PROPOSAL RELIEF WELL DESIGN UNTUK MENGHENTIKAN SEMBURAN LUMPUR SUMUR BANJAR PANJI #1 PORONG – SIDOARJO Oleh: IATMI Drilling Team.

Slides:



Advertisements
Similar presentations
How Will We Manage Our Nonrenewable Mineral Resources in the Future?
Advertisements

Geotechnical-Geophysical Void Mapping and Foamed-Sand Backfilling of the Rapson Coal Mine, Colorado Springs, Colorado – Case Study Kanaan Hanna, Jim Pfeiffer.
Site Characterization Instructional Goal: Upon completion of this topic the participant will better understand the need to identify and evaluate various.
Dual Casing Running for deep water spud in
4” Diameter tube inserted into 21” riser at the seafloor (5000’) New riser allowing flow to the drillship Enterprise Oil separated & shipped ashore System.
Survey Planning & Illumination with NORSAR-3D
Time-Lapse Monitoring of CO2 Injection with Vertical Seismic Profiles (VSP) at the Frio Project T.M. Daley, L.R. Myer*, G.M. Hoversten and E.L. Majer.
9-Point Drilling Plan 9-Point Drilling Plan. Presentation Goals To Describe a Drilling Plan That… Is in compliance with Order #1. Is in compliance with.
Chapter 3 Casing design.
Environmental Drilling By: Josh Humphreys October 8,2006.
MC 252 #1 – Macondo Prospect OCS-G Well Control Simulation Results April 29, 2010.
Where can we find oil and natural gas?. Oil and natural gas are found in the small spaces between the grains in a sedimentary rock. Mathematically, porosity.
Core Value Drawing the Blueprint for a Sustainable Natural Gas Future Denver, Colorado January 18, 2012 Mark K. Boling Executive Vice President & General.
CONSTRUCTION OF SOIL NAILING WALLS
Petroleum Engineering 406
Drilling Methods Rotary rigs –Most-used method for deep production wells –Uses a fluid (mud, water or forced air) to carry drill cuttings to surface Hollow-stem.
Trouble in the Gulf Deepwater Horizon
PETE 411 Well Drilling Lesson 5 Hole Problems.
Instrumentation and Quantification of Tsunamis With an Emphasis on the Santa Barbara Channel.
Petroleum Engineering 406
The Ground Water Characterization Program Helping Secure Virginia’s Ground Water Resources For The Future The DEQ Office of Ground Water Characterization.
Inflatable DST Equipment An Overview Presentation.
INFLATABLE DST EQUIPMENT
An Approach to Recover Hydrocarbons from Currently Off-Limit Areas of the Antrim Formation, MI Using Low-Impact Technologies DOE Contract DE-FC26-06NT42931.
Hydraulic Fracturing 101. What is Hydraulic Fracturing? Hydraulic fracturing, or “fracking”, is the process of drilling and injecting fluid into the ground.
1 STATUS REPORT JINR G. Shirkov, ILCW08, November 17, 2008.
Soils Investigation Soil Investigation
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
SPRINGVILLE CITY WATER TANK AND WELL PROJECT WILLIAM GARNER, JEREMY FOWLER, AUSTIN JASPER The city of Springville has been experiencing a period of rapid.
Lesson 4 Drilling Cost & Drilling Rate
Confidential to SMD JIP
Ross Lowdon June 4 th 2014 SPE Aberdeen S implified S eries 2014 Demystifying Petroleum Engineering Sponsored by Shell UK Limited.
RAILROAD COMMISSION OF TEXAS BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES 1.
1 New Production Technologies for Lifting Liquids from Horizontal Wells Radius Energy, LLC May, 2015.
Trouble in the Gulf Deepwater Horizon
Petroleum Engineering 406 Lesson 6 Well Control Unusual Operations.
Petroleum Engineering Presented by : Mostafa Khojamli November
DRILLING.
Norse Energy Corp., USA  As natural gas assumes a far more important role in America’s energy mix, Norse Energy is committed to exploring, developing,
09.35 Task 1: Overall monitoring objectives. Andy Chadwick, BGS (10 mins) 1.
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
Lesson 26 * Well Control * * Variable Geometry *
RAILROAD COMMISSION OF TEXAS WELL COMPLIANCE FORMS AND PROCEDURES Austin Regulatory Conference September
Soil Survey Chapter 19. This short presentation focuses on the two below topics.
Casing Design.
Earthquakes & Society –tsunami –seismic gap Objectives Discuss factors that affect the amount of damage done by an earthquake. Explain some of the factors.
By: Dakota White.  Slides  Elements  Project Description  Client Survey  Bubble Diagram  Design Sketches  Code Considerations  Habitat for Humanity.
MUD LOGGING DEFINITION, THEORY & LAG CALCULATIONS
Chapter 5 Drilling Techniques and Drilling Problems
Petroleum Engineering 406 Floating Drilling
IADC Application Category Category A – Managed Pressure Drilling (MPD) Drilling with returns to surface using equivalent mud weight that is maintained.
The main instrument used is called the sonde. A basic sonde consists of a source and two receivers one-foot apart. The sonde is lowered down the borehole.
Projectile Motion Practice Problems #1:  A ball is fired from a launcher with an initial velocity of 20.0 m·s -1 at an angle of 30.0° to the horizontal.
Confidential to Subsea Mudlift Drilling JIP11/6/00DGD Template 1 of 64 Dual Gradient Drilling Basic Technology Lesson 1 Introduction to DGD Jerome J. Schubert.
ICORR Technologies, Inc.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Siting Strategies.
Get the Ground Water Picture. Individual Questions The horizontal scale of the cross section is 1 inch = 1 mile. The vertical scale is 1 inch = 50 ft.
Petroleum Engineering 411 Well Drilling
Introduction to Well Completions
Microtremor method Saibi. Dec, 18, 2014.
Drilling and Production
Hydraulic Fracturing 101.
Safety Rules to Consider for Water Well Drillers
Sinusoidal Functions as Mathematical Models
EARTHING.
Requirements and Challenges Extended Laterals
Ground Water Revised 12/16/09.
Acoustic Reflection 2 (distance) = (velocity) (time) *
Ground Water Revised 12/16/09.
Groundwater/Wells, Springs & Geysers
Presentation transcript:

PROPOSAL RELIEF WELL DESIGN UNTUK MENGHENTIKAN SEMBURAN LUMPUR SUMUR BANJAR PANJI #1 PORONG – SIDOARJO Oleh: IATMI Drilling Team

RELIEF WELL DESIGN BASIC CONCEPT AT LEAST 3 RELIEF WELLS PROPOSED TO ENSURE 2 OF THEM HIT THE TARGETS SELECTED WELL SURFACE LOCATIONS: –FAR AWAY FROM NEARBY HOUSES & PUBLIC ACTIVITIES –FIRM & STABLE TOP SURFACE –EASY ACCESS FOR LOGISTIC SUPPORTS –SUFFICIENT SPACE FOR DRILLING RIG COMPLEX & ITS EQUIPMENT CONFIRMED BOTTOM HOLE TARGETS: –BJP #1 WELL DATA VALIDITY CONSERVATIVE CASING DESIGN TO SECURE THE UPPER HOLE SECTIONS AND TO ENSURE WE CAN REACH THE BOTTOM HOLE TARGET –BJP #1 WELL & OFFSET WELLS DATA –ADDITIONAL DATA ACQUISITION (INCL. 3D SEISMIC & SHALLOW HAZARD SURVEY –“BIG” CASING ON BOTTOM (9-5/8” ??) TO ENSURE HIGH RATE PUMPING CAPABILITY –ALL AVAILABLE DRILLING TECHNOLOGY POSSIBLE UTILIZATION

POTENTIAL CHALLENGES EXISTING SURFACE & SUB-SURFACE DATA AVAILABILITY & VALIDITY UNCERTAIN SUB-SURFACE LATEST CONDITION UNCERTAIN BOTTOM HOLE TARGET LOCATION HAZARDOUS WORKING ENVIRONMENT (GAS, SUBSIDENCE, ETC) HIGH FLOW RATE OF FORMATION WATER BLOW-OUT ESTIMATED DRILLING COSTS = $ 200 MM FOR 3 WELLS NOTE: NON-TECHNICAL CHALLENGES WILL BE DISCUSSED AND HANDLED SEPARATELY

5 Januari 2008 NEED LATEST AERIAL SHOTS / PHOTO SITE SURVEYS

PREDICTED SOURCE OF FORMATION WATER BLOW- OUT IS BELOW 6000 FT BOTTOM HOLE 8000 FT WITH 59 deg OF INCLINATION & 9000 FT OF VERTICAL SECTION

BOTTOM HOLE 9000 FT WITH 54 Deg OF INCLINATION & 9000 FT OF VERTICAL SECTION

KILLING PHASE 15, ppg 160 bpm  94 minutes (Eq bpd) 48,800 12,5 ppg (Eq bpd) 62, ppg (Eq bpd) THESE FIGURES WILL BE VERIFIED BASED ON LATEST CONDITIONS.