FLOODS AND FLASH FLOODS Prepared by: Ridham Goti(130054106001)

Slides:



Advertisements
Similar presentations
Bangladesh flooding Project By Tara and Alex. When? Where?
Advertisements

FLOODS AND DROUGHTS IN 2002 IN THE CAMBODIAN PARTS OF THE MEKONG BASIN — EXPOSURE, RESPONSE AND LESSON LEARNED — Prepared for THE SECOND ANNUAL FLOOD FORUM,
Responses By Ben, Phoebe, Alan and Nathan. Modify the Loss Aid – vital for poor people Insurance – more useful for people in richer communities or countries.
Flood Management in GBM Basin: A Mechanism for Natural Resource Management Between Co-riparians Priyanka Mallick JNU.
1 Climate Change and the Most Vulnerable Countries: The Imperative to Act, Informal Meeting of UNGA, New York, 8 July 2008 Disaster Risk.
AIACC Regional Study AS07 Southeast Asia Regional Vulnerability to Changing Water Resources and Extreme Hydrological due to Climate Change.
Cyclone and Tsunami Risk Mitigation Measures in India Presented by Shri H. S. Brahma Additional Secretary National Disaster Management Authority Government.
Question of the day: How is a Tucson flood like a redneck divorce?
LCG-DER Meeting 10 July 2014 Flood / Monsoon Preparedness 2014 Department of Disaster Management Ministry of Disaster Management & Relief.
Protection and Disaster Risk Reduction (Place) – (Date) Session 6.1: Integrating Protection into Disaster Risk Reduction.
Flood management. Flood Management Floods occur when discharge exceeds bankfull capacity. Water leaves channel to cover adjacent land – the flood plain.
FLOODS AND FLASH FLOODS M.P.Singh Superintending Engineer Hydrological Observation Circle Central Water Commission, Guwahati.
1 Flood Risk Management Session 3 Dr. Heiko Apel Risk Analysis Flood Risk Management.
ROLE OF COMMUNITY HEALTH NURSE IN DISASTER MANAGEMENT
BRIEF INTRODUCTION ON THE CURRENT WARNING SYSTEM IN VIET NAM Do Quynh HOA, VIET NAM Regional Trainning on Severe Weather Forecasting and Warning Services:
Ministry of Land, Infrastructure, Transport and Tourism Risk based Flood Management for adapting to Climate Change March 17, 2009 Toshio OKAZUMI Director.
ACTIONS TAKEN BY THE COLOMBO MUNICIPAL COUNCIL FOR REDUCING THE RISKS OF NATURAL DISASTERS IN COLOMBO CITY PRESENTED BY OMAR KAMIL CHIEF CITY ADMINISTRATOR.
California Data Exchange Center Hydrologic Database System
The 2 nd MRC Annual Flood Forum Oct Phnom Penh-Cambodia Prepared by: Mr. Do Manh Hung, Chief of Planning and Program Management Division -
Water resource specialists Global Warming and the Padma Bridge in Bangladesh water resource specialists.
By studying the layers of snowpack we can improve our predictions of when and where avalanches are likely to occur. Note that precipitation amounts seem.
ORGANISING CIVIL DEFENCE COMMUNITY PREPARDNESS FOR FLOODS & CYCLONES Dr.P.R.S.CHETAN CHIEF WARDEN –BANGALORE KARNATAKA CIVIL DEFENCE CORPS.
Dr Richard Johnson, Mountain Environments, UK.  Lead Partner: Germany: Research Institute of Forest Ecology and Forestry  Partner countries: Germany,
Workshop on RISKS AND IMPACTS ON FLOOD FROM EXTREME EVENTS IN ASEAN COUNTRIES Bali, August 5 th 2015.
1. Flood Management in the Vaal- and Orange River System December February 2011 Johan van Heerden & Brink du Plessis (Chief Eng.) D: HS Elias Nel.
Flood Risk Management in Hat Yai, Thailand
Floods Week 4. Questions for Homework & Discussion  Would you live in a flood-prone area?)  What level of risk from flooding is acceptable to you? 
Users FLOOD EARLY WARING IN THE LOWER MEKONG BASIN Manithaphone Mahaxay.
Bangladesh Flood Risk Update Flood Risk Rising World Food Programme (WFP) Disaster Risk Reduction (DRR) 29 th August 2008.
Flood Mapping in Korea Yang-Su Kim
