Layout and conventional facility N.Terunuma KEK. Conventional facility 1 Layout of beam line should be fixed until end of June 2006. We have to start.

Slides:



Advertisements
Similar presentations
Radiation Shielding Information and Guidance
Advertisements

L-Band Test Stands in ESB Carsten Hast Test Facilities Department Helps to develop and test near-term solutions for accelerator systems including RF structures.
Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
Industrial Radiography
Status of ATF/ATF2 and machine schedule in this fall Impact of the earthquake Recovery status, alignment Schedule in this fall N. Terunuma, KEK.
PROBLEM: Radiation Dose Rate in IR2 When IR1 is Operating (and Vice Versa) Muon Dose Rate > 1 mRem/hr for 0.1% Collimated Halo.
1 MICE Hall Layout MICE Collaboration Meeting, LBNL, February 12, 2005 Paul Drumm for Yury & the RAL team.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
March 17, Radiation Shielding Update and Guidance Don Parry, MHP, CHP Region I Physicist Michigan Department of Community Health Radiation Safety.
RADIATION PROTECTION IN DIAGNOSTIC AND INTERVENTIONAL RADIOLOGY
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Radiological Aspects of ILC Hee-Seock Lee Pohang Accelerator Laboratory 2 nd Workshop of Korean ILC at PAL.
MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
2nd ATF2 meetingRole Sharing between KEK and SLAC M.Kumada Role Sharing between KEK and SLAC 1.Performance of Demonstration power supply of KEK 2.Role.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
First AWAKE dump calculations Helmut Vincke. Beam on dump Muon axis inside and outside CERN Distances: Beam impact point to end of West hall: ~300 m Beam.
MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt Thoughts about LDC Hall and Assembly (Work is not finished.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
D. Beavis (RSC) May 4, 2010 EBIS ARR Radiation Safety.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
QBC Europe and its facilities. Building purchased – 1 st August 2006 Open for business – 6 th October 2006.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Beam line Experiment area SC magnet Pion production target
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
COMET. μ-e conversion search from muonic aluminium J-PARC pulsed proton beam to produce pulsed muon beam Forbidden in the Standard Model  clue to the.
Subjects for SC FF magnet system at ATF2 Infrastructures at ATF2? How supply cryogen at ATF2 (set up cryogenic system?) (Gas helium recovery line?) Set.
P1 Installation and alignment of ATF2 magnets R. Sugahara (KEK) Member: [KEK] R. Sugahara, M. Masuzawa, [Saubi] M. Takano, [Esu-Kei Service] S. Kato, T.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
11/15/20051 Radiation Protection Issues for ILC (not exhaustive) A. Fassò, N. Noriaki, H. Vincke Radiation Physics.
Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.
WP2 progress on safety E. Baussan EUROnu CB Meeting Monday 10th & Tuesday 11th June 2011 CERN, Geneva, Switzerland.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
L-band test stations in End Station B Richard Swent.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
G2P Installation Readiness. Fast raster & Calorimeter.
CMTF GROUNDING FOR PIP-II K. Carlson PXIE Electrical Coordination Meeting December 19 th, 2013.
HiRadMat status report Adrian Fabich HiRadMat EAM, 4. March 2016 EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th.
AUSTRALIAN NATIONAL UNIVERSITY NUCLEAR PHYSICS DEPARTMENT RECENT ALIGNMENT EFFORTS ALIGNMENT EFFORTS AT THE HEAVY ION ACCELERATOR FACILITY ACCELERATOR.
1 Building Design Progress Dan Wilcox March 2012.
1 Implementation at RAL Iouri Ivaniouchenkov on behalf of Elwyn Baynham, Tom Bradshaw, Tony Jones, Jim Rochford Engineering Department, RAL MICE Collaboration.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
21 July 2006, Vancouver Global Design Effort 1 PPS - division into zones and shield wall locations - N. Terunuma KEK.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
KEK Radiation Related Topics neutrino beam construction subgroup Yuichi Oyama (KEK) and target monitor subgroup for.
Repair of MCWV magnets (TT84 – M2). Works on three magnets : MCWV 693, MCWV 697, and MCWV 701 and the associated XABS Cause of the repair : XABS jam into.
The Next Generation of a Gamma Irradiation Facility GIF++
WANG chuanzhen PENG wei XIAO min LI Chunsong (SQHL)
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
St. George Infrastructure
Industrial Radiography
News and brief overview of Beamline plans for the next few months
Radiation protection of Linac4 M. Silari Radiation Protection Group
Facility upgrade Housekeeping, rad waste segregation, chemicals, safety issues, new configurations. Please see me or Keith.
Status of ATF/ATF2 and machine schedule in this fall
Resident Physics Lectures
Vashek Vylet RadCon Manager UITF Internal Safety Review May 10, 2016
IP configuration session
Beam dump for J-Parc neutrino facility
Course Structure.
Presentation transcript:

Layout and conventional facility N.Terunuma KEK

Conventional facility 1 Layout of beam line should be fixed until end of June We have to start the preparation for the Contract of floor and shielding construction with KEK facility officers. No big modification is acceptable after it. Minor modification, such as adjustments of magnet positions will be acceptable but we can not change for shielding, dump(position,direction).

Conventional facility 2 Beam dump will be near the non-radiation control area. Compare to the present ATF, It have to be smaller than a factor 1/100. We will put the thick concrete shields and Fe/Pb walls to satisfy the safety but we may have beam-termination interlocks by dose monitors. Beam direction to dump have to be North-west, not point to west. We will not use the carrying yard/entrance at this area. CLOSED! Extends the radiation control area. Reduce the radiation dose by 1/L 2.

Concrete 1m or 2m Concrete 1m or 2m Concrete 1m Cables/ Water 1.5 m2.0 m Power Supplies

Shielding layout is not fixed.

Radiation Control Area 20 uSv/h Extend in Dec. 2007? ATF Control Room Non Radiation Control Area < 0.2 uSv/h For KEKB Radiation monitor We have to reduce the radiation doze ~ 1/100 behind the dump shield.