1 Don’t Let Construction Administration Services Become a Claims Maker Architects and Engineers Professional Liability Workshop.

Slides:



Advertisements
Similar presentations
A GIA is a contract between a surety company and a contractor (or subcontractor)/principal. A GIA is a standard, typical document in the construction.
Advertisements

Roles & Responsibilities in Construction Management
THE ROLE OF INSURANCE REQUIREMENTS WITHIN AN ORGANIZATION By Aaron Hardiman, MBA, ARM.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
Assignment Six Risk Control and Premium Auditing.
Security of Payment workshop Andrew Robertson Important Disclaimer: The material contained in this publication is comment of a general nature only and.
These handouts and documents with attachments are not final, complete, or definitive instruments. This information is for guidance purposes only. You should.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
U.S. Department of Labor Wage and Hour Division Davis-Bacon Investigation Procedures.
U.S. Department of Labor Wage and Hour Division Davis-Bacon Investigation Procedures.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Marcy Mealy Procurement Specialist CDBG Program
Contractor Safety Management
Conversation on the Chemical Facility Anti-Terrorism Standards (CFATS) and Critical Infrastructure Protection Chemical-Terrorism Vulnerability Information.
JOB FUNCTION EVALUATION Lowering Your Accident Costs.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Learn. Perform. Succeed. Protest, Claims, Disputes and Appeals Chapter 7.
Project Close Out CTC-470.
Navigating and Negotiating Contracts Presented by Krista L. Newkirk, Associate General Counsel.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
Conditions of the Contract for Construction
PROCEDURES FOR SELECTING THE CONTRACTOR
Workplace Safety and Health Program
A Guide for Estheticians Liability and Risk Reduction Associated Skin Care Professionals
Purpose of the Standards
Office of Business Development Training
This material was developed by Compacion Foundation Inc and The Hispanic Contractors Association de Tejas under Susan Harwood Grant Number SH SH0.
Safety and Health Programs
Construction Engineering 380 Professional Design Services Chapter 12 Appendix G.
Workshop 13 Design - Build Onerous Terms in D&C Agreements in Australasia Tony Barry, President Association of Consulting Engineers Australia.
Construction Management: At Risk. PROJECT MANAGEMENT STRUCTURE: Contractual Relationships Owner Architect/Engineer General Contractor Sub Construction.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Planning an Audit The Audit Process consists of the following phases:
Company duties under the ISM Code
Compensation events and claims Presented by Prof. Khem Dallakoti.
Risk Control © 2006 The St. Paul Travelers Companies, Inc. All rights reserved. E:/2005/PRODUCT SAFETY & LIABILITY/TEMPLATE.PPT 1 Golfing Safety Injuries.
Procedural Safeguards. Purpose Guarantee parents both an opportunity for meaningful input into all decisions affecting their child’s education and the.
Contract Training Class I
Teleworking Michael T. Rengel Kristi A. Hastings Joshua Heggem w) Pemberton,
FleetBoston Financial HIPAA Privacy Compliance Agnes Bundy Scanlan Managing Director and Chief Privacy Officer FleetBoston Financial.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Safety in Construction Contracts Presented By: Ramy besaiso Instructor : Eng: Eyad Haddad Chapter 10.
Responsibility & Authority Module #2 Prepared by Dr. Randy R. Rapp July 2005.
NJSPLS The Character and Nature of Claims Against Land Surveyors Ed Pagan, Jr., Esquire Pagan Affiliates LLC Richard N. Hartman.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
ENGINEER Engineer Duties: Carry out the duties assigned in the contract.Carry out the duties assigned in the contract. Engineer's staff shall include qualified.
HHHR Objective Setting and Performance Appraisal Cycle for Supervisors.
NIOSH AND OSHA REGULATIONS AND CONTACT LENS USE BY: DR. MARK W. BURCHAM.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
Safety and Health Program Don Ebert- Risk Manager (509)
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
The New EPA AAI Rule – Insurer’s Perspective Presented By: Ken Burrell Vice President – Corporate Accounts AIG Environmental.
Reducing the Risk of Litigation. Coach Warn athletes of potential dangers involved in sport Supervise regularly and attentively Prepare and condition.
Preventing Legal Liability Related to Independent Contractors.
Engineering a Good Project Drew Seaman. Engineering: the work of designing and creating large structures (such as roads and bridges) or new products or.
HIPAA Training Workshop #3 Individual Rights Kaye L. Rankin Rankin Healthcare Consultants, Inc.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
Navigators Team Roseanne DeBellis Allison Esrig
Administration of a FIDIC Contract - Project Control
Professional Engineering Practice
SA Legal Contract Review and Submission Process Training
Contract Review and Processing
Brian Bries, Area V.P.-Construction Practice Arthur J. Gallagher & Co.
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
IF YOU WATCH THEM BUILD IT, THEY MAY SUE
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Presentation transcript:

1 Don’t Let Construction Administration Services Become a Claims Maker Architects and Engineers Professional Liability Workshop