Workshop on the Strategy and Action Plan of the WMO Flood Forecasting Initiative Geneva, 8 – 10 December 2009 Flood Forecasting Issues in Ghana by J. Wellens-Mensah.
FLOOD MANAGEMENT By: Joyce Mathole Directorate: Hydrological Service Department of Water Affairs and Forestry.
Perceived Climate Change Impacts and Exposure Units ASTRA Conference May 2006 Klaipeda Jürgen Kropp & Klaus Eisenack Potsdam Institute for Climate.
Central Water Commission - Design and Analysis A cumulative basin impact study for Siang sub-basin of Brahmaputra basin carried out and master plan based.
FLOODPLAIN MANAGEMENT AND THE U.S. ARMY CORPS OF ENGINEERS Paul Bourget Directorate of Research and Development Headquarters, U.S. Army Corps of Engineers.
Improving Quality of Area & Production Estimates of Crops By Directorate of Economics & Statistics Department of Agriculture & Cooperation Ministry of.
Bangladesh Progress of Flood Reconstruction Programmes
Integrated assessment of socio-economic risks of dangerous hydrological phenomena in Russian coastal zones of the Baltic, the Azov and the Black Seas Lomonosov.
 A sudden tremor on the Earth’s surface.  Caused by movements deep inside the Earth.  Huge disaster- death, buildings collapse, roads cave in,
Meteorological & Hydrological data for water resources development.
Design of meteorological data networks Dr. Anil Kumar Lohani National Institute of Hydrology, Roorkee India Hydro-Met Network Design Workshop, April 6-11,
Economics Discipline Khulna University – 9208, Bangladesh Md. Firoz Ahmed Assistant Professor Course Code: Econ 5217 Course.
Preparation of a Strategic Pilot Program for Climate Resilience (PPCR) Project - Phase I (November January 2013) Climate Investment Funds (CIF) Grant.
N. K. Manglik Director.  Hydro-meteorological observations could be broadly defined as the scientific way for collection of flow data at a specific location.
FLOODS IN GHANA June 5, 2015 Walter Hays, Global Alliance for Disaster Reduction, Vienna, Virginia, USA Walter Hays, Global Alliance for Disaster Reduction,
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
Floods Hard and Soft Engineering Lo; to understand the sustainability of differing flood protection methods.
INSTITUTE OF METEOROLOGY AND WATER MANAGEMENT PANEL II: ROLE OF NMHSS IN RISK IDENTIFICATION AS A FUNDAMENTAL BASIS FOR DISASTER RISK REDUCTION AUTHOR:
Disaster Risk Management Concepts and Applications Southern Province of Sri Lanka 1.
C.K Pithawalla College Of Engg. & Tech. Hydrology And Water Resources Enigineering.
ADB – Transport Sector Operations in India New Delhi, 26 October 2012 India- Spain Multilateral Partnership Meeting.
HYDROLOGY AND WATER RESOURCES ENGINEERING. FROM: BARAIYA HINAL( ) RAVAL JANHAVI( ) SHAH MANSI ( ) PANCHAL URVI ( )
Flood Management 1. 2 What if Flood?? Flow which is relatively high and overtops the bank…is called Flood 3.
Adapting transport infrastructure to climate change The role of standardization Adapting transport infrastructure to climate change The role of standardization.
National Hydrology Project Dr
A Presentation to the 2017 GEO Work Programme Symposium,
VULNERABILITY PROFILE AND MAPPING OF INDIA
Flood Management Constitution Ministry of Energy
Determining Flood Management Constitution in Ministry of Energy
DROUGHT AND FLOOD Prepared by M. U. Kale Assistant professor Deptt
Digital model for estimation of flash floods using GIS
Flood management.
ASSESSMENT OF ENVIRONMENTAL FLOWS FOR THE TAPI RIVER BASIN, INDIA
National Hydrology Project
Flood Mapping in Korea Yang-Su Kim
Flood Monitoring Tools 2011 OFMA Annual Conference
e -Surface Water Information System Data Entry System
Floods and Flood Routing
Managing River Floods Natural Physical Causes of Floods
(6-8 November 2018, Beijing, China)
Presentation transcript:

