N-TOF review HVAC and cooling systems Proposal to be validated by the project CERN TS/CV 13th February 2008.

Slides:



Advertisements
Similar presentations
Heating, Ventilating, and Air-Conditioning
Advertisements

HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
Stem Challenge Energy management systems, CHP, Harvester tank, green roofs and underfloor heating. 1.
Heat Recovery for Commercial Buildings
PLANT HVAC SYSTEMS DU-109-PP PLANT HVAC SYSTEMS.
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Announcement Course Exam October 6 th (Thursday) In class: 90 minutes long Examples are posted on the course website.
1 HVAC OVERVIEW and VALUE ENGINEERING ITEMS August 13, 2008 CLIC Working Group CES Lee Hammond, Fermilab.
Value Engineering Session Air Treatment / HVAC November 27, 2007 Lee Hammond, FNAL CFS.
First Considerations on CLIC Cooling System Ch. Martel, J. Inigo-Golfin TS/CV.
HEAT EXCHANGER.
Important variables Water: Air: Conversion:
1 MCC PRESENTATION - GMP MANUFACTURING ENVIRONMENTS Presented by : Deryck Smith Consulting Engineers Module 2.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
World Health Organization
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
World Health Organization
HOW THE DUMP RESISTOR’S TANK LOOKS LIKE COOLING OF THE LHC ENERGY EXTRACTION RESISTORS G. Peón (ST/CV), K. Dahlerup-Petersen, G. Coelingh (AT/MEL) Air.
Cooling Loads. Critical System P&ID Critical system Main issues Oversized chillers Issues with switch over By-pass valve AHU5A/B? Looking at the T and.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
General RP guidelines for CENF CENF secondary beam study group H. Vincke07/05/
N-TOF review HVAC and cooling systems YB-JIG 15/06/07.
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
Cooling and Ventilation Activities M. Battistin – EN/CV/PJ IEFC Workshop th March 2012 « CONSOLIDATION and UPGRADE PLANS for the INJECTOR COMPLEX.
Thursday 6 th May 2004 C. Martel – Cooling Ventilation - CERN TS/CV TS/CV/BE COOLING VENTILATION TECHNICAL DESIGN OFFICE TS Workshop Archamps 2004.
Associated detection/extinction systems D. Swoboda.
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.
Roof Top Unit Overview (MAGNUM) Visit us at Revision- 12/17/2015.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
Announcement Course Exam November 3rd In class: 90 minutes long Examples will be posted on the course website.
Engineering Department EN 1 IT3853-EN Design, Supply of Ventilation Units and Smoke Extraction Systems for Building 192 Bidder’s conference – 29 th April.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL CERN TS/CV Wednesday 9 th July 2008 CLIC.
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
ESKOM - MWP NEW ENERGY CENTRE Mechanical Installation 16 April 2014.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
HIE-ISOLDE Workshop: The Technical Aspects Target Area Infrastructure Ventilation 29 November 2013 Andrea Polato* - CERN EN-CV-PJ * The research project.
Lecture Objectives: Review Psychrometrics Introduce Air Handling Unit
CFS EDR KICK OFF MEETING Air Treatment August 23, 2007 Lee Hammond, FNAL CFS.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
Update on the PSB Cooling and Ventilation Systems
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Demineralised water cooling system
EN-CV activities for LHC during LS2
The Data Center Challenge
Lecture Objectives: Discuss Final Project
CERN Data Centre ‘Building 513 on the Meyrin Site’
Heating, Ventilating, and Air Conditioning
Heating Ventilating and Air Conditioning
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Cooling systems for HL-LHC (WP17.3)
CEDAR Detector Ventilation System Review
COOLING & VENTILATION INFRASTRUCTURE
Lecture Objectives: Answer questions related to HW 4
RESIDENTIAL PLUMBING SYSTEMS (WATER SUPPLY)
East Area Cooling & Ventilation Status
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Heating, Ventilating, and Air-Conditioning
Lecture Objectives: Review Psychrometrics Introduce Air Handling Unit
Lecture Objectives: Discuss HW4 parts
Presentation transcript:

n-TOF review HVAC and cooling systems Proposal to be validated by the project CERN TS/CV 13th February 2008

HVAC system

HVAC system proposal Principle Volume treated between doors 202 and 203 (~ 1000 m3) AHU1, filtration (1 Vol/h) to allow RP measure activity, 100 % recycled air AHU2, extraction AHU (5 Vol/h) for air purge before access No pressure control AHUs located in bldg. 375 Air Handling Units Tightness class B or better ( EN 1886: 0.44 l/s/m2 at -400 Pa, 0.63 l/s/m2 at +700 Pa ) Filtration AHU1 with: isolation dampers (NF) absolute filters ( F9-H12 ) fire dampers at the through-wall passages Extraction AHU2 with: to be designed following RP calculations of contaminants dispersion By-pass of the extraction AHU for cold smokes extraction Fresh air intake by (manual) damper on door 202 fire dampers at the through-wall passage Ducts: class B Eurovent 2/2 and SS welded pipe inside bldg. 375

HVAC Schematic

HVAC system Other works not part of TS-CV responsibility Civil engineering works (drillings) Powering of AHUs Tightness of doors (important for performance of system) Fire dampers controlled by fire detection system Operating modes To be determined Extraction mode be operated (manually) by RP operators or CCC Smoke extraction policy to be defined

Water cooling system

Present system left unused on site until final decommissioning of n-TOF Proposal closed circuit demineralised water with Primary cooling provided by 10 kW air-cooled chiller at 16°C Secondary circuit demineralised water, (1+1) SS hermetic pumps, ~ 10 m3/h, 18°C, max 2 bar Welded plate heat exchanger 50 μm SS filter Cationic resins demineralisation cartridge Cooling plant in containment tank, with anti-projection cabin water piping double wall Conductivity measure O2 measure Deoxygenating system Propose rack-hood extraction system for O2 gas (analysis by RP?) Water samples possible No automatic top-up of demineralised water

Water cooling schematic

Water cooling system Waste disposal Regeneration of the cationic cartridges not possible at CERN Project to handle waste Project to provide cartridges (outside CERN standard) Periodic circuit drain water treatable at new waste treatment plant Project to provide Schutz type containers for drained water transport

Water cooling system Other works not part of TS-CV responsibility Civil engineering works (drillings) Power supply Degasing system to be specified by project O2 measurement to be specified by project

Schedule Tasks (in parallel) Duration (tendering + works) Ventilation proposal15 weeks Water cooling proposal23 weeks Confirmation needed Asap to start purchasing procedures