EO10-PPO-020 OCR emcs...259 7/15/14 PARC/C. Traylor Crew Additional Activities Unattended EMCS Facility Cleanup Post Gravi-2 Ops EMCS-GASRMV MOD-RPL :20.

Slides:



Advertisements
Similar presentations
Copyright © 2011 by the Commonwealth of Pennsylvania. All Rights Reserved. Load Test Report.
Advertisements

ProCalc Nsg 132 Calculating ml per hour Example 1 An IV will be administered using an infusion pump that delivers ml/hr. D2.5W (2.5% Dextrose in Water)
Chapter 8 The Subsidiary Ledger System. Three Ledger System As a business grows so do the number of credit customers (debtors) and suppliers (creditors)
when calibrating the sprayer
Calculating Flow Rates Flow rate – Calculated from amount of fluid to be infused length of time for infusion – Expressed as milliliters per hour.
Operations Section.
Simon Bunn – Derceto Inc
Pump types and theory.
Asset Processing Property Control Website URL:
Hydraulics For The Long Term
Presentation Timer Select a time to count down from the clock above 60 min 45 min 30 min 20 min 15 min 10 min 5 min or less.
Presentation Timer Select a time to count down from the clock above 60 min 45 min 30 min 20 min 15 min 10 min 5 min or less.
NASA Bioculture System Capabilities Provides 10 individual cassettes containing hollow fiber bioreactors with media perfusion for a no shear cell culture.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
Printing Senior List Using the Zangle System By Heather Gruenthal, Western High School Make sure you have Zangle Front Office And IRIS Scanner Installed.
WBEA Passive Sampler Validation Study for NH3 and HNO3 Operation of the dual-channel Annular Denuder System (ADS)
Much engineering communication is interactive and interpersonal. You may use “we” in documents this semester. In the letter only, you may use “I.”
PIPE LINE SYSTEM Series Pipe Line System Class I Class II Class III
1 Based on PMI the Methodology. 2 This document has a sole propriety owner. © 2015 i-Clipse Technology, a Private Canadian Corporation. All rights reserved.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
OILGEAR PVV PUMPS PVV 200 Performance Curves.
Copyright © 2004 VMware, Inc. All rights reserved. Service Contracts Overview.
Copyright © 2004 VMware, Inc. All rights reserved. Utility Portal Overview.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. Example 1-Ad A.
SATMathVideos.Net Water is pumped into an tank at 20 gallons per minute. The tank has a length of 10 feet and a width of 5 feet. If the tank starts empty,
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama TIR Overview Charts August.
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
1 POIWG #38, July 2015 POIWG #38, July 2015 BIOTESC USOC, Switzerland Martin Haag & Jeannine Winkler BIOTESC
MSG Seal Replacement Mission Scenario Pre-Pack List (SOC OCR – ULF 1.1) MSG Front Window Exchange MSG Glove Rings & Feed- through Install MSG.
EMCS Facility Status Thomas Niedermaier. This document is the property of Astrium. It shall not be communicated to third parties without prior written.
EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures 1:15 BODYM-NODE2-VID R5 :15 1:25 Crew Unattended :30 P/L-RSTRCT VID-CNFG TEXTFlexible :05.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG #34 July 23, 2013 Tim Horvath Payload Ops Director
EMCS Inc 13 Operations Gary Moore EMCS Ops Lead (256)
EO10-PPO-118 parcall /2/15 PARC/M.Cash MOON IMAGERY 0:10 Crew Commanding Time Critical Unattended Additional Activities TEXT FLEXIBLE MOON-CAMERA-FOCUS.
Baseline Review 05/20/14 PARC/Martha Cash RapidScat EPF-SDX INSTALLATION-HEATERS ON ADAPTER and INSTRUMENT Crew Commanding Unattended Time Critical External.
Revision G 8/22/13 PARC/T. Cassady Pro K  FD15 (+/- 5 days), FD30 (+/- 14 days), FD60 (+/- 14 days), FD120 (+/- 14 days), and FD180/R-14 (+14/-0 days)
EO10-PPO-051 Revision T 9/25/15 PARC/T. Cassady HRF Rack 2 8PU Drawer Installation and Configuration 1:00 TEXTFlexible Crew  Sessions required as needed.
At the Ballarat City Gate Construction and Commissioning of a Shell and Tube Heat Exchanger Speaker: Godwin Wong.
GRAVI2 POIWG #34, July 24 th 2013 Abdul Basit Mohammad N-USOC-NOT-ABM-028, Abdul Basit Mohammad1.
PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSL-MICAST-EVAC CMD: 0/05:00 MSL-MICAST-HEAT1 CMD: 0/02:00 MSL-MICAST-HEAT2 CMD: 0/04:00 MSL-MCS212-EQUIL.
Revision A 12/19/12 PARC/T. Cassady Spinal Ultrasound SPINAL-S/W-REV_OPR SPINAL-CREW-CONF_OPR Operator Software Review and Crew Conference Ops before Spinal.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Date: March 3, 2011 Originator: Tricia Pittman/EO20.
EO10-PPO-056 Revision I 9/24/14 PARC/T. Cassady Portable PFS :20 BP Microphone Replacement TEXTFlexible Crew  Sessions required once every 18 months (within.
ESA Payload Operations Overview: MSL August 07, 2009 / POIC-MSFC.
SFU Samples Run (Sample Number) A (1) G1 Video C (1) B (2) C (2) B (3) C (3) B (4) C (4) B (5) C (5) B (6) C (6) B (7) C (7) BCAT-C1 Simon Fraser University.
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Ground Powerup 1 1.Scheduled by OCR. 16:00 GLACIER#-DNLK-CMD GLACIER#-HW-DRY GLACIER#-HW-PWR.
Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Platform-X Install & Activate.
PARC/D. Westbrook Revision B 10/23/13 SODI Procedure Review SODI-PROC-REVIEW :30 A Crew Additional Activities TEXT Flexible.
This document is the property of EADS SPACE. It shall not be communicated to third parties without prior written agreement.Its content shall not be disclosed.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Copyright © 2010 Delmar, Cengage Learning. ALL RIGHTS RESERVED. Chapter 16 IV Flow Rate Calculation.
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
POD Team PARC/M. Barnett EO10-PPO-079 Revision F 8/10/15 Payload Crew Conference :30 PAYLOAD-CREW-CONF (at least twice per increment, monthly preferred)
MOL Mission Operations Laboratory MOL Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Increment 12 On-Orbit Operations.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory ISS Ham Planning Operations.
Revision E 12/19/12 PARC/E. Litkenhous JAXA-SDRM WGVOPN-PLC PRO-SDRM ACT-CMD 1:00 SpaceDRUMS Experiment Operations SDRM-EXP-POWER UP Nominal Operations.
Troubleshooting Hydraulic Pumps
SB Packing Automatic Downpuller Power Unit
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
Standard Approach for Setting Up a Kaizen Event
Adding and Subtracting Decimals
Process for Approving/Advertising Posts SEFS
Forms.
Chapter 08.
© 2015 Elsevier, Inc. All rights reserved.
© 2015 Elsevier, Inc. All rights reserved.
Presentation transcript:

