SRM-DRM ITB Service Integration Plan Jorge Rodriguez OSG Integration Workshop at UC Feb 15-18, 2005.

Slides:



Advertisements
Similar presentations
TOPIC FOR THE DISCUSSION SECTION AUTHOR ONE AUTHOR TWO AUTHOR THREE FIFE Workshop Template Service Name.
Advertisements

GENI Experiment Control Using Gush Jeannie Albrecht and Amin Vahdat Williams College and UC San Diego.
Software Project Transition Planning
IT Learning Programme The Evaluations Tool Pilot Project 19 th July 2010.
Geant4 Documentation and User Support Geant4 Users Workshop February 2002 Dennis Wright (SLAC)
Revised Change, Configuration, Release (CCR) Rollout Overview
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Tuesday 13 th October MIREC Documents Procedures MIREC-1 - Terms of Reference & Procedure for MIREC Review of Research Projects Involving Human.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
KIT – University of the State of Baden-Württemberg and National Laboratory of the Helmholtz Association STEINBUCH CENTRE FOR COMPUTING - SCC
Mr C Johnston ICT Teacher BTEC IT Unit 05 - Lesson 15 Network Tools and Utilities.
OSG Operations and Interoperations Rob Quick Open Science Grid Operations Center - Indiana University EGEE Operations Meeting Stockholm, Sweden - 14 June.
Project Name Description (optional). Template (Remove this Slide) General template for describing and/or selling a project. Provides context to the audience.
OSG Services at Tier2 Centers Rob Gardner University of Chicago WLCG Tier2 Workshop CERN June 12-14, 2006.
Integration and Sites Rob Gardner Area Coordinators Meeting 12/4/08.
OSG Middleware Roadmap Rob Gardner University of Chicago OSG / EGEE Operations Workshop CERN June 19-20, 2006.
The Disk Resource Manager A Berkeley SRM for Disk Cache Implementation and Testing Experience on the OSG Jorge Luis Rodriguez IBP/Grid Mini-Workshop Apr.
The Future of Public Sector Quality Management with CAF The CAF External Feedback Procedure 2010.
A. Sim, CRD, L B N L 1 OSG Applications Workshop 6/1/2005 OSG SRM/DRM Readiness and Plan Alex Sim / Jorge Rodriguez Scientific Data Management Group Computational.
ITB Release Process Suchandra Thapa Computation Institute / University of Chicago.
KS3 Phase4 Client Server Monitoring System October 1, 2008 by Stephen, Seema, Kam, Shpetim.
Scott Butson District Technology Manager. Provide professional to all district staff Professional development has been provided on a regular basis to.
Module 2: Using Microsoft Visual Studio.NET. Overview Overview of Visual Studio.NET Creating an ASP.NET Web Application Project.
1 Infra-SAN: Technical architecture buildup. 2 Technical architecture buildup Purpose : Service driven Formalise the test definition and realisation Technical.
OSG Tier 3 support Marco Mambelli - OSG Tier 3 Dan Fraser - OSG Tier 3 liaison Tanya Levshina - OSG.
Preparation for Integration Organized access to the code WP6 infrastructure (MDS-2, RC, …) Input from WPs on requirements,... Acquire experience with Globus.
M ONITOR & C ONTROL Focus is on Integrated Change Control 1.
Grid Operations Lessons Learned Rob Quick Open Science Grid Operations Center - Indiana University.
US LHC OSG Technology Roadmap May 4-5th, 2005 Welcome. Thank you to Deirdre for the arrangements.
Documentation Workflows D. Olson 13 Mar 2006 DRAFT.
OSG Integration Activity Report Rob Gardner Leigh Grundhoefer OSG Technical Meeting UCSD Dec 16, 2004.
6/23/2005 R. GARDNER OSG Baseline Services 1 OSG Baseline Services In my talk I’d like to discuss two questions:  What capabilities are we aiming for.
Sofia Event Center May 2014 Martin Kulov Continuous Delivery with Microsoft Release Management.
Site Validation Session Report Co-Chairs: Piotr Nyczyk, CERN IT/GD Leigh Grundhoefer, IU / OSG Notes from Judy Novak WLCG-OSG-EGEE Workshop CERN, June.
Software Release Procedure Session MANAGEMENT and FUTURE directions Form ongoing ‘empowered’ Technical Discussion Group (TDG) Any future project definitions(resources.
The OSG and Grid Operations Center Rob Quick Open Science Grid Operations Center - Indiana University ATLAS Tier 2-Tier 3 Meeting Bloomington, Indiana.
Production Oct 31, 2012 Dan Fraser. Current Production Focus Transition to RPMs 52(44) sites using RPM based installs 52(44) sites using RPM based installs.
MTSS PRESENTATION SEPTEMBER, 2013 NCSC Summative Assessment Update.
