PXD EVO 23.3.2010 Hans-Günther Moser MPI für Physik Meeting on Services and Power Supplies Aim: define the services chain form module to external racks.

Slides:



Advertisements
Similar presentations
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Advertisements

1 Integration issues of FPCCD VTX Yasuhiro Sugimoto May 22,
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
EMC review for Belle II (Grounding & shielding plans) Sub-systems ( XXXXX)
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
SODA: Synchronization Of Data Acquisition I.Konorov  Requirements  Architecture  System components  Performance  Conclusions and outlook PANDA FE-DAQ.
7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
SuperKEKB 3nd open meeting, July Hans-Günther Moser MPI für Physik PXD Summary Other talks in software, SVD and DAQ sessions.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
SuperKEKB 2nd open meeting March 17-19, 2009 Hans-Günther Moser MPI für Physik PXD Session SOI: more information: see TIPP09 -> submission in February,
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
BKLM RPC Signal & Ground Schematic Gerard Visser, Indiana University (for the barrel KLM team) 10th B2GM, 11/2011 magnet structure GND 7mm FOAM 3mm GLASS.
Grounding Guidelines Developed for LBNE
SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 1 CFSS and ES electrical screening for SPD Harness RB24-RB26 Electrical.
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
Compilation of Dis-/Advantages of DC-DC Conversion Schemes Power Task Force Meeting December 16 th, 2008 Katja Klein 1. Physikalisches Institut B RWTH.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Sensor and ASIC R&D Sensor Prototype Production: running, ASICs: Switcher,
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario.
1 Single event upset test of the voltage limiter for the ATLAS Semiconductor tracker TSL Experiment Number: F151 distance between power supplies and modules.
SVD DAQ and Overall DAQ for DESY Telescope Test Takeo Higuchi (KEK) Sep. 26 th, 2012The 2 nd PXD/SVD Joint Meeting I have a serious problem in the Internet.
PXD – DEPFET PS noise emission tests Mateo Iglesias Fernando Arteche.
EMC issues for cabling and racks layout design. (Belle II – Grounding) F.Arteche.
Hybrid Boards for PXD6 5th International Workshop on DEPFET Detectors and Applications Sept Oct Christian Koffmane 1,2 1 Max-Planck-Institut.
Status of the SVD DAQ Koji Hara (KEK) 2012/1/16 TRG/DAQ meeting1.
H.-G. Moser Max-Planck-Institut für Physik 2nd DEPFET workshop 3-6 May 2009 Open Issues Readout cycle: 10 µs or 20 µs ? Advantages of 20 µs: - smaller.
SVD Cables & Pipes Markus Friedl (HEPHY Vienna) B2GM, 24 July 2012.
DHH Status Igor Konorov TUM, Physics Department, E18 PXD DAQ workshop Münzenberg –June 9-10, 2011.
F. Arteche EMC: Electronics system integration for HEP experiments (Grounding & Shielding)
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Power Supply for DEPFET in SuperBelle Pablo Vazquez IGFAE-USC Henryk Palka INP-KRA.
H.-G. Moser Max-Planck-Institut für Physik PXD EVO 21/10/ Barcelona Summary Thanks to our hosts for UB for a great meeting!
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
Preparations on DEPFET gate-mode Operation with Hybrid 4.1.x 17. April Christian Koffmane 1,2 for HLL team 1 Max-Planck-Institut für Physik, München.
DHH at DESY Test Beam 2016 Igor Konorov TUM Physics Department E18 19-th DEPFET workshop May Kloster Seeon Overview: DHH system overview DHE/DHC.
DHH progress report Igor Konorov TUM, Physics Department, E18 DEPFET workshop, Bonn February 7-9, 2011 Outline:  Implementation synchronous clock distribution.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
EMC review for Belle II (Grounding & shielding plans) PXD system - July 2012 Dr. Fernando Arteche.
8 September 2011 Belle II SVD/PXD Installation Procedure Mockup Meeting Munich Immanuel Gfall (HEPHY Vienna)
De Remigis The test has been accomplished with an SLVS signal, since that was chosen for the serial communication between the readout and the optical converter.
The Data Handling Hybrid
Latest results of EMCM tests / measurements
ETD PID meeting We had many presentations dedicated to the PM test .
RPC with strip readout Last results from test of timing glass
Markus Friedl (HEPHY Vienna)
KEK IR status S.Tanaka KEK.
Preliminary thoughts on SVT services
Update of MVD services and requests
B2GM Sessions PXD I: Wednesday, June 6, 16:50-20:20
KEK news ( ) S.Tanaka.
POWER SUPPLY FOR BELLE II PIXEL DETECTOR
The Data Handling Hybrid
Cooling pipes and Space for Services
DHH progress report Igor Konorov TUM, Physics Department, E18
Data Handling Hybrid (DHH) Universität Göttingen
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
Meeting on Services and Power Supplies
Development of the Data Handling Processor DHP
SIT AND FTD DESIGN FOR ILD
Presentation transcript:

