The Fire Sprinkler Certification Process What prevents certification? Matt McLellan Aon Sprinkler Certification October 2014.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

A Joint Code of Practice Objectives and Summary Presentation
Constructability Review
Why Plan Ahead? Limit Susceptibility Limit Risk Contain Material Loss Contain Human Impact Limit Down-Time Ensure Longevity FEMA Fact: 80% of businesses.
Software Solutions for Landscape Professionals Change Orders made easy with DS|Manage360 Planning for Profitability 2012 Webinar Series June 28, 2012 Presenter:Marcus.
1 Lincolnshire Fire & Rescue Training Centre FIXED INSTALLATIONS SPRINKLERS COMPETENCE STATEMENT 376.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
Buildings and Structures 2 Fixed Installations Aim To provide students with information to allow them to recognise the types of fixed fire protection.
What do Civil Engineers do? Design Civil Infrastructure Roadworks Earthworks Stormwater Management.(Including Detention & Quality Measures) Sewer Water.
BS9990 : 2015 Updates and/or Changes
N.F.P.A. 13R Justin Bohlmann FIR-204.
Booster System Basics: Constant Speed Systems
Energy Savings from Supplying Drinking Water at Two Pressure Levels - a Retrofit in Las Delicias, El Salvador, EWB-MAP Presented by Adam A. Brostow November.
Site Waste Management Plans Presentation – September 2009 Planning Agents’ Forum.
Module 2, Office Layout.
Backflow Preventor. (4) The Contractor V may install the cross-connection backflow prevention device as defined in this chapter on new installations.
Diesel Generator Reliability: Lessons Learned from Storms
Dennis Sabre Fire Appliances
Energy Savings from Supplying Drinking Water at Two Pressure Levels - a Retrofit in Las Delicias, El Salvador, EWB-MAP.
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
FPF190: Fire Protection Fundamentals FPF190 Fire Protection Fundamentals 1 Code Consultant.
Enterprise Architecture
CNG STATION & GARAGE MODIFICATION CODES & STANDARDS Graham Barker Business Development Manager.
Keeping them Straight October 11,  Piping components come in two categories  Building Piping Components  Underground Piping Components.
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
Risk Consulting REVISION TO EN and CEA 4001 EFSN – MAY 2014.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Emergency Action Plans Miriam Gradie Anderson Planning Specialist 608/ Wisconsin Department of Natural Resources.
Slide Title EDUCATING SUPPORTING REPRESENTING title goes here Borrower Survey Chartered Accountants NAMA FORUM Conor O’Brien.
Fire Pump Functions The main function of a fire pump is to increase the pressure of the water that flows through it. Inadequate or nonexistent municipal.
EPR ‘Fundamentals of Calculation of Earth Potential Rise in the Underground Power Distribution Cable Network’ by Ashok K. Parsotam (1997) available free.
Pre Incident Planning and Related Loss Reduction Strategies
Managing the development and purchase of information systems (Part 1)
NFPA 31 Standard for the installation of Oil- Burning Equipment
INSURANCE DOCUMENTS There are various insurance documents used for different types of insurance, which are essential for all classes of insurance business.
FIRE PROTECTION TOPICS OF INTEREST Defense Nuclear Facilities Safety Board.
What is EcoScan? EcoScan is a small environmental consultancy that is principally concerned with: The development and implementation for its clients of.
Introduction to the ISO series ISO – principles and vocabulary (in development) ISO – ISMS requirements (BS7799 – Part 2) ISO –
5.1 Student Book © 2005 Propane Education & Research Council 5.1 Designing & Installing Dispenser Transfer Systems.
Copyright © 2007 Pearson Education Canada 1 Chapter 24: Assurance Services: Internal Auditing and Government Auditing.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Backflow Prevention for Fire Sprinkler Systems State of Illinois Plumbing Code.
Construction Review LaVon M Marshall Greenfield District Utility/RR Engineer, INDOT June 11, 2015.
1 Kingsley Karunaratne, Department of Accounting, University of Sri Jayewardenepura, Colombo - Sri Lanka Practice Management.
Providing Services to the Energy Industry Presentation By EPCM Consultants Pty Ltd EPCM Consultants Pty Ltd Comdain Group.
CSOC – Certification Structure Oversight Committee Application Guidance October 2015.
06/01/20161 Benny Hoff TÜV NORD Sweden AB AFS 2002:1 Use of pressure equipment.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
THE IMPORTANCE OF SANITARY SURVEYS by Mary L. Howell, Backflow Management Inc.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Sprinkler Loads on Trusses
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
 To discuss MassDEP’s draft revisions to the following regulations:  Stage II – 310 CMR 7.24(6)  Stage I – 310 CMR 7.24(3)  Definitions – 310 CMR.
18-1 Copyright © 2016 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
Trusted to deliver excellence © 2016 Rolls-Royce plc and/or its subsidiaries The information in this document is the property of Rolls-Royce plc and/or.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
PAUL GRIMSHAW. FIRE ISSUES IN LITIGATION Leaky Building Litigation – Traditional Defendants Council Builders Developers Architects Cladding manufacturers.
Fieldbus Foundation General Assembly 2008 Project Planning and Execution Mike Downey Jacobs Engineering.
Backflow Special Interest Group Christchurch Christchurch 24 September 2008.
C LAUSES & W ARRANTIES Presented by: MR. EDGARDO V. BETITO.
SECTION 106 UPDATE DARREN WILDING DCLG. S106 - LEGISLATION Section 106 of the Town and Country Planning Act 1990 restricts the development or use of the.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
Content of Tender Dossier - Instructions to Tenderers - Tenders
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Flooding Walkdown Guidance
Subsea 100 Global Services Products Presentation
Fire Protection Survey Procedure
4th Annual Construction Law Summit
National Association of State Conservation Agencies
QGIS, the data model, use and storage
Presentation transcript:

The Fire Sprinkler Certification Process What prevents certification? Matt McLellan Aon Sprinkler Certification October 2014

Aon Risk Solutions | Global Risk Consulting Proprietary & Confidential 1 What prevents certification?  This presentation is intended to help explain some of the requirements around information required to certify and close out projects and hopefully make the process smoother for all involved?  Look at varying requirements for different project types.  Different project stages.  Information from various parties.  In order to avoid this………………

Aon Risk Solutions | Global Risk Consulting Proprietary & Confidential 2 Project Type  Three broad project categories:  New installations.  Extensions to existing installations.  Alterations (including water supply changes).

New Installation Documentation (pre construction)  Design parameter application (Form 1) – the other comments section provides scope to clarify anything unusual in the design  Storage protection supplement (Form 1a)  Storage declaration (critical component for warehousing etc)  Clear block plan and cross section  Fire Report (consent version)  Water supply information (current flow test)  Pump details and tank (if applicable) Aon Risk Solutions | Global Risk Consulting Proprietary & Confidential

Extensions (some unique requirements)  Copy of the current biennial / annual survey (overall condition of system)  Fire Report requirements for extensions adopting superseded standards  Is certification required for the existing installation as well? (can get involved if existing system has never been certified) Aon Risk Solutions | Global Risk Consulting Proprietary & Confidential

Alterations (unique requirements)  Same need for survey and fire report etc  Water supply upgrades need all documentation pertaining to proposed supply and any addition of pumps / tanks  Internal alterations need an application if over certain limits (refer SNZ FI- 100 if in doubt)  Alterations can get confusing – as shown! Aon Risk Solutions | Global Risk Consulting Proprietary & Confidential

Design Stage – potential problems  Designing to a superseded standard (logical in some cases, but not in others – ie, EPS building to 1987 Standard)  Confirming NZBC modified or not – not always obvious  Out of date water supply information, many councils are adopting / investigating pressure reduction to reduce leakage and maintenance costs  Pump information – need both the pump curve and engine power curve  Water supply tanks – need drawings to confirm volume and producer statements for the tank and foundation design Aon Risk Solutions | Global Risk Consulting Proprietary & Confidential

