Company and family presentation – part 4 V-2009 (rev. VI-2012) (Part 00, PP 2007, animation+p/r : 2009.05.31) ready 1 Copyright notice Unauthorised copying.

Slides:



Advertisements
Similar presentations
Omega & Associates Engineering Ltd. Chilliwack Providing professional services to our clients with quality, cost effective AND innovative engineering solutions.
Advertisements

Benefits of an As-Needed Construction Management Services Contract CMAA NATIONAL CONFERENCE October 2009 Copyright © 2009 by R. W. Beck, Inc. All Rights.
TVI Resource Development (Phils), Inc. September Canatuan Tailings Management Completion of Stage 1 Tailings Management Facilties Gossan Dam and.
Measurement for Civil Engineering works
Soils - HDM Chapter 9 All pictures from HDM Ch 9.
Dounreay Nuclear and Chemical Land Contamination.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
CONSTRUCTION.
GABION PRESENTATION.
CE 120 Introduction to Civil Engineering
CE 120 Introduction to Civil Engineering
Understanding Geology and Its Engineering Properties… From A Civil Engineer’s Point of View… Dr.ÖZGÜR YILMAZER Geotechnical Engineer MSc. Geological Engineering.
Civil Engineering About 8 Different Subsets 1. Structures
Civil engineering branches & scopes
C ONTACT STRESS IN CIVIL ENGINEERING. Introduction 1 Skyscrapers Bridges Dams How are these constructions supported? Why are all these large constructions.
FROM UNDERGROUND … Address: 59, 3 rd September Str. GR 10433, Athens, Greece s:
Your logo کاربرد ژئوگرید در افزایش پایداری موج شکنها
TVI Resource Development (Phils), Inc. September Gossan Dam Embankment Construction Late July 2005 Placement of Core Zone Material. Placement of.
Managing Council’s Road Network for Better Outcomes Storm Damage Experience Ian de Bruyne Manager Program Planning & Delivery IPWEA Regional Forum 15 May.
CEE Civil and Environmental Engineering Department W. M. Kim Roddis, Ph.D., P.E. Department Chair.
19 February Summary: Updating on the activities completed (Done) since the last meeting List activities on going (Next steps) and related Actions.
Welcome to Tomcat Electro-Mechanical Specialists in Electrical Services since 1991.
Drift River Terminal - Emergency Flood Protection.
Current Research on Slope Stabilization with In-situ Reinforcement
بسم الله الرحمن الرحيم SUBJECT: Technical Research Group: Missions, Objectives, Plans and Priorities Prepared By: M.Hajimohammadi Rev.3.2.
1. 2 Civil Engineering Practice Introduction Instructor: Dr. Attaullah Shah Lecture # 1 Department of Civil Engineering Swedish College of Engineering.
© 2015 EarthCon Consultants, Inc. All rights reserved. This material may not be reproduced, displayed, modified or distributed without the express prior.
AN INTEGRATED DESIGN CONCEPT … … FROM UNDERGROUND UP TO THE TOP ODOTECHNIKI LTD CONSULTING ENGINEERS Address: 59, 3 rd September Str.
Decision Making and Data Management in Geotechnical Engineering
Situation in the Netherlands
19 February Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
Emergency Landslide Correction Benefits of a Contract Joey Franzino, P.E. INDOT Geotechnical Operations Engineer September 23, 2015.
Extreme engineering Extreme engineering – part 1 IX-2009 (rev. VI-2012) (Part 00 EE, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised.
Company and family presentation – part 5 V-2009 (rev. VI-2012) (Part 00, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised copying.
Part 10-2b Micropiles and self drilling rods in soil and rock engineering V-2009 (rev. XI-2012) (Part 10-2b, PP 2007, animation+p/r : compr.)
(Part 9-2e, PP 2007, animation+p/r: rev compr.
WELCOME.
Simple Sanitation Technology For Egypt Villages Prepared by Sameh Seif Ghali Executive Director Together Association For development and environment R.
Part 10-1b Micropiles and self-drilling rods in soil and rock engineering V-2009 (rev. XI-2012) (Part 10-1b, PP 2007, animation+p/r : compr.)
Part 11 Concrete repairs - sealing of cracks and waterproofing (Part 11, PP 2007, animation+p/r : DEMO) ready Copyright notice Unauthorised.
Extreme engineering Extreme engineering – part 2 IX-2009 (rev. VI-2012) (Part 00 EE, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised.
Part 10-2a Micropiles and self drilling rods in soil and rock engineering V-2009 (rev. II-2013) (Part 10-2a, PP 2007, animation+p/r : compr.)
Silesian Aviation Cluster as a representative of Polish aviation industry.
Part 16 Sequential and single sequence grouting with hybrid and semi-hybrid grouts VII-2009 (Part 16, PP 2007, animation+p/r : DEMO) ready 1.
Welcome to Condor Projects Ltd, a specialist contractor to the civil engineering industry with over 30 years experience
Foundation Repair in Kansas City
(Part 30, PP 2007, animation+p/r : short version compr.)
Concrete repairs in Dammam
Micropiles and self drilling rods in soil and rock engineering
(Part 66 short, PP 2007, animation+p/r compr.)
Part 75-2A Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.
Part 75-1D Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.
By Tomasz Najder, Ph.D Civ. Eng.
Concrete repairs, crack sealing
Drilling and sampling in foundation engineering
USDA -Natural Resources Conservation Service
Part 66/1 “Polyurethane resins in rock grouting and tunnel repairs”
Part 92_4 ”PUR in civil engineering – sealing of retaining walls”
Biological engineering and gabion constructions in coast protection
Part 75-4D Piles, steel-core piles and micropiles. Static test loadings. TNa micropiles.
New Licensing and Renewal Requirements
Christopher R. Bennett Darejan Kapanadze The World Bank
Part 75-3D Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.
Drilling and sampling in foundation engineering
Water projects under The Cohesion Fund.
PREPARED BY SK SOHEL, CE-3RD YEAR GUIDED BY JAYASHREE SENGUPTA
EAG346-Sem II 2014/2015 Lesson 2.
Various Fields in Civil Engineering By R.Janani
Drilling and sampling in foundation engineering
Earth and Rock fill Dams
Presentation transcript:

