ABA Forum on Construction Division 4 Literature Review: The Impacts of Design-Build On the Public Workforce Authored by: Douglas D. Gransberg, PhD, PE.

Slides:



Advertisements
Similar presentations
Governor’s Center for Efficient Government. Mission The mission of the Governor's Center for Efficient Government is to promote fair and transparent best.
Advertisements

California | Illinois | Michigan | North Carolina | Texas | Washington, D.C. Exceptional service. Dykema delivers. 21 ST CENTURY LEGAL FEE.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
Air Transport Sector Restructuring Victor Craig Director Air Transport Halcrow AirPlan - Malaysia.
NATURE OF CONSTRUCTION BUSINESS Aleš Tomek Faculty of Civil Engineering Department of Economics and Management CZECH TECHNICAL UNIVERSITY IN PRAGUE.
2 Breakout Session # 1006 Rodney C. Cartwright, Chief, Procurement and Contracts National Gallery of Art, Washington DC Date April 15, 2008 Time3:20 PM.
NEPA ASSUMPTION SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM.
LANE CLOSURE CHARTS CHART DEVELOPMENT AND DELAY DAMAGES (District 3) OBJECTIVE To become familiar with the lane closure chart development process.
Surface Transportation project delivery program
Legal Perspective on NDOT Alternative Procurements Geoffrey S. Petrov, Nossaman LLP.
1 Introduction to Workforce Planning and Development in State of Alaska Executive Branch Departments.
Innovative Contracting Techniques “Partnering with Industry to Create a Better Roadway” Presented by Doyt Bolling Director Utah Technology Transfer Center.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
CHAPTER 9: LEARNING OUTCOMES
Chapter 8 Assuring the quality of external participants’ contributions
StaffCV Recruitment Management Solution A New Paradigm In Recruiting StaffCV Recruitment Management Solution A New Paradigm In Recruiting.
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
Certification/Qualification Program. Certification Program What is it? Who is involved? What should be considered? Where can a Certification Program work.
Traffic Incident Management – a Strategic Focus Inspector Peter Baird National Adviser: Policy and Legislation: Road Policing.
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
Professional Development Programs
2005 AASHTO Value Engineering Conference Using VE in Design Build Presented by: Jerry R. Blanding Innovative Contracting Engineer FHWA – NRC July 21, 2005.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Non-Academic Staff Compensation Program Employee Presentation 2013.
PPP in the UK Ian Rylatt, Chief Executive Officer, Balfour Beatty Investments.
The Nature of Human Resource Management Chapter 1.
Managed Competition: Part of a Successful City’s Strategy Teresa Curlin City of Charlotte May 2007.
Procurement and Construction Management and Oversight What Board Members Need to Know Jerry Smiley, AICP 24 July 2013.
ETF Conference, Building & Financing European Transport Infrastructure, Brussels, 23rd Oct Building & Financing European Transport Infrastructures.
Chapter 13: Developing and Implementing Effective Accounting Information Systems
Fundamentals of PPPs VASCUPP September 25, 2013 Rick Norment, NCPPP.
To certify or not to certify. Why Certification? Advance GIS as a Profession Support employment & business needs Ensure core competency of ethics, experience,
MANPOWER PLANNING. DEFINITION PROCESS BY WHICH ANORGANISATION ENSURES THAT IT HAS THE RIGHT NUMBER AND KIND OF PEOPLE AT THE RIGHT PLACE AND AT THE RIGHT.
Basic of Project and Project Management Presentation.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
ABC POLICY DEVELOPMENT IOWA DOT Norman McDonald, PE Iowa Department of Transportation Office of Bridges and Structures MID-CONTINENT TRANSPORTATION RESEARCH.
UK government policy on social enterprise and public procurement Jonathan Bland 1.
2  Mission Statement.  Company’s overall purpose and direction, products, services and values.  Goals.  That accomplish the mission. E.g. 5 year plan.
1 Kingsley Karunaratne, Department of Accounting, University of Sri Jayewardenepura, Colombo - Sri Lanka Practice Management.
2 William P. McNally Assistant Administrator for Procurement NASA Procurement Tenets August 4, 2008 NCMA Conference.
ITS Georgia | June What is the role of ITS in the emerging public/private partnership transportation market in Georgia? ITS Georgia Monso_Julia.
1 1st PMI AGC Energy Forum: DMS Debates NOCs in the GCC no longer need a PMC on a Project 2 nd June 2010 Essa Al-Ansari.
Public Private Partnerships What We Have Learned & What More We Need to Know.
1. 2 Due to the pervasive nature of ICT, the new millennium will require a new breed of ICT knowledge workers with a whole range of new skill sets Training,
January 14, The NAMC LCDP Will Provide A Proven Contractor Capacity Building Program For The Public and Private Sector.
Contractor Alternate Design Serving the Public’s Best Interest.
CS SE370 Software Engineering Lecture 5 Feasibility Studies.
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
1. Design-Build is a project delivery process in which the design and construction phases of a project are combined in a single contract. The consultant.
Virginia Office of Public-Private Partnerships (VAP3) Adopted Public-Private Transportation Act (PPTA) enabling legislation in 1995 Public-Private Education.
Outsourcing of Census Operations United Nations Statistics Division Regional Workshop on the 2010 World Programme on Population and Housing Censuses: International.
Introduction to Procurement for Public Housing Authorities Alternatives to Procurement: Force Account Labor Unit 9.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Chapter 10: The Texas Bureaucracy and Policy Implementation.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved. © 2014 HDR, all rights reserved.
CHAPTER 9: LEARNING OUTCOMES
7th ASEAN COMPETITION CONFERENCE 8-9 March 2017, Malaysia “ASEAN’s Young Competition Agencies – The Tough Get Going” Dato’ Ahmad Hisham Kamaruddin Member.
Job Corps – Career Center Collaboration Case Study New York and New Jersey September 19, 2016.
Introduction to HUMAN RESOURCE MANAGEMENT
CHANGING PROJECT DELIVERY SYSTEMS
Centralization and Standardization Listening Session
The Oregon Approach to Innovation in Infrastructure
CHAPTER 4- STRATEGIC SOURCING FOR SUCCESFUL SUPPLY CHAIN MANAGEMENT
PROJECT DELIVERY METHODS
BASICS OF PUBLIC PRIVATE PARTNERSHIPS
Presentation transcript:

