MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
Advertisements

GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
STEREO IMPACT Preliminary Design Review 2001-September 11,12 David Curtis1 IMPACT Project Overview.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
STEREO IMPACT CESR Claude Aoustin CESR meeting - Maven MAVEN meeting – Feb 3-4, 2010 Prepared by : C. Aoustin CESR – Centre d’Etude Spatiale.
From Research Prototype to Production
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
1 PFP MSR, 11/17/2009 Particles and Fields Package Monthly Status Review (MSR) November 17, 2009 Dave Curtis, PFP PM.
- Recommendations status - PRR Review report: actions - Conclusion EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris Status.
25-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : SMA Jorg Fischer, MAM Mars Atmosphere and Volatile.
THEMIS TIMPURGE- 1 UCB, JUNE 16, 2005 THEMIS INSTRUMENT NITROGEN PURGE.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
THEMIS FGM CDR Peer ReviewBerlin, April 6, 2004 THEMIS FGM Engineering Peer Review SC Integration and Test Ellen Taylor University of California - Berkeley.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
Presented by A.B. Galvin STEREO SWG NOAA Boulder, Co 22 March 2004 PLASTIC Activities.
24-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : ATLO Support Dave Curtis Mars Atmosphere and Volatile.
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/ SPIRE & PACS SORPTION COOLERS.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Critical Design Review May , 2011 Integration and Test Dave Curtis PFP Package Manager Mars.
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.
ASPERA-3 Mar. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/00 Schedule statused.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration and Test 2011 March 29 Dave Mitchell.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Failures encoutered during build and test of Swea sensor instrument MAVEN-Swea sensor pre-shipping review - December 1-2/
STEREO IMPACT CESR Claude Aoustin 2002 – Nov – 20/22 CDR - 1 STEREO IMPACT CRITICAL DESIGN REVIEW SWEA (CESR PART) 2002 November 20/22 Prepared by : C.
ESS WP 12 Project Management & Capabilities Overview Neil Bliss Projects & Mechanical Engineering Group Leader ESS PDR, Lund, 10 th November 2015.
SWEA Planetary Protection SWEA Peer Review March 28-29, 2010 IRAP, Toulouse.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review Requirements Definition Peter R. Harvey May 12, 2010.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
4-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Verification Dave Curtis, PFP Package Manager.
March 28, 2011 MAVEN SWEA instrument Pre-CDR Peer IRAP March 28-29, IRAP Management MAVEN SWEA Instrument Pre-CDR Peer Review IRAP, March.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
1 MAVEN PFP ICDR May 23-25, 2011 Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission Solar Wind Electron Analyzer (SWEA) Critical Design Review May.
20-1 MAVEN iPSR Oct 30-31, 2012 Particles and Fields Package Pre-Ship Review October 30-31, PFDPU D. Gordon, W. Donakowski & PFDPU Team Mars.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review SWEA David L. Mitchell Paul Turin Ellen Taylor (with.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
SWEA Product Assurance SWEA Peer Review March 28-29, 2011 IRAP, Toulouse.
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
SWEA sensor FM model work remaining before delivery
Bill Raynor Naval Research Lab
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
Dave McComas on behalf of the ISʘIS Team
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
THEMIS Mission Assurance
Solar Probe Plus FIELDS V5 Mechanical Pre-Ship Review April 10, 2017
ISUAL Product Assurance
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
PHI Status Report SO Cleanliness Working Group #24
Peer Review Agenda (Suggested).
GLAST Large Area Telescope:
BRIAN KLATT MISSION ASSURANCE MANAGER
Integration and Test Organization Chart
GLAST Large Area Telescope
Integration and Test Organization Chart
Introduction and Overview
Presentation transcript:

MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness & contamination issues AIT flow chart Schedule Procurements & work in progress Next activities Conclusion 13 juin MAVEN-SWEA instrument peer review / CESR

AIT: Staff 13 juin MAVEN-SWEA instrument peer review / CESR  Mechanics: J Rouzaud (G Peyre – Comat)  Integration, coatings, gluing, HV optocouplers : E Lecomte  Electronics, boards integration & tests: JJ Thocaven, P Rouger  Calibrations: A Fedorov, P Rouger, C Mazelle  Procedures, anomalies, QA: D Moirin (BTS)  Harnesses, boards assembling: Microtec  Environmental tests : P Rouger + Microtec

Facilities 13 juin MAVEN-SWEA instrument peer review / CESR  Class 1000 clean room for MCPs and detector assembly (CESR)  Class clean room for electronics and mechanics assemblies (available early may 2010) (CESR)  Small clean room for electronics gluing and coating (CESR)  Vacuum chamber and particles beam in class clean room (see A. Fedorov presentation)  Thermal chambers (-60°C to +120°C) – CESR  Class clean rooms available in sub contractors premices (Comat, Microtec)  EMC test facility: in Microtec (sub contractor)