FLOODS AND FLASH FLOODS Prepared by: Ridham Goti( )

FLOODS ARE NATURAL PHENOMENA. FLOODS

 FLOODS ARE WATER RELATED DISASTER  WATER RESOURCES MANAGEMENT INCLUDES MANAGEMENT OF THESE DISASTERS

CAUSES OF FLOODS  PRECIPITATION  INADEQUATE CAPACITY (WITHIN BANKS)  BANK EROSION AND SILTING  LAND SLIDES  TIDAL AND BACK WATER EFFECTS  POOR DRAINAGE  SNOW MELT AND GLACIAL OUT BURSTS

FLOOD MANAGEMENT GEOGRAPHICAL328 FLOOD PRONE4012% PROTECTABLE3280% PROTECTED16.445% FLOOD AFFECTED  AVERAGE7.7  MAXIMUM17.5(1978)  MINIMUM1.5(1965) GEOGRAPHICAL328 FLOOD PRONE4012% PROTECTABLE3280% PROTECTED16.445% FLOOD AFFECTED  AVERAGE7.7  MAXIMUM17.5(1978)  MINIMUM1.5(1965) INDIA AREA (M. Ha)

FLOOD MANAGEMENT INDIA FLOOD PRONE AREA - 40 M.Ha. OTHER STATES 43.9% OTHER STATES 43.9% UTTAR PRADESH 21.90% UTTAR PRADESH 21.90% BIHAR 12.71% BIHAR 12.71% ASSAM 9.40% ASSAM 9.40% WEST BENGAL 7.91% WEST BENGAL 7.91% ORISSA 4.18% ORISSA 4.18%

FLOOD MANAGEMENT INDIA AREA AFFECTED BY FLOODS YEAR AREA IN M.Ha. 1999

FLOOD DAMAGE IN INDIA DURING RUPEES IN CRORE YEAR

 INDISCRIMINATE ENCROACHMENT  INCREASING ECONOMIC AND DEVELOPMENTAL ACTIVITIES IN FLOOD PLAINS  LACK OF REGULATIONS  INADEQUATE DRAINAGE SYSTEM  INADEQUATE MAINTENANCE  LACK OF DISASTER PREPAREDNESS  INDISCRIMINATE ENCROACHMENT  INCREASING ECONOMIC AND DEVELOPMENTAL ACTIVITIES IN FLOOD PLAINS  LACK OF REGULATIONS  INADEQUATE DRAINAGE SYSTEM  INADEQUATE MAINTENANCE  LACK OF DISASTER PREPAREDNESS INCREASED VULNERABILITY CAUSES INCREASED VULNERABILITY CAUSES

FLOOD MANAGEMENT  FLOODS CAN NOT BE ABSOLUTELY CONTROLLED  FLOODS CAN ONLY BE MANAGED TO REDUCE FLOOD LOSSES  FLOODS CAN NOT BE ABSOLUTELY CONTROLLED  FLOODS CAN ONLY BE MANAGED TO REDUCE FLOOD LOSSES APPROACH

FLOOD MANAGEMENT  MODIFY THE FLOODS  MODIFY THE SUSCEPTIBILITY TO FLOOD DAMAGE  MODIFY THE LOSS BURDEN  BEAR THE LOSS  MODIFY THE FLOODS  MODIFY THE SUSCEPTIBILITY TO FLOOD DAMAGE  MODIFY THE LOSS BURDEN  BEAR THE LOSS STRATEGIES

FLOOD MANAGEMENT ORGANISATIONS  STATE FLOOD CONTROL DEPARTMENTS  CENTRAL WATER COMMISSION  GANGA FLOOD CONTROL COMMISSION  BRAHMAPUTRA BOARD  MHA - NDM DIVISION

