Status of integration in USA15. Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y.05-09.A2 equipped with turbine cooling system and nominal.

Slides:



Advertisements
Similar presentations
Goals and status of the ATLAS VME Replacement Working Group Markus Joos, CERN Based on slides prepared by Guy Perrot, LAPP 19/09/2012.
Advertisements

CSC upgrade for LS1 USA-15 rack: layout, construction and installation 11 th February 2013.
The 5-slot 4U DC chassis is one of a line of products that Asis has developed over the years with it’s vas experience in the ATCA field. Asis AdvancedTCA.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
Asis AdvancedTCA Class Fan Tray Fan tray is a component responsible of supplying sufficient shelf cooling According to the Parameters send from the shelf.
3U ATCA Shelf October Proprietary and Confidential-
Enclosures & ComponentsBackplanesSystem PlatformsSwitches, Knobs & LEDsCabinets ATCA Systems Technology Meeting CERN Genève.
Power distribution box XD1 top DTTF_Crate XD2 middle DTTF_Crate XD3 bottom DTTF_Crate Connection to DTTF_Crate through cable USE H07 ZZ-F 3G1,5 RACK S1D01.
Asis AdvancedTCA Class. What is PICMG? PICMG - The PCI Industrial Computers Manufacturer's Group Is a consortium of over 450 industrial computer product.
Shelf Management & IPMI SRS related activities
September 26, 2013 xTCA work group Evaluation results from AC/DC converters for xTCA Collaboration (CERN PH-ESE-BE) Vincent Bobillier, Matteo Di Cosmo,
ZTF Interconnecting Scheme Stephen Kaye
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
NRC Rack in USA15 Discussion on Monday with Martin J. and Agostino L. In short: our proposals do not work Current ATCA shelves incompatible with LHC racks.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
M. Joos, PH/ESE1 ATCA for ATLAS - status Activities of the working group PH/ESE xTCA evaluation project Next steps.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
IDE DCS development overview Ewa Stanecka, ID Week, CERN
1/12/2010 R. CIARANFI 1 NEW NINO BOARD FOR RICH OLD AND NEW LOGISTIC NEW BOARD DESCRIPTION NEW MODULARITY 32 CH NEW FORM FACTOR FRONT END AREA AND DAQ.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
The 2-slot 2U DC chassis is one of a line of products that Asis has developed over the years with it’s vast experience in the ATCA field. Asis AdvancedTCA.
19/05/10FV 1 HyTec crate – DCS integration issues.
ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
17/03/2003 Referee Meeting M. Beretta 1 MDT Barrel - Complete LV-HV rack 6U 1U 4U 2U 45U 19” Tangential Fan High Voltage Crate Low Voltage Crate Heat Exchanger.
ATCA cooling tests Claudio Bortolin (PH-ADO) Damian Dyngosz (PH-DT) George Glonti (PH-UAT) Julian Maxim Mendez (PH-ESE) Lukasz Zwalinski (PH-DT) xTCA IG.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Installation of the T600 at Fermilab CSN2, September 22,
ATCA COOLING PROJECT INTERSHIP FINAL PRESENTATION Piotr Koziol.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
System Demonstrator: status & planning The system demonstrator starts as “vertical slice”: The vertical slice will grow to include all FTK functions, but.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
AEON 4000 Including the SMPS 4000 rectifier and the AEON Gold Alarm & Monitoring Unit.
FLATPACK Rev.5 September 2002 Updated versions may be available.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Status of FTK & requests 2013 Paola Giannetti, INFN Pisa, for the FTK Group ATLAS Italia, Sep 5, 2012 Status of FTK work IMOU NEWS & Future steps TDR with.
News on FTK rack infrastructure A. Lanza – INFN Pavia FTK Italy meeting –
Possible replacement of VME Philippe Farthouat, CERN.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
AMBFTK Report AMBFTK: problems to solve Power distribution: Crates – compatibility with CDF crates? Thermal dissipation: Cooling Signals I/O:
ATLAS ATCA cooling evaluation project Claudio Bortolin (EP-ADO-PO) Michal Kalinowski (EP-ADO-PO) Lukasz Zwalinski (EP-DT-FS) ATLAS cooling team – 2016.
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
Status of the CERN ATCA specification and tender
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
Rack Design Proposal as of 01/03/2013
FTK infrastructure in USA15 Status and plans for 2015 A
AM system Status & Racks/crates issues
T1 Electronic status Conclusions Electronics Cards:
ATLAS Detector Controls
SCT/Pixel Draft Rack Layout rcj
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
Presentation transcript:

Status of integration in USA15

Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y A2 equipped with turbine cooling system and nominal 20kW power. All other racks should be equipped within Easter Fibers not yet put in final position. Storage boxes placed, lateral fiber trays available but not installed Rack Y A2 temporarily modified (side panels removed) to host a horizontally cooled ATCA crate for fiber validation