Main sub contractors 13 juin MAVEN-SWEA instrument peer review / CESR  COMAT AerospaceMech. Fabrication & integrationsame as for STEREO (Toulouse)Tools for assemblysame staff as for STEREO Assembly docs (procedures, as_built, control reports, QA,…)  CORIMA (Loriol-FR)Entrance grids fab & gold treatment same as for STEREO  Collini & Fluhmann(Swi)Black copper same as for STEREO  SWIPELEC (Bordeaux-FR)MCP grids same as for STEREO  HIREX (Toulouse)EEE parts screening same as for STEREO EEE parts procurement(Tecnologica group)  CIRETEC (Toulouse)PCB fabricationCNES/ ESA qualified  MICROTEC (Toulouse) Parts & PCB welding, same as for STEREO Harnesses  Mecano-ID (Toulouse)Environmental tests

Reference documents 13 juin MAVEN-SWEA instrument peer review / CESR  STEREO SWEA Performance Assurance Plan  STEREO SWEA UCB to CESR Interface Control Document  MAVEN PFP performance requirement  MAVEN PFDPU to instruments ICD  MAVEN – UCB Mission Assurance Implementation Plan (MAIP)  Maven harness specifications  Maven grounding specifications  Maven latchup LET criteria (tech. Note - UCB)

AIT documentation 13 juin MAVEN-SWEA instrument peer review / CESR As built lists (materials, EEE parts, processes) As built assembling procedures Environmental testing reports (if any) Log book Non conformity reports with appropriates corrective actions Photographic documentation of FM hardware Analysis reports (mechanical, electrical, …) Tests reports

Cleanliness and contamination issues (1) 13 juin MAVEN-SWEA instrument peer review / CESR  Microchannel plate cleanliness requirements (same as for Stereo) Sensitivity to humidity, dust & hydrocarbons Discharge created by 100 microns particles can damage MCPs Outgassing near MCP to be avoided Special procedure to clean MCPs and restore properties  Permanent purging system installed on Swea with dry nitrogen at 5 liters/ hour Plastic hermetic container filled with dry nitrogen acceptable for transportation (couple of hours) few hours without purge flow is possble in clean room environment MCPs or sensor equiped with MCPs is stored in vacuum at CESR  Hermetic red tag cover on Swea analyser can be removed only in a class 1000 clean room and has to be kept on Swea analyser during I&T

Cleanliness and contamination issues (2) 13 juin MAVEN-SWEA instrument peer review / CESR  All mechanical parts are cleaned with alcohol  All assembled parts are stored in vacuum chamber in Cesr clean room  Integration in clean rooms Class 1000 CESR clean room for MCPs and analyser Class CESR clean room for electronic boards In subcontractors clean rooms (Comat or Microtec)  Unit bakeout for outgassing before first calibration tests  SWEA analyser stored in vacuum before calibration or before delivery to UCB  Bakeout of full Swea instrument at UCB

SWEA – MAVEN Protoflight AIT Flow Chart 13 juin MAVEN-SWEA instrument peer review / CESR Note: Stereo-SWEA Engineering model analyser will be re-furbished according to Stereo to Maven changes and modifications indications will be given to SSL (date TBD) in parallel with AIT activities

AIT Schedule ( ) 13 juin MAVEN-SWEA instrument peer review / CESR Delivery date to UCB TBD (mid 2011) Uncertainties due to open issues (Stereo to Maven changes)

AIT: procurements & work in progress 13 juin MAVEN-SWEA instrument peer review / CESR  Most of assembly tools available at CESR or in Comat  Stereo-SWEA engineering model available for « Maven modifications »  Flight MCPs ordered (delivered late february 2010)  Flight PCBs & MCP supports to be delivered March 2010  Contract signed with Comat (mech. Subcontractor) – waiting for changes issues decisions.  Charge amplifiers A111F ordered to Amptek with GSFC screening (delivery 02/15)  Some EEE parts ordered, most of deliveries expected in May 2010  Stereo parts re-screening: quotation received

Next activities 13 juin MAVEN-SWEA instrument peer review / CESR o Update CESR / UCB documents (ICD, QA) o Update product tree and setup doc server o Update product tree (extrapolated from Stereo-Swea) and setup documentation server o Update EEE parts list, material list o Fix most of Stereo to Maven changes issues with UCB o Order all missing flight parts o Order high voltage optocouplers fabrication. o Order pinpullers o Mechanical parts fabrication o

++ 13 juin MAVEN-SWEA instrument peer review / CESR