PXD EVO Hans-Günther Moser MPI für Physik Meeting on Services and Power Supplies Aim: define the services chain form module to external racks

PXD EVO Hans-Günther Moser MPI für Physik IR Service routing PXD cabling route is independent with SVD Readout Cable and cooling pipe are sitting between shields. ~500mm from IP 16*16*3.14=804cm 2 Patch Panel

PXD EVO Hans-Günther Moser MPI für Physik Electronics inside lead box of QC2RP upperstream G.Varner Test of FPGA and opt. link at Belle outised IP

PXD EVO Hans-Günther Moser MPI für Physik Kapton Link (Hans Krüger) Length limited due to high frequency signal transmission (clock, IO) Simulations started Prototypes ordered: Recommendations: increase copper thickness to maximum (35µm) to reduce voltage drop in power lines Work on impedance matching to TWP/coax Could increase driving capacity of DHP (not the dominant power source)

PXD EVO Hans-Günther Moser MPI für Physik DHH design to DAQ to DHH Controller TU Munich (Igor Konorov): DHH proposal based on SODA (for PANDA) New: optical transmission of clock signals (low jitter) Schedule 1.Requirements and specification Prototype development Test, debugging, final specification Final prototype Final production Ramon Llull (Barcelona) interested to work on opto components Radiation ?

PXD EVO Hans-Günther Moser MPI für Physik Low Voltage Supplies »DHH about 2m away, only location for regulators »Which voltages to regulated locally ? »Overvoltage protection »Possible regulator RHFL491A (15W, 3mm², 15 CHF/piece) »Availability? »Alternatives? »Power supply tests and need for overvoltage protection will be studied by »Kracow (Henryk Palka) and LMU Munich (Jochen Schieck)

PXD EVO Hans-Günther Moser MPI für Physik Grounding (Fernado Arteche) Solid local ground (beam pipe?) Mutipoint HF ground connections Be aware: there is no such a thing as a ground free PS

PXD EVO Hans-Günther Moser MPI für Physik PS and grounding Pablo Vazques Connection to SVD by cooling circuit?

PXD EVO Hans-Günther Moser MPI für Physik Services Chain Module (1/2) DHH Location Docks Clock generation Opto transmission Power Supply ATCA Trigger Kapton link ~ cm Patch panel (inside shield) Impedance matching Overvoltage protection Thin cable (power) O(2m) Twisted pair/coax (HF) O(2m) Thick power cables d=20mm, l=30m Fibres l=30m Regulation? Radiation level?

PXD EVO Hans-Günther Moser MPI für Physik Tasks/Actions 1)Test HF properties of Kapton + impedance matching (Bonn) 2)Design prototype patch panel (Bonn?) 3)Test need of regulation and overvoltage protection (LMU, Kracow) 4)Ground connection to beam pipe (KEK) 5)Need of shielding between SVD/PXD (discuss during B2GM) 6)Irradiation tests of SODA/DHH components (TU) 7)Grounding studies and PS prototype (Santiago de Compostella) DHH -> TU Munich (with help of Ramon Llull)