Feb. 20, 2004STAR Collaboration - Cal Tech1 Production and Quality Assurance Issues for 2004 Data STAR Collaboration Meeting Cal Tech, February 16-20,

Slides:



Advertisements
Similar presentations
Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT Tasks/Responsibilities/Manpow er issues. 1.
Advertisements

“L3” Jeff Landgraf. In July, Hank sent me a message asking if I had any talks for this meeting. “No, but I have some issues that could be discussed.”
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
CMS Alignment and Calibration Yuriy Pakhotin on behalf of CMS Collaboration.
X.Dong, USTC/LBNL Feb. 20th, 04, STAR Collaboration Meeting 1 TOF Software Progress Xin Dong, for TOF Group  TOF detectors in Run IV  Online software.
STAR Collaboration Meeting, Nantes, July2002 SVT Analysis/Status Update Jun Takahashi – University of Sao Paulo.
Offline Trigger Software Update Akio Ogawa STAR Collaboration Meeting 2003 Feb 28 BNL.
28 February, 2003 STAR Collaboration meeting Status of the dE/dx calibration Yuri Fisyak.
7/19/2004FTPC Review - J. Seyboth1 FTPC Review - Software Janet Seyboth for the FTPC group DAQ Online Calibration Databases Offline Documentation FTPC.
FTPC calibration status Joern Putschke for the STAR FTPC group STAR Analysis Meeting 2002 October 22-24, 2002.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
1 TPC online  offline calibration November 2002.
5. Data Manager 1. Introduction 2. Data Manager Duties 3. Quality Checking 4. Problem Reporting 5. Data Monitoring 6. Histogram Presenter 7. Trend Presenter.
Offline Tracker DQM Shift Tutorial. 29/19/20152 Tracker Shifts Overview Online Shifts at P5 (3/day for 24 hours coverage) – One Pixel shifter and one.
Online and offline software overview, status and plans Status and Integration to STAR : Trigger DAQ Monitoring Slow Controls Online Databases Online/Offline/MC.
H. MatisTracking Upgrade Review – Dec. 7, SSD Update Howard Matis.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Some notes on ezTree and EMC data in MuDst Marco van Leeuwen, LBNL.
Geant4 Acceptance Suite for Key Observables CHEP06, T.I.F.R. Mumbai, February 2006 J. Apostolakis, I. MacLaren, J. Apostolakis, I. MacLaren, P. Mendez.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
STAR Strangeness production and Cronin effect in d+Au collisions at √s NN = 200 GeV in STAR For the STAR Collaboration Xianglei Zhu (Tsinghua U / UCLA)
OFFLINE TRIGGER MONITORING TDAQ Training 5 th November 2010 Ricardo Gonçalo On behalf of the Trigger Offline Monitoring Experts team.
CMS pixel data quality monitoring Petra Merkel, Purdue University For the CMS Pixel DQM Group Vertex 2008, Sweden.
STAR Collaboration Meeting, BNL, Feb 2005 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software update L3 display 200 GeV February.
Y.Fisyak, BNL - STAR Upgrade workshop, 12/2/ Integrated Tracker – STAR tracking framework of the future update on  status and  perspective IT(TF)
Infrastructure for QA and automatic trending F. Bellini, M. Germain ALICE Offline Week, 19 th November 2014.
Analysis trains – Status & experience from operation Mihaela Gheata.
February 28, 2003Eric Hjort PDSF Status and Overview Eric Hjort, LBNL STAR Collaboration Meeting February 28, 2003.
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
STAR Operations Workshop 2007 H. Matis1 SSD Operations August 20, 2007 H. Matis for the SSD group.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Normal text - click to edit HLT tracking in TPC Off-line week Gaute Øvrebekk.
STAR TPC Cluster and Hit Finder Software Raimond Snellings.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
STAR J/  Trigger in dA Manuel Calderon for the Heavy-Flavor Group Trigger Workshop at BNL October 21, 2002.
Online Monitoring System at KLOE Alessandra Doria INFN - Napoli for the KLOE collaboration CHEP 2000 Padova, 7-11 February 2000 NAPOLI.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
E-EMC developments and plan Jan Balewski IUCF, Indiana Detector status Run 3 goals Calibration Software status STAR Analysis Meeting BNL, October
H. MatisSTAR Inner Silicon Tracking Detector Review – July 8, SSD software and hardware maintainability Howard Matis.
FTPC calibration status & plans for Y03 Joern Putschke for the STAR FTPC group STAR Calibration Meeting 2002 November 7, 2002.
TOFp Status Report Introduction: system overview Functional requirements Analysis status –track extrapolation & matching –start time –stop time –identified.
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
David Silvermyr Lund University for the PHENIX Collaboration Early global event results using the PHENIX Pad Chambers at RHIC.
STAR Year 2001 Data and Analysis RHIC performance STAR Trigger Recorded Event Statistics Offline Production pp Running Summary/Outlook Thomas Ullrich,
Sti primary track puzzle Yuri Fisyak. Charge dependent relative difference in primary track transverse momentum between Sti (.dev) and TpT On STAR collaboration.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
AliRoot survey: Reconstruction P.Hristov 11/06/2013.
STAR Summary for 2012 pp running May 11, 2012 Bill Christie, BNL Outline Summary of 200 GeV pp run Summary of 510 GeV pp run STAR’s running efficiency.
AliRoot survey: Calibration P.Hristov 11/06/2013.
LIT participation LIT participation Ivanov V.V. Laboratory of Information Technologies Meeting on proposal of the setup preparation for external beams.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
1 GlueX Software Oct. 21, 2004 D. Lawrence, JLab.
Analysis Meeting, November 9-11, 2003 Manuel Calderón de la Barca Sánchez Heavy Flavor Working Group Heavy Flavor in ‘04: Prospects for J/ . Heavy.
David Lange Lawrence Livermore National Laboratory
Year 3 Reconstruction and Calibration Status David Hardtke LBNL 1.What’s new? 2.Status of Calibrations 3.Why we need ITTF.
Calibration: preparation for pa
TPC status report Marian Ivanov.
Beam Gas Vertex – Beam monitor
Shift instructions August 16, 2017 Antoni Aduszkiewicz
Commissioning of the ALICE HLT, TPC and PHOS systems
HLT & Calibration.
Overview of CLAS12 Calibration
STAR Geometry and Detectors
CMS Pixel Data Quality Monitoring
Current Status of the VTX analysis
Presentation transcript:

Feb. 20, 2004STAR Collaboration - Cal Tech1 Production and Quality Assurance Issues for 2004 Data STAR Collaboration Meeting Cal Tech, February 16-20, 2004 Lanny Ray University of Texas at Austin For the STAR QA Team

Feb. 20, 2004STAR Collaboration - Cal Tech2 Purpose and Goals of QA Validate data and software through DST level. Identify gross problems with the detector, calibrations, software, and/or production, i.e. is everything on that should be? Determine if the reconstructed events look reasonable given the detector configuration and trigger conditions. Rapid reporting to minimize wasted beam time or production cpu cycles. Notify experts when problems are suspected and follow- up on problem resolution. Help the experiment and DST production run efficiently. Help codes and calibrations converge more rapidly.

Feb. 20, 2004STAR Collaboration - Cal Tech3 QA Infrastructure for 2004 Original QA web based system pioneered by Peter Jacobs, Gene van Buren, Bum Choi, Curtis Lansdell, Ben Norman (circa 2000). Peter handed off to LR and the students all graduated. Herb Ward joined the effort in 2002 and rewrote the infrastructure in the same web based format he has developed over the past 10 years for undergraduate homework and testing service, currently in use at 100s of Universities. The QA team now consists of LR, Gene van Buren, Herb Ward and Jerome Lauret.

