1 e lectro m agnetic c alorimeter mechanics emc●mec Corrado Gragiulo, 13 Settembre 2011.

Slides:



Advertisements
Similar presentations
Update to RMS February 3,  2015 AMWG Leadership ◦ Esther Kent (CNP) and John Schatz (TXU), by affirmation, return as co-chairs  2015 AMWG Goals.
Advertisements

Document Management Proposed Scanning Solution September 22nd 2008.
50th GRSP Session Status report of Informal Group on FI Pierre CASTAING Chairman Informal document GRSP (50th GRSP, December 2011, agenda item.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Production Monitoring and QC FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona FCal1 Production.
MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.
1 SOFTWARE PRODUCTION. 2 DEVELOPMENT Product Creation Means: Methods & Heuristics Measure of Success: Quality f(Fitness of Use) MANAGEMENT Efficient &
Chapter 9 Database Design
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
LSST Scheduler status Francisco Delgado Sr. Software Engineer Telescope & Site.
GLAST Large Area Telescope:
Document Control Basics of Good Documentation and
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
B-4-C-1 ACI contractor begins prepping generators Power AO and BLT makes contact w/State if landfall state is known LTM needs to activate GPS units if.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Technical Support Activities in PH-ADO-PO
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
® Service Standards and Performance Measurement MTAC Workgroup 114 Status Report.
LBT Q Engineering Review SAB Static Balancing.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
State of Georgia Release Management Training
EMC simulation: effects of geometry options on energy resolution PID + EMC joint meeting LAL 27/11/2009 C. Cecchi - S. Germani* Università di PerugiaI.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
October 7, 2009H.J. Krebs1 Super B WorkShop Overview of BaBar Detector Assembly/Installation Documentation Jim Krebs.
Building the Corporate Data Warehouse Pindaro Demertzoglou Lally School of Management Data Resource Management.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
David Hitlin EMC R&D Meeting April 1, Responsibilities ItemResponsible institution/person LYSO crystal development, order optimization Forward EC.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
01 June 2011F. Raffaelli1 Super B Mechanical integration. List of reference persons and institutions for the mechanic of the sub detectors. Review of the.
A.Ryazantsev, IHEP-Protvino, RussiaPANDA Russia Workshop at Moscow, May 2015 Status on Barrel Mechanics Andrey Ryazantsev on behalf of the IHEP-Protvino.
Roberto Calabrese Ferrara University and INFN
EMC front-end Electronics
Bill Raynor Naval Research Lab
Integration meeting F.Raffaelli
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Update: EMC R&D David Hitlin SuperB R&D Meeting September 25, 2008.
SuperB and its computing requirements
Claudia Cecchi University of Perugia and INFN
Status of works on the Collaboration Contract between IHEP and FAIR
Detectors sub-system for QUBIC
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
superB Detector Workshop I University of Perugia and INFN
EMC front-end Electronics
Update on mechanical structure for the ENDCAP calorimeter
SuperB EMC Computing Foreseen activities and software/computing needs
EMC Electronics and Trigger Review and Trigger Plan
EMC Barrel Electronics Status
GLAST Large Area Telescope:
GLAST Large Area Telescope Instrument Science Operations Center
Sales Order Process.
An alternative forward endcap calorimeter design
GLAST Large Area Telescope
Integration and Test Organization Chart
Introduction and Overview
EMC Simulation Studies SuperB Collaboration Workshop LNF 1/12/2009
Detector Proto-Technical board Sep 30, 2010
Presentation transcript:

1 e lectro m agnetic c alorimeter mechanics emc●mec Corrado Gragiulo, 13 Settembre 2011

emc●mec Corrado Gragiulo, 13 Settembre BaBar EMC mechanics: recover existing information BaBar Vs SuperB EMC Barrel &Forward BaBar EMC shipment, storage

emc●mec Corrado Gragiulo, 13 Settembre BaBar emc mechanics: recover existing information  Collect existing documents SuperB Integration Group (Fabrizio Raffaelli,…) is collecting in a repository all the information available: 3D-CAD, 2D-drawings, procedures, … An Integration engineering meeting is being scheduled  Recover missing information at SLAC EMC mechanics group needs a visit to SLAC to verify present status and to collect missing information. Best if this is coordinated with the other EMC groups An EMC group visit to SLAC is being scheduled Indicate your availability on the doodle prepared by Riccardo

emc●mec Corrado Gragiulo, 13 Settembre BaBar Vs SuperB emc mechanics  Forward 1)re-use of BaBar structure (Csl crystals) Structure re-qualification (not yet started) 2) new structure (LYSO, BGO crystals) Design, structural analysis, experimental validation(in progress)  Barrel main intervention is on electronics how this change affect mechanics and services? (not yet started, need input from electronics group)  Services Cooling system Calibration system (not yet started)

emc●mec Corrado Gragiulo, 13 Settembre BaBar Vs SuperB emc mechanics  Forward new structure (LYSO, BGO crystals)  DESIGN 1)Crystals spatial distribution (in progress) 2)Alveolar structure (to hold 5x5 crystals matrix) (in progress) 3)EMC main support structures (to hold alveola) (not yet started)  PROTO 1)Proto1: alveolar structure 5x5 (completed, used for test beam) 2)Proto2 (in progress) 3)Main support structures (not yet started)  TEST Load test on Proto2 (in progress)  ANALYSIS Structural analysis (not yet started)

emc●mec Corrado Gragiulo, 13 Settembre EMC fwd new design: crystals spatial distribution  Present 3D CAD Model is based on 2008 input  A new 3D CAD model has to be developed based on up to date input from Stefano Germani (INFN Perugia)

emc●mec Corrado Gragiulo, 13 Settembre  Production Proto 2 production completed by RIBAComposites. Module delivered to INFN Perugia (A.Piluso, 8th September 2011) Proto2 is a copy of Proto1 to be used for mechanical test EMC fwd new design: Proto2

emc●mec Corrado Gragiulo, 13 Settembre  Inspection Visual and Dimensional inspection this week at INFN Perugia to validate production process. Dimensional survey of the Proto2 to be compared with the previous survey on Proto1(in progress) EMC fwd new design: Proto2

emc●mec Corrado Gragiulo, 13 Settembre  Load test A load test campaign will be performed for module mechanical caractherization. Test will be performed at Dip. di Fisica e Ingegneria dei Materiali e del Territorio, Università Politecnica delle Marche, under Fabrizio Davì, Daniele Rinaldi. Test bench production, tets procedures, test schedule will be defined in a meeting at INFN Perugia next week (tentative) EMC fwd new design: Proto2 test bench

emc●mec Corrado Gragiulo, 13 Settembre  Shipment A transport strategy shall be defined within SuperB collaboration (under discussion with Integration Group)  HOW EMC to define the requirements for the shipment of the crystals/structure: shipping frame, dumping systems, thermal control, …  WHEN EMC to define timing request for the shipment EMC to verify if any constraint /limitation on controlled storage at SLAC could affect shipment time  WHERE EMC to define storage area location and dimensions requirements Forward and barrel calorimeter will go through several processing phases from the reception to the final integration. An hardware flow and processes sequence should be defined and optimized to minimize crystal/hardware transport, handling and to avoid duplication of jig&tools EMC technical meeting to discuss these aspects is suggested BaBar emc shipment, storage

emc●mec Corrado Gragiulo, 13 Settembre While waiting for a SuperB repository area all the information on EMC mechanics is being stored at emc-mec information