The Nigerian Institute of Quantity Surveyors PRICING TENDER DOCUMENT BASED ON BESMM4 By Dr. GANIYU AMUDA YUSUF (FNIQS, RQS) Department of Quantity Surveying.

Slides:



Advertisements
Similar presentations
Reducing construction waste through design Dave Marsh Construction Project Manager.
Advertisements

Monitoring and tender procedures for infrastructure projects Baltic Retreat 2013 Federal Department of Foreign Affairs FDFA Swiss Agency for Development.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Contract and Grant Provisions and Administration Section 105 (Page 30) Title I The Act.
LiberRATE Estimating It thinks like you do! Edition 3 Instructions Click on buttons to advance or to repeat the previous slide PreviousNext.
I2I2 Integrating Intermodal The Port of Huntington Tri-State Global Trade Center.
Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
Enhancing Data Quality of Distributive Trade Statistics Workshop for African countries on the Implementation of International Recommendations for Distributive.
Construction Industry Development Board development through partnership “Towards Uniform Conditions of Contract and Specifications in South Africa” South.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
IAS 2 - INVENTORIES. 2 Objective and Scope OBJECTIVE: The objective of this Standard is to prescribe the accounting treatment for inventories. SCOPE:
Construction Contracts
Construction Engineering 221 Cost Estimating and Bidding.
EM15 – Contractors COST MANAGEMENT
Valuations and interim certificates. Purpose Value the works taking account of: – the physical work done on site; – any extra work ordered by the client;
Insurance provisions under JCT 1998 and JCT Standard Building Contract 2005 Brian Lewis – QBE CAR.
1 RICS The Royal Institution of Chartered Surveyors London Quantity Surveying & Construction Faculty The Built Environment Group Corporate Professional.
Session 3.11 Risk Identification Presented By: RTI, JAIPUR.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
FAR Part 2 Definitions of Words and Terms. FAR Scope of part (a)This part – (1) Defines words and terms that are frequently used in the FAR; (2)
◦ (a) The prior period's closing balances have been correctly brought forward to the current period or, when appropriate, have been restated; and ◦ (b)
1 PRESENTATION ON TENDERING REQUIREMENTS Presented by Kenya National Highways Authority (KeNHA) Team.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Compensation events and claims Presented by Prof. Khem Dallakoti.
Rangajewa Herath B.Sc. Accountancy and Financial Management(Sp.)(USJ) MBA-PIM(USJ)
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
FAR Part 31 Contract Cost Principles and Procedures.
Valuation of Inventories
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
PROVINCIAL SUPPLY CHAIN MANAGEMENT (SCM) POLICY REFORMS SUMMIT: Date: 03 Feb 2011 Bolivia Lodge Key Features of the Draft Provincial SCM Policy 1.
P.Ariyasena Chief Accountant Ministry of Foreign Employment Promotion and Welfare.
ACCOUNTING STANDARD -2 VALUATION OF INVENTORIES. PURPOSE PURPOSE Specifies the principals for valuing the inventory. Disclosure of the specific policies.
3rd BERCEN Exchange Programme, Prague WASTE CONDITIONS IN ENVIRONMENTAL PERMITS Mrs. Marianne Lindström, Finnish Environmental Institute,
Accounting (Basics) - Lecture 6 Inventories. Contents Measurement of inventories Impairment of inventories Recognition as an expense Disclosures Oct 21,
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Head Office Hannay House 39 Clarendon Road Watford Hertfordshire WD17 1JA UK Telephone: +44 (0) Facsimile: +44 (0)
1 Results-based Monitoring, Training Workshop, Windhoek, Results-based Monitoring Purpose and tasks Steps 1 to 5 of establishing a RbM.
IAS 16.  Initially recognised at cost  Cost – amount of cash or cash equivalents paid or fair value of other consideration given to acquire asset 
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
Table One Assignment One – Group Presentation. Understanding the Research Topic The purpose of this assignment is to gain an understanding of cost modelling.
DIPLOMA IN CONSTRUCTION AND THE BUILT ENVIRONMENT.
UNIVERSITY OF PALESTINE FACULTY OF APPLIED ENGINEERING & URBAN PLANNING CIVIL ENGINEERING DEPARTMENT ENGINEERING PROJECT MANAGEMENT CHAPTER 3 INTRODUCTION.
VALUATION OF INVENTORIES
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
Amendments to the Public Works Contracts
Presentation of Financial Statements (LKAS 01)
nrm The RICS New Rules of Measurement Suite
International Accounting Standard 16 Property, Plant and Equipment
Fuel Cost Components in the Fuel Adder
FAR Part 2 - Definitions of Words and Terms
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
nrm The RICS New Rules of Measurement Suite
INTERCONNECTION GUIDELINES
Contractor’s Post-contract Cost Management Processes
Chapter 24 Segment reporting.
Monitoring Satisfactory Academic Progress
09 Calculation
Engineering Project Tendering.
VALUATION OF INVENTORIES
بسم الله الرحمن الرحيم Tests on Completion Dr. Kamaleen Sha’ath
QS, MEASUREMENT, DOCUMENTATION, SMM
Updating the Article 6 guide Outline of envisaged changes
Advancd Measurement and Contract Administration
Presentation transcript:

The Nigerian Institute of Quantity Surveyors PRICING TENDER DOCUMENT BASED ON BESMM4 By Dr. GANIYU AMUDA YUSUF (FNIQS, RQS) Department of Quantity Surveying Faculty of Environmental Sciences, University of Ilorin, Ilorin, Kwara State 2- Day National Workshop on the Relevance of BESMM4 in Total Cost Management of Construction works Date: 6 th – 7 th April, 2016 Venue: Barcelona Hotels, Wuse, Abuja

Again, making reference to the provision contained in clause 1.1 of the general rules of BESMM4 (pg 1), which states that: “Bills of quantities shall fully describe and accurately represent the quantity and quality of the work to be carried out. More detailed information than is required by the rules shall be given where necessary in order to define the precise nature and extent of the work required” PRICING TENDER DOCUMENT BASED ON BESMM4

Composition of a Bills of Quantities Pg.12:  Form of Tender;  Main Summary  Preliminaries:  Information & requirements  Pricing schedule  Measured Work (incorporating contractor designed portions)  Risk;  Provisional Sums (see paragraph 2.6.7, 2.91 & 2.11 pg 14,16,17)  Dayworks (provisional); and  Annexes PRICING TENDER DOCUMENT BASED ON BESMM4

 Bill items properly framed under the BESMM4 have standard inclusions automatically considered to be included which tendering contractors should take account of while estimating their rates.  These “deemed included items” requires estimators to be conversant with the rules of BESMM4 because the underestimation of deemed to be included items could lead to under-pricing, similarly, overestimation of ‘deemed to be included items’ could lead to overpricing of work items (Oforeh and Alufohai, 1998). PRICING TENDER DOCUMENT BASED ON BESMM4

For instance, section under general rules (pg2) states that: “Unless otherwise stated in the bill or herein, the following shall be deemed to be included with all items”:  Labour and all costs in connection therewith  Materials, goods and all costs in connection therewith such as conveyance, delivery, unloading, storing, returning packing, handling, hoisting, lowering, etc.  Assembling, fitting and fixing materials and goods in position.  Plant and all costs in connection therewith.  Waste of materials  Square cutting  Establishment charges, overhead charges and profit.”  Consumable stores including jointing materials (but excluding gaskets and bolts and nuts and washers) PRICING TENDER DOCUMENT BASED ON BESMM4

IMPACT OF BESMM4 QUANTIFICATION RULES ON ESTIMATING VARIABLES Where ETC represent total project cost/price, q and r, the item quantities and rates respectively, and subscripts (i = 1, 2,……..,n (i.e of BESMM4) denotes the items involved. The calculation of ETC depends on two main factors: Identification of the items, i and Estimation of the parameter values, q and r. However, the reliability of estimate generated by the above estimating model is dependent on: the reliability of each quantity; q The reliability of each rate value; r The number of items‘ involved.

IMPACT OF BESMM4 QUANTIFICATION RULES ON ESTIMATING VARIABLES

 Functional: - what purpose is the component serving?  Material:- what material or materials make up the component?  Location:- where in the building is the component located?  Installation:- what methods are used to install or construct the component?  Dimensional:- what are the physical dimensions of the component?  Quantitative: - how many of the components exist within the building, and how much of the material making up the component are used?  Qualitative: - what are the qualitative and performance properties of the component, including physical form, appearance, and capacity and so on. PRICING TENDER DOCUMENT BASED ON BESMM4

BENEFITS OF ADOPTING BESMM4 FOR TENDER BOQ:  Enables the clients and cost consultants to understand what the minimum requirements are when compiling bills of quantities  Establish basis for distribution of the cost risks between clients, consultants and contractors involved in a project  Aid the effectiveness of project control and contract administration.  Minimise the tendency of disputes arising from misinterpretation of measured items.  Establish realistic basis for comparison of tender documents  Aid in establishing a basis for more competitive tendering  The resulting unit rates can be used as comparative measures between different projects. PRICING TENDER DOCUMENT BASED ON BESMM4

STATUS OF BESMM4  The status of the BESMM4 is the same with other rules of measurement; as such it is not mandatory for QS to use it.  However, if an allegation of professional negligence is made against QS, a court is likely to take accounts of the contents of any relevant guidance note is likely to take account of the contents of any relevant guidance notes published by the NIQS in deciding whether or not the QS has acted with reasonable competence (RICS,1998, 2012).

THANK YOU for your kind attention