Feb. 20, 2004STAR Collaboration - Cal Tech4 QA Infrastructure for 2004 The QA system displays histograms for: 1. Fast offline 2. Real data production 3. Nightly Monte Carlo tests of dev library The user may select from three histogram sets: 1. Regular QA histogram set (25 pages, 150 plots) 2. Full QA histogram set (almost 100 pages!) 3. TPC sectors – one sector per page For the multi-trigger runs just started, the QA system will automatically present multiple histograms for: 1. General run/sequence summary information 2. Minbias trigger 3. Central trigger 4. High (EMC) tower trigger The QA reports are automatically linked to the Online Runlog page for the specific experiment run number and are listed in shiftreport-hn Additional QA discussion and information available in starqa-hn

Feb. 20, 2004STAR Collaboration - Cal Tech5 Expanded Role for Offline QA in Run 4 This year there are no shift crew members assigned specifically to fast offline QA like we had in Runs 1, 2 and 3. Of course they can still check the data using the QA system as before. As a result this task now falls mainly upon the offline QA shift crew – which has one person per day only. This presents a challenge for us to stay up with the data and provide quick feedback to shift leaders & crew. When first pass DST production starts, QA shift crew will have to prioritize their work; we cannot cover all QA tasks for both fast- offline and offline DST production. Due to time and personnel limitations QA can only identify gross problems - subtle problems must either be detected by online monitoring in the control room or in later physics analysis.

Feb. 20, 2004STAR Collaboration - Cal Tech6 Quantities examined by QA Distribution of space points, energy clusters Distribution of global tracks, primary tracks and track quality parameters Location of primary vertices Distribution of secondary vertices Number of Xi’s and kink candidates Distributions are in 3D, either as 1D histograms or 2D scatter plots.

Feb. 20, 2004STAR Collaboration - Cal Tech7 Detectors in QA What’s in: TPC SVT FTPC East and West BEMC BSMD  and , BBC East & West, Large & Small What’s not in: RICH EEMC ESMD FPD (plots included but are not filled for Au+Au) PMD TOFr, TOFp

Feb. 20, 2004STAR Collaboration - Cal Tech8 Documentation available for QA shift crew QA Overview Instructions for QA shift duties Quick-Start step-by-step instructions for use of web based QA pages QA daily shift report form and instructions Example histograms and explanation (needs updating, I know) Contacts

Feb. 20, 2004STAR Collaboration - Cal Tech9 Examples of problems detected: ADC noise at ends of TPC time sequences: Excess fraction of broken, primary tracks (due to RDO-20 outage): starting space points Z (cm) Long tracks, but few space points

Feb. 20, 2004STAR Collaboration - Cal Tech10 TPC drift speed, t0 calibration error: Misalignment of upper/lower set of bands each band corresponds to one collision vertex tanl z-coordinate of global track extrapolation to beam axis z of first TPC point on globtrk West TPC tracks East TPC tracks

Feb. 20, 2004STAR Collaboration - Cal Tech11 Examples, continued Relative number of reconstructed events: magnetic field DB error, TPC drift speed or t0 gross error FTPC build up of noise & dead channels SVT intermittent noise Background contamination tracks in d+Au run. Intermittent TPC RDO/FEE outages and noise Intermittent BEMC & BSMD hot towers/wires & dead channels Primary vertex z-distribution with respect to ZDC timing selection dE/dx calibration errors Primary vertex transverse position errors: vertex finder coding bug V0 azimuthal distribution anomaly: TPC distortion corrections. Absence of V0, Xi finders in bfc – at least QA crew could have caught this had they been in place for post- experiment production.

Feb. 20, 2004STAR Collaboration - Cal Tech12 QA System Performance Last year QA was down periodically due to temporary method used to check data base for new jobs – problem corrected prior to run 4 using stable unix daemon. This year disk space limitations often stop fast offline production runs which kills QA. In general QA is vulnerable to problems in AFS, NFS, RCF – which STAR cannot control. Nevertheless, QA is up and running the majority of the time but it could be better. But something seems to cause trouble every week.

Feb. 20, 2004STAR Collaboration - Cal Tech13 Production Policy - QA New offline production policy document: Qualitative increase in STAR event rate coupled with RCF’s finite capacity means multiple, complete production passes are not possible anymore. Careful QA, early in the process is essential to success. DST production is likely to be done after the experiment run and after QA shifts end. What to do about it? See above proposal – QA team with “volunteer” members from each detector group and PWG will be expected to check preliminary production data during two weeks prior to full-scale production and must either complain or sign-off during this time or kiss their re-run options good-bye.