reset on chillers
#5 Started to monitor electricity- actual usage and daily usage
#6 Do rounds to shut lights off & are vigilant about wasted energy usage
#7 Relocated building pressure sensors & changed building pressure program control on building automation system
#8 Night setback on VAV boxes throughout building by area
#9 Programmed an outside air reset for our steam heat exchangers for VAV reheat
#10 Found chilled water coils piped backwards on air handling units
Aurora Health Care Utility Summary Savings: 14.8% reduction in energy usage
Awards and Recognition 2010: Energy Star – Aurora St. Luke’s Medical Center 2011: ASHE2C – Aurora MC Oshkosh 2012: Energy Star – Aurora MC Oshkosh Energy Star – Aurora St. Luke’s Medical Center ASHE2C – Aurora Sheboygan Memorial MC ASHE2C – Aurora St. Luke’s Medical Center Energy Star Battle of the Buildings – Aurora Medical Center of Washington County – Top in Category
Summation Executive support and initial steps Benchmarking and setting goals Identifying, prioritizing and holding accountable for implementation Realized operational improvements
Open Panel Discussion Mike Connor Vice President, Facilities Operations and Property Management Nolan Harp Sr. Director, Facilities Operations and Property Management Jedd Winkler Energy Program Manager, Facilities Operations