Design Stage – potential problems  Making sure the client understands what they are going to store – idle pallets don’t mean no storage in the context of a sprinkler system. Aon Risk Solutions | Global Risk Consulting Proprietary & Confidential

Design Stage – potential problems  Omission of sprinklers in various areas (ie, server rooms / transformer rooms)  Water supply connections ‘by others’, can cause problems with metering, valving etc.  Freeze protection – refer Appendix L for ‘guidance’……………  Preferable to close out design review queries early!  Provisions to be able to successfully flow test (high flows will easily cause damage) Aon Risk Solutions | Global Risk Consulting Proprietary & Confidential

Design Stage  Landscaping in front of the FSI is not the best idea Aon Risk Solutions | Global Risk Consulting Proprietary & Confidential

Construction Stage  Installer typically / historically will engage the inspection provider  Inspection needs to be timely, difficult for all concerned if linings are complete by the time of inspection  First fix needs to be able to review ceiling space pipe work, sprinkler coverage, fire separations, flexible dropper assembly installation etc  Tenancy fit outs can introduce more onerous protection requirements  Significant design changes should be communicated to SSC  Seismic design - inspection company will review Aon Risk Solutions | Global Risk Consulting Proprietary & Confidential

Construction Stage  External fire loads can often be a surprise (NZBC does not delete ‘other exposures’ covered in NZS4541:2013 clause 206 – but standard now has guidance) Aon Risk Solutions | Global Risk Consulting Proprietary & Confidential

Completion Documentation (from installer)  Form 1 (Signed completion statement / producer statement)  Asbuilt drawings and block plan (including asbuilt flow testing)  Hydraulic calculations (including a clear node diagram)  Flexible dropper allowances need to be quantified against data sheet  Pressure test certificates for dry systems, FSI’s and underground pipe work etc  Flushing evidence for underground pipe work Aon Risk Solutions | Global Risk Consulting Proprietary & Confidential

Completion Documentation (from installer)  Inspection company sign off (IANZ endorsed sign off report – need more than the traditional ‘letter to connect’)  Producer statements for tank and foundation construction  Confirmation of NZFS connection Aon Risk Solutions | Global Risk Consulting Proprietary & Confidential

Completion Documentation (Inspection Company)  Sign off reporting (IANZ endorsed)  Full flow testing information (complete information if pumps are included)  Testing of tank infill rates to provide adequate evidence of an acceptable water supply duration  Inspection company may have comments in regards to any items raised at design review Aon Risk Solutions | Global Risk Consulting Proprietary & Confidential

Other Issues  Diesel engine speed control on pump boosted towns main supplies  Test return arrangements to date are not letting the pump run under full load on the weekly test (often only a fast idle)  NZS4541:2013 clause gives guidance on arrangements to achieve weekly testing at full engine speed / load, new clause that has not been readily adopted yet  Site water supplies  Recent projects have had trouble achieving compliance due to the site reticulation not being coordinated with fire sprinkler requirements  Valving and hydrant arrangements have been the typical problems Aon Risk Solutions | Global Risk Consulting Proprietary & Confidential

Other Issues  All parties need to be clear in regard to scope of certification (ie – base build only etc)  Certification of old systems  From time to time it is requested that an old system be certified or recertified  This is readily achievable if evidence of previous certification is available  If not it is more involved and will effectively require the information that would be supplied for a new installation  This has been an issue recently, with some councils requiring site wide certification at the time of relatively minor alterations / extensions Aon Risk Solutions | Global Risk Consulting Proprietary & Confidential

Questions / Comments  The preceding content has been intended to assist in the process of achieving compliance / certification for sprinkler projects, we trust it has been of some assistance. Aon Risk Solutions | Global Risk Consulting Proprietary & Confidential