FLOOD MANAGEMENTMEASURES  STRUCTURAL :PHYSICAL WORKS FOR MEASURES MODIFYING FLOOD MAGNITUDE ( TO KEEP FLOODS AWAY FROM PEOPLE )  NON-STRUCTURAL :PLANNED ACTIVITY TO MODIFY MEASURESSUSCEPTIBILITY TO FLOOD DAMAGE ( TO KEEP PEOPLE AWAY FROM FLOODS )  STRUCTURAL :PHYSICAL WORKS FOR MEASURES MODIFYING FLOOD MAGNITUDE ( TO KEEP FLOODS AWAY FROM PEOPLE )  NON-STRUCTURAL :PLANNED ACTIVITY TO MODIFY MEASURESSUSCEPTIBILITY TO FLOOD DAMAGE ( TO KEEP PEOPLE AWAY FROM FLOODS )

FLOOD MANAGEMENT  DAMS & RESERVOIRS  EMBANKMENT  CHANNEL IMPROVEMENT  RIVER DIVERSION  INTER BASIN TRANSFER  ANTI EROSION WORKS STRUCTURAL MEASURES

FLOOD MANAGEMENT  FLOOD FORECASTING & WARNING  FLOOD PLAIN ZONING  FLOOD FIGHTING  FLOOD PROOFING  FLOOD INSURANCE  RELIEF & REHABILITATION NON STRUCTURAL MEASURES

FLOOD PLAIN ZONING WATER SUPPLY FACTORY POWER HOUSE UNIVERSITY RESIDENTIAL AREA GOVT. OFFICE HOSPITAL NORMAL CHANNEL PARK FREQUENT FLOOD FLOOD ONCE IN 25 YEARS FLOOD ONCE IN 100 YEARS III II IIII I

FLOOD PLAIN ZONING PROHIBITIVE RESTRICTIVE WARNING RESTRICTIVE I I II III II I I RIVER CHANNEL

FLOOD FORECASTING BEGINNING  STARTED BY CENTRAL WATER COMMISSION  YEAR 1958  RIVER YAMUNA  FORECASTING STATION DELHI RAILWAY BRIDGE BEGINNING  STARTED BY CENTRAL WATER COMMISSION  YEAR 1958  RIVER YAMUNA  FORECASTING STATION DELHI RAILWAY BRIDGE INDIA

FLOOD FORECASTING AND WARNING DATA COLLECTION DATA TRANSMISSION DATA ANALYSIS & FORECAST FORMULATION DISSEMINATION OF FORECAST DATA COLLECTION DATA TRANSMISSION DATA ANALYSIS & FORECAST FORMULATION DISSEMINATION OF FORECAST STEPS

FLOOD FORECASTING  HYDROLOGICAL RIVER WATER LEVEL RIVER DISCHARGE  HYDROMETEOROLGICAL RAINFALL OTHER RECIPITATION eg. SNOW, HAIL ETC.  HYDROLOGICAL RIVER WATER LEVEL RIVER DISCHARGE  HYDROMETEOROLGICAL RAINFALL OTHER RECIPITATION eg. SNOW, HAIL ETC. DATA COLLECTION

FLOOD FORECASTING  WIRELESS  TELEPHONE  FAX  WIRELESS  TELEPHONE  FAX DATA TRANSMISSION SATELLITE TELEGRAPH TELEX SATELLITE TELEGRAPH TELEX

FLOOD FORECASTING  CORRELATION  MATHEMATICAL MODELS  CORRELATION  MATHEMATICAL MODELS DATA ANALYSIS & FORECAST FORMULATION

FLOOD FORECASTING DISSEMINATION FORECAST CIVIL AUTHORITY OTHER AGENCIES PRESS, A I R DOORDARSHAN PRESS, A I R DOORDARSHAN OTHER USERS LOCAL REPRESENTATIVES OTHER USERS LOCAL REPRESENTATIVES