EO10-PPO-020 OCR emcs /15/14 PARC/C. Traylor Crew Additional Activities Unattended EMCS Facility Cleanup Post Gravi-2 Ops EMCS-GASRMV MOD-RPL :20 1:00 EMCS-1 RBLSS MOD-RPL EMCS Facility Cleanup after Gravi-2 EMCS- HS- VIDEO EMCS-POWER DOWN-CMD 1:00 :15 EMCS-3 TUBE-INSTL :15 1:00 :15 PRO-EMCS ACT-CMD EMCS-POWER UP-CMD EMCS-PL- PWR/DNLK PRO-EMCS DACT-CMD Any Time COMMS- VCA1-DL NASA (ESA) COMMS- VCA1-DL NASA (ESA) COMMS- VCA1-MON NASA (ESA) COMMS- VCA1- MON NASA (ESA)

EO10-PPO-020 OCR emcs /15/14 PARC/C. Traylor Change#RevisionIncDateCrew Roll- up* (hrs) PTP (hrs) Crew Roll-up Notes EO10-PPO Revision D35/36 & Subs 12/19/12Nominal: 0.25 Reserve: 0 Inc 35/36 Working PTP 10/24/12 Nominal: 0 Reserve: 0 Crew time is for Facility Cleanup following Seedling Growth experiment runs. Includes only the TCS Sponge Replace activity. EMCS has indicated that no Volume Compensator Alignment activity is needed during Inc 35/36. EO10-PPO Revision E37/38 & Subs 6/13/13Nominal: 2.58 Reserve: 0 Inc 37/38 Working PTP 04/29/13 Nominal: 3.08 Reserve: 0 Crew time is for Facility Cleanup following Gravi2 experiment runs and EMCS Water Pump Tube Installation activities. EO10-PPO Revision F39/40 & Subs 12/12/13Nominal:.25 Reserve: 3.42 Inc 39/40 Working PTP 10/18/13 Nominal: 0.17 Reserve: 1.50 Reserve crew time is for activities Water Reservoir Replace (40 min), RBLSS Module Replace (2 hr), and EMCS Water Pump Tube Install (45 min) following three Seedling Growth-2 experiment runs. TCS Sponge Replace (15 min) is counted towards nominal crew time. Note: These activities will be performed just prior to Seedling Growth-3, which is not in Inc 39/40, therefore an OCR is required to perform any of these activities during Inc 39/40. OCR ocpc OCR39/40 & Subs 6/9/14Changed EMCS Relief Valve Check to a 5 minute, Execution Note Only activity. OCR emcs OCR39/40 & Subs 6/10/14Changed power tracking activity to be scheduled between PRO-EMCS ACT-CMD and PRO-EMCS DACT-CMD. EMCS PPO Change Log *Crew Roll-up is not maintained real-time.

EO10-PPO-020 OCR emcs /15/14 PARC/C. Traylor Change#RevisionIncDateCrew Roll- up* (hrs) PTP (hrs) Notes EO10-PPO Revision G39/40 & Subs 6/25/14Added PPO document number. OCR emcs...259OCR39/40 & Subs 7/15/14Changed Post Gravi-2 EMCS Facility Cleanup from what was baselined during Inc 37/38. Added new activity for replacing only one EMCS RBLSS Module and then added new activity for replacing the water pump tubes on that new RBLSS Module just replaced. EMCS PPO Change Log *Crew Roll-up is not maintained real-time.