Hardware availability 20/03/2015FTK Italia - A. Lanza3 Two Wiener VME bins and two power supplies sent to the company in February for refurbishing. They should be back around Easter. At the moment only one Wiener bin and one power supply is available in USA15, but not used. They both will be sent to Wiener for refurbishing as soon as the others will be back A CDF VME bin was mechanically modified in the Pavia workshop to extend the rear cage to 28 cm. Capacitors on the 3.3V distribution lines on backplane were replaced to allow the use of 48V. This crate is now in USA15 The “old” CDF VME crate in rack Y A2 was replaced last Friday with the modified CDF crate. Now AMBSLP boards can be powered and tested in this crate

Status of Integration Projects 20/03/2015FTK Italia - A. Lanza4 New CAEN Power Supply Main specifications:  2 independent channels supplying 48V, 24V and 5V  Each channel total power 8.64kW/channel  INPUT voltage separated for each channel, 3-phase 5 poles  OUTPUT connectors made with M13 bolts, minimum distance among bolts 5 cm  External interface implemented by means of Ethernet protocol and manual display, or CANBus and manual display  Local/Remot controls: V/I monitor and ON/OFF for each voltage output  Dimensions are 19” large, 9U tall and 680 mm deep  EU conformity marking One sample ordered It will be delivered by next August There are two new projects in progress, in order to supply a full VME rack with one power supply of adequate power

Status of Integration Projects 20/03/2015FTK Italia - A. Lanza5 Custom fan unit  Fan chosen and ordered: Sanyo Denki 9GV1224P1J011, 24VDC (for compatibility with the Wiener HB), 6.35 m 3 /min max air flow [5.92 the HB], 360 Pa max static pressure [360 the HB], pulse sensor for speed monitoring [no HB], 25kHz PWM for speed control [no HB], expected lifetime 40k hours [35k for HB]. Cost in small quantities: 32.7 euro each (+ VAT) at Mouser  Mechanics is under ordering partly to Cern Stores and partly to a metal selling company (Colombo)  Electronics control and monitor under definition. Control and monitor will be implemented with an Arduino microcontrolled, costing 30 euros

Status of Integration Projects 20/03/2015FTK Italia - A. Lanza6 Custom fan unit – Arduino  controller

Thermal simulations of core crates and racks 20/03/2015FTK Italia - A. Lanza7 Ansys Icepack software requested to INFN CNAF. It should be available in April 5-licence pack ordered by CNAF, it costs 2610 euro. INFN Milano required one licence as well, so cost is decreased When the package will be available, the plan is to verify the results got by IMEC on the single crate, then to simulate a crate with two fans (one on bottom and the second on top), and finally to simulate one full rack

FTK ATCA Components 8 Three racks Four 14-slot ATCA shelves for DF in two racks −Full mesh fabric −Switch blade One 6-slot ATCA shelf for FLIC in one rack −Full mesh fabric −Processor blade 20/03/2015FTK Italia - A. Lanza

DF Rack Layout 9 Approved by electronics coordination Approved by technical coordination Fiber arrangement needed careful planning TURBINE HEAT EXCHANGER Closing panel ATCA 2 14 slots with 2 fan units (IM + DF) Closing panel HEAT EXCHANGER ATCA 1 14 slots with 2 fan units (IM + DF) Air deflector ATCA power supply (6000W) Closing panel Fiber storage Network switch Closing panel ATCA 2 14 slots with 2 fan units (IM + DF) Closing panel ATCA 2 14 slots with 2 fan units (IM + DF) Closing panel Front with fiber harness Rear with patch panel ROD FibersInter-board Fibers 20/03/2015FTK Italia - A. Lanza

DF Infrastructure 10 ASIS Vertical cooling 14-slot shelf tested by CERN −4 plus 1 spare Guardian 3U AC-DC converter (3KW per brick) tested by CERN −2 plus 1 spare (each with 3 bricks) Emerson switch blade, ATCA-F125 −4 plus 1 existing 20/03/2015FTK Italia - A. Lanza

FLIC Infrastructure 11 ASIS 6-slot shelf, 3X mesh − 1 plus 1 in testbed ADLINK ATCA-6150 processor blade (to be upgraded) 20/03/2015FTK Italia - A. Lanza

DCS Implementing the solution recommended by the ATLAS DCS coordination SNMP daemon on shelf manager in FTK ATCA shelves SNMP agent on FTK LCS to request data from shelf manager WinCC OA client on FTK LCS to connect to TDAQ SCS Working together with other subsystems (CSC ROD team, Tile sROD team, etc) Shelf manager communication FSM panel organization FSM state and status definition … … Testing at remote sites and CERN Integrating the communication with LAPP IMPC soon Developing a solution for power supply (Ethernet) 20/03/201512FTK Italia - A. Lanza