ABA Forum on Construction Division 4 Literature Review: The Impacts of Design-Build On the Public Workforce Authored by: Douglas D. Gransberg, PhD, PE Keith R. Molenaar, PhD April, 2007 Presentation By: Joel Rhiner Stein Ray LLP Chicago, Illinois 1

Research Paper Test Case: – California has very few Design-Build (“DB”) public infrastructure projects because of concerns that doing so could result in staff cutbacks within public agencies (but CA does use DB on public buildings) – Other jurisdictions use DB on state infrastructure projects (DB transportation projects constructed in over 35 states) Purpose of Study – Determine impact on the CA Department of Transportation professional workforce if DB used to deliver infrastructure projects. 2

Growth of Non-Residential DB Projects $18 $40 $75 $180 $250 $300 $250 $200 $150 $100 $50 $ By 1994, the Federal Highway Administration had approved over 300 DB transportation projects in 32 states worth almost 14 billion -Over $3 billion worth of water/wastewater projects done using DB 3 20-Year Change in Design-Build Project Volume ($ Billion)

Proven Benefits of Using DB on Public Projects – Likely to reduce duration of project by eliminating 2 nd procurement process, and allowing concurrent design and construction activities. e.g. user costs of CA freeway from congestion, increased toxic omissions and etc. = $10,000 per lane – mile/day x 8 lanes x 5 miles = $400,000 / day. e.g. typical 30 day period to bid traditional Design Bid Build would result in user costs of $12 MM. – Increased certainty of project costs Less change orders Better ability to manage capital improvements budget thus resulting in award of more projects. 4

Common Concerns of Using DB on Public Projects – Quality of design possibly compromised because of influence by team members other than the designer (e.g. to maximize profit) – Quality of construction management compromised (“fox guarding the hen house”) – Shifting of professional engineering jobs from public to the private sector – Significantly reduces the use of the traditional design-bid build method. 5

Benefits/Concerns of Outsourcing Engineering Work to Private Sector Potential Benefits of Outsourcing 1.DOTs can provide projects for general public within growing resource constraints. 2.Costs are incurred only when services used. 3.A smaller workforce would be required with peak demands handled by outsourcing. 4.Potential for cost savings to DOT. 5.Access to special private sector skills on as-needed basis. Potential Concerns for Outsourcing 1.DOTs may have less control on the quality, time and cost of its primary functions 2.DOTs may lose the skills and expertise to conduct essential functions in-house, or to effectively check, evaluate or approve the work of external sources. 3.Conflict with DOT workforce and possible legal restrictions. 4.DOTs would need new employees with different expertise and management skills. 5.DOTs would have less capacity to serve a traditional role for hiring entry-level engineers to gain competent experience in the road building industry. 6