Company and family presentation – part 4 V-2009 (rev. VI-2012) (Part 00, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised copying of this presentation as whole or in parts in any form or by any means, electronic, photocopying, recording or otherwise, without prior written permision is prohibited.

ready 2 means …….

ready 3 Köpmangatan 22 Köpmangatan 11 now visit …. G allery Nord Amber

NAJDER engineering ®NAJDER engineering ® is a consulting company as well as a specialist contractor within civil and foundation engineering. We are preparing technical concepts, design projects, analyses and performing jobs as a subcontractor. Skånska Cementgjuteriet Skanska ABTomasz Najder joined in the period of Skånska Cementgjuteriet (today Skanska AB) as a member of Supervising Team on the project “Second Dry Dock in Gdynia Shipyard”. Stabilator AB Skanska Group Stabilator Sp. z o.o. Skanska Group Tomasz Najder gained his experiences in Stabilator AB (daughter company in Skanska Group) as site manager, project manager and internal consultant (”trouble-shooter”), as Production Manager (Stabilator AB- International Division in Poland), in Polish-Swedish company Stabilator Sp. z o.o. (Skanska Group) as Vice President and Executive Manager. Polibeton Sp. o.o. Najder engineering ® Polimark InternationalAnna Elżbieta Najder (wife) owned Polish company Polibeton Sp. o.o. and now Swedish Najder engineering ® since 1997 (until 2005 operating as Polimark International) – operating globally. Najder engineering ®Anna Monika Najder (daughter) together with Tomasz Najder (as the President of the Board and Executive Manager) owned Polish Najder engineering ® operating in Poland. Family Najder is working within mining, tunneling and civil engineering since six generations. Family and company history in civil engineering 4 ready

5 Daughter Anna Monika Najder Mama Anna Najder ready

6 ready

7 7 Foundation engineering and soil investigations. Reinforcement of existing foundations (underpinning) of industrial buildings, housing estates and ancient monuments (piling, anchors, injections). Rock stability and soil improvement (deep mixing method, high/low-pressure injection, lime-cement columns). Stabilization of slopes and embankments (geogrids, soil reinforcement, drainage, geotextile). Sealing of existing embankments, dams, dikes and waste deposits. Flood defense. Biological engineering, gabion constructions. Leakage and moisture counteraction (insulations, drainages, sealing injections, dilatation repair) in concrete and brickworks structures. Field of activity ready

8 ready …. newer complains when you engage us as grouters ……

9 9 Foundation engineering and soil investigations. Reinforcement of existing foundations (underpinning) of industrial buildings, housing estates and ancient monuments (piling, anchors, injections). Rock stability and soil improvement (deep mixing method, high/low-pressure injection, lime-cement columns). Stabilization of slopes and embankments (geogrids, soil reinforcement, drainage, geotextile). Sealing of existing embankments, dams, dikes and waste deposits. Flood defense.Sealing of existing embankments, dams, dikes and waste deposits. Flood defense. Biological engineering, gabion constructions. Leakage and moisture counteraction (insulations, drainages, sealing injections, dilatation repair) in concrete and brickworks structures. Field of activity ready

10 ready Restoring by grouting the sealing core at Hällby dam in Sweden

11 ready

Max. 800m. With additional pump and storage tank with agitator approximately 1600m. ready 12

Slurry production plant ready 13 For rental!

ready 14 Deep-Soil-Mixing to create the sealing core of the embankments (Żu ł awy polder in Poland)

ready 15 Deep-Soil-Mixing to create the sealing core of the embankments (Żu ł awy polder in Poland)

16 ready

17 ready Flood defence and restoring of embankments with gabions (Gdańsk in Poland)

18 ready Flood defence and restoring of embankments with gabions (Żu ł awy polder in Poland)

19 Foundation engineering and soil investigations. Reinforcement of existing foundations (underpinning) of industrial buildings, housing estates and ancient monuments (piling, anchors, injections). Rock stability and soil improvement (deep mixing method, high/low-pressure injection, lime-cement columns). Stabilization of slopes and embankments (geogrids, soil reinforcement, drainage, geotextile). Sealing of existing embankments, dams, dikes and waste deposits. Flood defense. Biological engineering, gabion constructions.Biological engineering, gabion constructions. Leakage and moisture counteraction (insulations, drainages, sealing injections, dilatation repair) in concrete and brickworks structures. Field of activity ready

20 ready Cost protection with longitudinal gabion structures at the Baltic See (Poland)

21 ready

22 ready

23 ready Coast “5’ to o’clock” – March 1993 Designer and responsible for delivery of gabions - the first site with gabions based on double twisted mesh (March 1993) First storm – April 1993 After completion of works – May 1993 After storm – April 1995 July 1996

24 ready

25 ready

26 ready

27 ready

28 2 m ready 2011

Thank You for Your attention! ready 29 THE END

ready Welcome to 30