DISCLAIMER This program or presentation is only a tool to assist you in managing your responsibility to maintain safe premises, practices, operations and equipment, and is not for the benefit of any other party. The program or presentation does not cover all possible hazardous conditions or unsafe acts that may exist, and does not constitute legal advice. For decisions regarding use of the practices suggested by this program or presentation, follow the advice of your own legal counsel. Travelers disclaims all forms of warranties whatsoever, without limitation. Implementation of any practices suggested by this program or presentation is at your sole discretion, and Travelers or its affiliates shall not be liable to any party for any damages whatsoever arising out of, or in connection with, the information provided or its use. This material does not amend, or otherwise affect, the provisions or coverages of any insurance policy or bond issued by Travelers, nor is it a representation that coverage does or does not exist for any particular claim or loss under any such policy or bond. Coverage depends on the facts and circumstances involved in the claim or loss, all applicable policy or bond provisions, and any applicable law. 2

Construction Services Phase Need for high level of risk awareness. –Phase where the “rubber hits the road.” –Most claims arise during the construction phase. –The designer has the least control and faces constantly changing conditions. 3

4 Evaluate the project, owner and other parties. Evaluate your firm’s resources and ability. Negotiate fair and coordinated contract documents. Manage the client’s expectations. Establish your level of construction phase involvement. Pre-Construction Steps

The Purpose of the Site Visit Determine the purpose of each visit. Contract should specify frequency and timing of visits. If you do not have to be there – do not go. Send appropriate person to the site. 5

Observation, Not Inspection Check that construction is proceeding in conformance in general with plans. It is impossible to guarantee the contractor’s performance. “Inspection, supervision and oversight” suggests unwanted control of construction. 6

Documentation of the Site Visit Develop a “to do” checklist for each site visit. Prepare a written report promptly after each visit. Avoid editorial comments. Record factual observations and conditions. If it gets heated, stay focused and keep it professional. Photographing the job site is a good idea. 7

Rejection of Work Never stop the work. Only the owner can ultimately accept work that differs from the contract documents. Beware of advising on the means and methods of correcting defective work. 8

Site Safety — Who’s Responsible? You have a duty to protect your own employees. Your contract should clearly exclude responsibility for job site safety. Do not venture beyond your contractual responsibilities because your actions can create liability where none existed. Keep accurate, complete and timely records of site visits. 9

Site Safety — Identify the Risk Know your state’s law on site safety liability. Workers Compensation laws affect design liability. CM and D/B change the rules with regard to site safety. Consult with local, experienced legal counsel. 10

Site Safety Steps to take if you see an obvious hazard: –Alert those in imminent danger. –Address the issue with the project foreman. –Remove your personnel from the hazardous area. –Do not stop the work. –Do not tell the contractor how to correct the situation. –Immediately notify the owner and contractor in writing of your observation. 11

Contractor Termination Know when termination is justified and the actions to take. Only the owner should have the authority to terminate. Provide opinions based upon factual observations and unbiased professional judgment. 12

Voluntary Termination Courts view termination as a drastic act. Comply with all termination notice requirements. You need to limit your ongoing liability. Give the client a chance to correct contract violations. Consult with your insurance representative and legal counsel. 13

Shop Drawings & Submittals Present a good opportunity to prevent claims. But … poor internal review process can lead to claims Contract should stipulate a reasonable time for review. Employ a “QA/QC” plan for the review of shop drawings. –Maintain a shop drawing review log. –Retain copies of all submittals. –Return shop drawings that were not required. –Send copies of correspondence to owner. –Consultant and prime process should be consistent. –Use a qualified person for final review. 14

Shop Drawings Procedures Shop drawings that deviate from the contract documents should be noted. Request corrections. Do not review shop drawings that exclude the contractor’s stamp of approval. Return to sender — “not reviewed.” Sub-consultant’s stamp should agree with the Prime’s stamp. 15

With Change Comes Risk Set expectation with clients up front. Process needs to follow the contract precisely. Communicate with all parties and carefully document the communication. Carefully examine the impact of any proposed changes. Execute quickly to prevent project delays. 16

Contractor Requests for Information Excessive or repetitive RFIs may signal an increased risk both for the design professional and the owner. Understand and enforce contract provisions for RFIs. Excessive or repetitive RFIs should be addressed with the owner and contractor. Like shop drawings, a consistent response process is critical. 17

Payment Certifications Use good contract language: avoid guarantees and warranties. Require contractor’s affidavit and/or AIA G702. View the work before processing payment requests. Do not get into means, methods or control issues. Use roster of contractors and subs (their sworn statements). Use schedule of values and require lien waivers. 18

Documentation Consistent documentation increases your credibility. Documentation includes written records, audio/video tapes, photographs and computer records. Observations should be promptly recorded. Record observed facts — avoid unneeded editorial comments. Assume all project records are discoverable. Record retention should at least track state statutes plus repose. 19

Records Preservation - Examples Contracts and amendments. Significant conversations. Meeting notes. Phone log. Reports and correspondence. Advisory letters. Shop drawing and change order logs. Invoices. 20 Client approvals. Product information. Site visit reports. Correspondence with the contractor and client. Project completion documentation. Photographs and video RFIs

Crisis Management Maintain a calm, positive attitude. Do not admit liability or take responsibility. Establish a media policy with a firm contact. Seek objective opinion from third party. Notify your insurance representative immediately. 21

Questions? This concludes our presentation. Please feel free to contact me with any additional questions. Laura Guagliardo Travelers