TPC FEE status and more TUM Physics Department E18 I.Konorov.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

1 500cm 83cm 248cm TPC DETECTOR 88us 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 LATERAL.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
The MAD chip: 4 channel preamplifier + discriminator.
ESODAC Study for a new ESO Detector Array Controller.
Front-end electronics for Time Projection Chamber I.Konorov Outlook:  TPC requirements  TPC readout options  Options for TPC FE chips  Prototype TPC.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
B. KetzerGEM-TPC GEM-TPC Meeting Bernhard Ketzer Technische Universität München 14 February 2008 Telephone Conference.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Detector Array Controller Based on First Light First Light PICNIC Array Mux PICNIC Array Mux Image of ESO Messenger Front Page M.Meyer June 05 NGC High.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
1 DAQ Update. 2 DAQ Status DAQ was running successfully and stably in ’07 beam time Trigger bus scheme has proven to be very flexible – Added additional.
Shashlik type calorimeter for SHIP experiment
SODA: Synchronization Of Data Acquisition I.Konorov  Requirements  Architecture  System components  Performance  Conclusions and outlook PANDA FE-DAQ.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Status of NA62 straw electronics Webs Covers Services Readout.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
TPC electronics for ILD P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 24, 2013.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
N- XYTER Front-End Boards Christian J. Schmidt, GSI Darmstadt 13. CBM Collaboration Meeting, GSI, Darmstadt, March 10 – 13, 2009.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
TPC electronics Status, Plans, Needs Marcus Larwill April
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
B.Satyanarayana (For INO collaboration) Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai, 400.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
CBM 12 th Meeting, October 14-18, 2008, Dubna Present status of the first version of NIHAM TRD-FEE analogic CHIP Vasile Catanescu and Mihai Petrovici NIHAM.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Overview of TPC Front-end electronics I.Konorov Outline:  TPC prototype development  Readout scheme of the final TPC detector and further developments.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
PADME Front-End Electronics
Valérie Chambert and Joël Pouthas
The Data Handling Hybrid
DCH FEE STATUS Level 1 Triggered Data Flow FEE Implementation &
SUMMARY OF THE ORSAY LD-TPC ELECTRONICS MEETING
DCH FEE 28 chs DCH prototype FEE &
Mini-drawers, FE-ASIC , Integrator
Power pulsing of AFTER in magnetic field
Toward the final design of a TPC for the ILD detector
Conceptual design of TOF and beam test results
Status of n-XYTER read-out chain at GSI
prototype PCB for on detector chip integration
Technische Universität München
Readout electronics system for Laser TPC prototype
Presentation transcript:

TPC FEE status and more TUM Physics Department E18 I.Konorov

Overview T2K chip FEE Full system readout Important questions Plans PANDA collaboration meeting Igor Konorov TUM

Front end card, first prototype PANDA collaboration meeting Igor Konorov TUM

Calibration with pulse Test pulse : 50 fC Peaking time 116 ns Peaking time 200 ns PANDA collaboration meeting Igor Konorov TUM

Measured chip performance Noise performance –Board is not connected to detector –1 ADC unit = 0.12 fC or 700e- –4+4 unconnected channels –4 Fixed Pattern Noise channels PANDA collaboration meeting Igor Konorov TUM Noise of connected channels: ~600 e- T2K noise Saclay

Test chamber front-end board Front-end board:  4xT2K chips  256 channels  L-shaped to place chips outside of beam PANDA collaboration meeting Igor Konorov TUM Top sideBottom side Noise performance: 850 e

Final design of T2K FE card PANDA collaboration meeting Igor Konorov TUM 4 T2K chips, 256 Channels Power Supply +3.3V Power consumption < 1.5W CUT

Further step : cooling tests Increase thickness or add two more Ground copper layers for cooling Produce final FE card Test temperature distribution on the card with side cooling With and Without top copper plate For test we need final design of grounding/cooling contacts PANDA collaboration meeting Igor Konorov TUM Peltier cooler

Complete Readout scheme PANDA collaboration meeting Igor Konorov TUM x T2K FEE11 x ADC2 x HGESICA Fibers Other modules: 2 Spill Buffer PCI cards TCS controller TDC for TCS synchronization

To be done Production –50 T2K FEE cards –12 ADC cards –3 HGESICA T2K chips availability: –Saclay provides 320 chips(20k channels) 20 chips this week 300 during March – PANDA collaboration meeting Igor Konorov TUM

Conclusions and outlook Performance of T2K chip fulfils TPC requirements Complete readout tests till end of February (first week of March) Complete cooling tests till April Start production in April Integrate HGESICA readout into FOPI asap PANDA collaboration meeting Igor Konorov TUM