Evaluation of Outsourcing Concerns DOTs may have less control on the quality, time and cost of its primary functions? False: Research has shown that DB reduces project delivery time, controls cost growth after bid award, and furnishes a product of equal quality to projects using traditional project delivery methods. 7

Evaluation of Outsourcing Concerns DOTs may lose the skill and expertise to conduct essential functions in-house, or to effectively check, evaluate or approve the work of external sources? False: – attrition to private sector already exists because of salary differential (working at DOT often a “stepping stone”) – Outsourcing of engineering work a necessity for most DOTs because of less experienced workforce and increased workload. e.g. Arizona DOT outsourcing 90% of its design work because of loss in staff to private industry e.g. Maryland generally unable to retain staff beyond 5 years 8

Evaluation of Outsourcing Concerns Conflict with DOT workforce and possible legal restrictions? True: – No legal authority in CA that would allow DOT to utilize DB project delivery California Public Contract §10120 states, “Before entering into any contract for a project, the department shall prepare full, complete, and accurate plans and specifications and estimates of cost, giving such directions as will enable any competent mechanic or other builder to carry them out.” – But not an obstacle if legislature acts 9

Evaluation of Outsourcing Concerns DOTs would need new employees with different expertise and management skills? True: Many states report assigning their most experienced engineers to administer DB projects; still need robust traditional design-bid- build program to balance the workload between entry level and most experienced staff. – e.g. Oregon limits number of DB projects necessary to maintain core staff – e.g. South Carolina has initiated a program of technology transfer from DB teams to DOT staff – e.g. Washington has found that use of DB has enhanced technical and judgment skills of DOT staff 10

Evaluation of Outsourcing Concerns DOTs would have less capacity to serve a traditional role for hiring entry-level engineers to gain competent experience in the road building industry? False: Research has shown no impact on hiring of entry level engineers. 11

The California Problem California needs to expedite delivery of much needed transportation infrastructure projects DB might be the solution but not being used because of concerns that it will result in loss of jobs to private sector Myth or Reality? 12

Myth 13

Survey - Impact of DB on State DOT Workforces 14

Survey – Impact of DB on State DOT Workforces Myth 1: Use of DB on State DOT projects will result in abolishment of traditional Design-Bid-Build projects Reality: False – 93% of states reported that DB projects make up less than 10% of their total program – 92% of states reported that DB projects make up less than 25% of construction budget – 73% of states reported that DB projects make up less than 10% of construction budget 15

Survey – Impact of DB on State DOT Workforces Myth 2: Use of DB on DOT projects will result in reduction of State DOT Workforces Reality: False. No states reported reducing size of DOT workforce because of DB – 5 states reported an increase in professional engineering workforce since implementing DB (e.g. Texas added 178 new engineers in 4 year period) – 3 states reported a drop in professional engineering workforce but for reasons not related to DB (e.g. Florida cited to legislative change that forced them to reduce size of workforce) – All other states reported no change to DOT workforce 16

Survey – Impact of DB on State DOT Workforces Myth 3: Use of DB on DOT Projects will change the role of DOT Workforce Reality: Partly True – DOTs must still advance design enough to identify right of way requirements and environmental clearances – Survey shows that DOTs becoming more involved in developing design criteria to reduce performance risk (design often advanced to 10% - 30%) – DOTs still must review and approve DB’s design deliverables – DOTs still responsible for QA/QC – Survey shows that “DB changed the roles agency engineers play without changing their workload” – Survey shows that “DB changed the roles and increased the workload” 17

Conclusions DB is proven project delivery tool that promises faster project delivery, increased cost certainty and comparable quality The concern that DB will eliminate jobs for public engineers appears unfounded (just the opposite) Implementing DB does not mean DOTs will stop using the traditional design-bid-build method DB requires a well qualified public staff and requires them to exercise even more engineering judgment The use of DB does not reduce workload but will likely increase roles for overseeing, revising and approving Perceptions die hard but DB should take its place along side DBB as another tool DOTs can use to deliver much needed infrastructure projects 18