FLOOD FORECASTING AND WARNING PRESENT SYSTEM - SCHEMATIC DIAGRAM WEATHER FORECASTS RIVER STAGE & DISCHARGE AT BASE STATION RIVER STAGE & DISCHARGE AT BASE STATION RIVER STAGE & DISCHARGE AT FORECASTING STATIONS RIVER STAGE & DISCHARGE AT FORECASTING STATIONS RAINFALL F.M. O. OF I.M.D FLOOD FORECASTING CENTRES & CONTROL ROOMS FLOOD FORECASTING CENTRES & CONTROL ROOMS FORMULATION OF FORECAST FORMULATION OF FORECAST C.E., S.E. STATE GOVT. CONTROL ROOM STATE GOVT. CONTROL ROOM PRESS RADIO P & T POLICE FLOOD COMMITTEE CIVIL AUTHORITIES ENGG. AUTHORITIES DEFENCE RAILWAYS INDUSTRIES F.M.O OF I.M.D REGIONAL OFFICES OF I.M.D. REGIONAL OFFICES OF I.M.D. REGIONAL OFFICES OF I.M.D. REGIONAL OFFICES OF I.M.D. DOORDARSHAN CWC HQ MINISTRY OF WR

FLOOD MANAGEMENT scope  Use of Remote Sensing and GIS  Research and Development  Weather / Rainfall Forecasting  FF Modelling  Capacity Building  International Cooperation

FLOOD FORECASTING NETWORK  COVERS MAJOR AND INTER STATE RIVER BASINS. 166 STATIONS :- INFLOW 27 & STAGE 139  COVERS MAJOR AND INTER STATE RIVER BASINS. 166 STATIONS :- INFLOW 27 & STAGE 139 INDIA

FLOOD FORECASTING STATIONS INDIA GANGAB’PUTRAWEST FLOWING GODAVARIEASTERN RIVERS KRISHNAMAHANADIBARAK

FLOOD FORECASTING STATIONS INDIA BIHAR UP ASSAM W. B. APAP ORISSA GUJARAT M’RASHTRA KARNA TAKA MP D & NH HARYANA NCT DELHI 4 2 UTTAR ANCHAL JHARKHAND

FLOOD MANAGEMENT ACTIVITIES Pre flood During flood Post flood

FLOOD PLAIN ZONING  AN IMPORTANT NON-STRUCTURAL MEASURE.  REGULATES LAND USE IN FLOOD PLAINS TO RESTRICT DAMAGE BY FLOODS.  INVOLVES DEMARCATION OF ZONES IN FLOOD PLAINS COMPATIBLE WITH FLOOD RISKS INVOLVED.  AN IMPORTANT NON-STRUCTURAL MEASURE.  REGULATES LAND USE IN FLOOD PLAINS TO RESTRICT DAMAGE BY FLOODS.  INVOLVES DEMARCATION OF ZONES IN FLOOD PLAINS COMPATIBLE WITH FLOOD RISKS INVOLVED. CONCEPT

FLOOD PLAIN ZONING PRIORITY - I ACTIVITY LIMITED TO WATER LEVELS CORRESPONDING TO 100 YEARS FLOOD FREQUENCY AND DRAINAGE CONGESTION FOR 50 YEARS RAINFALL. PRIORITY - I ACTIVITY LIMITED TO WATER LEVELS CORRESPONDING TO 100 YEARS FLOOD FREQUENCY AND DRAINAGE CONGESTION FOR 50 YEARS RAINFALL. ZONE REGULATION

FLOOD PLAIN ZONING PRIORITY - II ACTIVITY LIMITED TO LEVELS CORRESPONDING TO 25 YEARS FLOOD FREQUENCY AND DRAINAGE CONGESTION FOR 10 YEARS RAINFALL FREQUENCY. PRIORITY - II ACTIVITY LIMITED TO LEVELS CORRESPONDING TO 25 YEARS FLOOD FREQUENCY AND DRAINAGE CONGESTION FOR 10 YEARS RAINFALL FREQUENCY. ZONE REGULATION

FLOOD PLAIN ZONING PRIORITY - III LESS ECONOMIC AND COMMUNITY ACTIVITY IN AREAS VULNERABLE TO FREQUENT FLOODS. PRIORITY - III LESS ECONOMIC AND COMMUNITY ACTIVITY IN AREAS VULNERABLE TO FREQUENT FLOODS. ZONE REGULATION

FLOOD MANAGEMENT FUTURE STRATEGIES  Focused Approach  Basin Wise Action Plan  Flood Plain Zoning  Role of Central Government  Funding of Planned Flood Management Works  Adequacy of Flood Cushion in Reservoirs

THANK YOU