PROPOSAL RELIEF WELL DESIGN UNTUK MENGHENTIKAN SEMBURAN LUMPUR SUMUR BANJAR PANJI #1 PORONG – SIDOARJO Oleh: IATMI Drilling Team
RELIEF WELL DESIGN BASIC CONCEPT AT LEAST 3 RELIEF WELLS PROPOSED TO ENSURE 2 OF THEM HIT THE TARGETS SELECTED WELL SURFACE LOCATIONS: –FAR AWAY FROM NEARBY HOUSES & PUBLIC ACTIVITIES –FIRM & STABLE TOP SURFACE –EASY ACCESS FOR LOGISTIC SUPPORTS –SUFFICIENT SPACE FOR DRILLING RIG COMPLEX & ITS EQUIPMENT CONFIRMED BOTTOM HOLE TARGETS: –BJP #1 WELL DATA VALIDITY CONSERVATIVE CASING DESIGN TO SECURE THE UPPER HOLE SECTIONS AND TO ENSURE WE CAN REACH THE BOTTOM HOLE TARGET –BJP #1 WELL & OFFSET WELLS DATA –ADDITIONAL DATA ACQUISITION (INCL. 3D SEISMIC & SHALLOW HAZARD SURVEY –“BIG” CASING ON BOTTOM (9-5/8” ??) TO ENSURE HIGH RATE PUMPING CAPABILITY –ALL AVAILABLE DRILLING TECHNOLOGY POSSIBLE UTILIZATION
POTENTIAL CHALLENGES EXISTING SURFACE & SUB-SURFACE DATA AVAILABILITY & VALIDITY UNCERTAIN SUB-SURFACE LATEST CONDITION UNCERTAIN BOTTOM HOLE TARGET LOCATION HAZARDOUS WORKING ENVIRONMENT (GAS, SUBSIDENCE, ETC) HIGH FLOW RATE OF FORMATION WATER BLOW-OUT ESTIMATED DRILLING COSTS = $ 200 MM FOR 3 WELLS NOTE: NON-TECHNICAL CHALLENGES WILL BE DISCUSSED AND HANDLED SEPARATELY
5 Januari 2008 NEED LATEST AERIAL SHOTS / PHOTO SITE SURVEYS
PREDICTED SOURCE OF FORMATION WATER BLOW- OUT IS BELOW 6000 FT BOTTOM HOLE 8000 FT WITH 59 deg OF INCLINATION & 9000 FT OF VERTICAL SECTION
BOTTOM HOLE 9000 FT WITH 54 Deg OF INCLINATION & 9000 FT OF VERTICAL SECTION
KILLING PHASE 15, ppg 160 bpm 94 minutes (Eq bpd) 48,800 12,5 ppg (Eq bpd) 62, ppg (Eq bpd) THESE FIGURES WILL BE VERIFIED BASED ON LATEST CONDITIONS.