Discovery Environment Tool Integration High Level Overview.
OSG Area Coordinator’s Report: Workload Management Maxim Potekhin BNL May 8 th, 2008.
Area Coordinator Report for Operations Rob Quick 4/10/2008.
Grid Research & educatiOn IoWa (GROW) ITS Academic Technologies – Research Services The University of Iowa Iowa City, IA 52242, USA Nov. 30, 2005.
Open Science Grid OSG Resource and Service Validation and WLCG SAM Interoperability Rob Quick With Content from Arvind Gopu, James Casey, Ian Neilson,
INFSO-RI Enabling Grids for E-sciencE Operations Parallel Session Summary Markus Schulz CERN IT/GD Joint OSG and EGEE Operations.
Tier 3 Support and the OSG US ATLAS Tier2/Tier3 Workshop at UChicago August 20, 2009 Marco Mambelli –
Introduction to the Baseline Study November 2010 – February 2011 Purpose, key questions and components.
Opensciencegrid.org Operations Interfaces and Interactions Rob Quick, Indiana University July 21, 2005.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
Panasonic UC Pro - Activation Keys installation -
Integration TestBed (iTB) and Operations Provisioning Leigh Grundhoefer.
OSG Status and Rob Gardner University of Chicago US ATLAS Tier2 Meeting Harvard University, August 17-18, 2006.
Monitoring and Information Services Core Infrastructure (MIS-CI) Service Description Mark L. Green OSG Integration Workshop at UC Feb 15-17, 2005.
Grid Deployment Technical Working Groups: Middleware selection AAA,security Resource scheduling Operations User Support GDB Grid Deployment Resource planning,
CERN LCG1 to LCG2 Transition Markus Schulz LCG Workshop March 2004.
OSG Facility Miron Livny OSG Facility Coordinator and PI University of Wisconsin-Madison Open Science Grid Scientific Advisory Group Meeting June 12th.
Open Science Grid Configuring RSV OSG Resource & Service Validation Thomas Wang Grid Operations Center (OSG-GOC) Indiana University.
GridCat ITB Service Integration Plan Bockjoo Kim OSG Integration Workshop at UC Feb 15-17, 2005.
Grid Colombia Workshop with OSG Week 2 Startup Rob Gardner University of Chicago October 26, 2009.
Operations Interfaces and Interactions
Richard Carr, ESAC, January 2015
Open Science Grid Progress and Status
SAP Value Assurance plan and safeguard service package for SAP SuccessFactors HCM Suite Business Needs Need to follow leading practices and reduce risk.
ED 690: Reflecting, Writing, and Reviewing the PDP
IEEE Std 1074: Standard for Software Lifecycle
Development Projects / Analysis Projects / On-site Service Projects
9/18/2018 Department of Software Engineering and IT Engineering
Leigh Grundhoefer Indiana University
حركات كششي ماهيچه ها كشش ماهيچه ها بخش كليدي يك برنامه ورزشي است. حركات كششي قبل از رفتن به محل كار (اگر ماهيچه هاي سفت و آسيب ديده داريد) مي تواند بدن.
12 Safe Maintenance Rules
While the audience is gathering. During breaks etc
Presentation transcript:

SRM-DRM ITB Service Integration Plan Jorge Rodriguez OSG Integration Workshop at UC Feb 15-18, 2005

2/15/052 Template Purpose This talk is meant to describe procedures used by service providers, ITB site administrators, validation actors (VO applications and other services) used throughout the integration process Its should first describe what constitutes success for ITB release Pending issues and next steps should be identified

2/15/053 Service Description Provide a functional description of the service Describe resource requirements Describe dependencies Describe the integration validation test

2/15/054 Installation and Configuration Discuss site-level install & configuration procedures (if applicable) Describe ITB-level service installation & configuration (if applicable) – GridCat and Monalisa fall into this category Delivery method –e.g. Tools used (Pacman2,3 …) Configuration high points –Main set of issues that require attention

2/15/055 Test and Validate The service is considered tested after: –site level test (post-install): –resource provider test: –application test: –service monitor? each of these should be described in terms of functionality and scale

2/15/056 Support and Documentation Links Contact information for support of the service in the integration phase –this could be distinct from production operations in the fully deployed OSG

2/15/057 Pending Issues and Next Steps List here known problems or pending issues What are the next steps? Who? Rough timeline