Loop-Sectionalizing Automation Scheme Colin Hawthorne 4/26/2016.

Slides:



Advertisements
Similar presentations
Utility Needs and Smart Grid for Major Storm Events July 11, 2013 Edward Gray, PE Director – Transmission and Distribution Engineering.
Advertisements

Page 1 Outage Management Roy Hoffman 29 Jan 2001.
Electrical Installation
1 Smart Grid Vision Electric Grid Modernization Steering Committee Grid Facing Technology Subcommittee January 14, 2013.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Announcements Be reading Chapters 9 and 10 HW 8 is due now.
ADVANCED MANAGEMENT OF A CLOSED RING OPERATED MV NETWORK: ENEL DISTRIBUZIONE’S P4 PROJECT. Simone Botton, Roberto Calone, Luigi D’Orazio, Alessandro Fatica,
© Southwest Electrical Distribution Exchange (SWEDE) May 2, 2008 Materials and Equipment John Macek Application Director, S&C Electric.
Distributed Intelligence Provides Self-Healing for the Grid
Goshen Area Bus Reconfiguration
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
SmartGridCity™: A blueprint for a connected, intelligent grid community Presented to the Utah Public Service Commission May 13, 2009.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
RT3b – André Smit, Siemens USA
Spencer Murray, Sr. Telecom Eng. Distribution Automation.
Integrating Multiple Microgrids into an Active Network Management System Presented By:Colin Gault, Smarter Grid Solutions Co-Authors:Joe Schatz, Southern.
Keeping your Automated Devices Alive
Distribution Automation Plans in AEP Texas. Overview AEP Texas is deploying smart meters to roughly 1,000,000 customers The meters utilize Landis + Gyr.
1 Distribution Automation Survey Presented at SWEDE Conference 2005 By Kevin Clark.
DUCK RIVER EMC Lockout/Tagout Procedures For Overhead and Underground Line Work (De-energizing Lines and Equipment for Employee Protection)
Fault Hunting Using Three-Phase Reclosers Michael S. CostaJerome V. JoskenDennis A. Walder Eversource EnergyUC SynergeticEaton IEEE Rural Electric Power.
© ABB Group June 10, 2015 | Slide 1 1MRS A self healing power system for the accurate fault location and zone concept T&D Smart Grids Europe 2012.
Chapter 7 SYSTEM PROTECTION
Supervisory Systems.
SPS Mis-operation – DRAFT Proposal for ERCOT procedures.
1 AMI’s place in the future AMI is THE key enabler for the future smart grid The ‘intelligent grid’ is not intelligent without AMI Customers are not empowered.
AFCI Reaction to Utility Events. CenterPoint Energy 35 KV Distribution Capacitor Bank – Switched through an automated system.
Distribution Automation: Fault Detection, Isolation, and Restoration
1 Jon Sudduth Project Engineer, Intelligent Grid Deployment SWEDE April 26, 2011.
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
Frankfurt (Germany), 6-9 June 2011 ROSA – PT – S3 – 0249 EDP DISTRIBUTION AUTOMATION (r)EVOLUTION.
Endesa Colombia Our Distribution System In Front Of The Development Of Colombia.
© ABB PTMV - 1, ABB Overhead Distribution Systems.
Frankfurt (Germany), 6-9 June 2011  PV in Spain: Basically Large plants connected to MV or HV Mainly in rural areas (generation exceeds consumption) 3,000.
Power Systems Conference 2005 Clemson University Doug Staszesky Director – Product Management Automation Systems Division S&C Electric Company Automatic.
SWEDE 2014 Remote Monitoring of Faults – Frank Daniel (Oncor)
Oncor Electric Delivery Intelligent Grid at Oncor Electric Delivery SWEDE Conference Alan Bern – SCADA / Automation Manager May 1, 2008.
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
Doc.: IEEE /0121r1 Submission January 2010 Craig Rodine, Electric Power Research InstituteSlide 1 Some High-Level Smart Grid Requirements Date:
Lecture 22 Unbalanced Faults and Power System Protection Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Queensland University of Technology CRICOS No J Protection of distributed generation connected networks with coordination of overcurrent relays.
Lecture 22 Unbalanced Faults and Power System Protection Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Announcements Read Chapters 10 and 11
Jesus A. Guerra, P.E. Distribution System Reliability CenterPoint Energy SWEDE 2011.
NERC Lessons Learned Summary LLs Published in September 2015.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Metering Americas April 24, 2006 Advanced Metering.
ECE 498HZ: Power Distribution System Analysis
Copyright © Central Lincoln PUD and SEL 2015 Communications-Capable Fault Indicators Improve Outage Response for Coastal Oregon Shamus Gamache Central.
MCB Connor, Sunny, Kia. What does it do? A circuit breaker is an automatically operated electrical switch designed to protect an electrical circuit from.
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
April 7, 2015 Washington, D.C. Area Low-Voltage Event Operations Training Seminar 2016 Erik Johnson System Operations Training (ERCOT)
Microgrid Load Management and Operation Erich Keller G&W Electric Co. Frank Patton Jr., PE N. J. Shaum & Son, Inc.
Protection of Power Systems
CURRENT ® Smart Grid Overview July SMART GRID = ENHANCED FUNCTIONALITY Smart Grid delivers more than advanced metering infrastructures: -safe.
Lessons Learned Implementing an IEC based Microgrid Power-Management System October 12, 2015 Presented by: Jared Mraz, P.E.
Utility Needs and Smart Grid for Major Storm Events
Overhead Distribution Systems
Advanced Fuse-Saving Techniques
NERC Published Lessons Learned Summary
ECE 476 POWER SYSTEM ANALYSIS
Grid feeding monitoring relay
Chapter 7 System Protection
Irvine Smart Grid Demonstration Distribution Volt / Var Control
Distribution Circuit Automation Scheme Design
Cyber Security of SCADA Systems Remote Terminal Units (RTU)
Long Island Interconnection Working Group Meeting August 22, 2019
Presentation transcript:

Loop-Sectionalizing Automation Scheme Colin Hawthorne 4/26/2016

CNP Automation Scheme History Prior to 2010, the only automated switching devices installed on CNP’s grid were SCADA controlled pole-top switches and a mix of SCADA controlled and non SCADA controlled reclosers. In most cases, after a lock out event, our dispatch team would remotely operate these devices to restore power to the unaffected sections. This manual process requires diligent coordination with the truck crews and is ultimately very time consuming. Aside from protecting overhead equipment, these devices were installed to segment feeders that were performing poorly, splitting their customers and load in halves, thirds or quarters. With this in mind, our goal was to develop an automated scheme to improve restoration time. 2 Remote Controlled Pole-Top Switch (PTS)

Department of Energy Project From 2010 to 2013, the Department of Energy (DOE) Smart Grid Investment Grant (SGIG) contributed to an initiative to install newer types of reclosers as an attempt to further automate the grid. CNP strategically deployed over 500 of these newer reclosers throughout our service territory, initially concentrating on the urban portion of the service area, and then expanding to the poor performing and heavily populated circuits. Using these newer reclosers, we developed a more intelligent and secure device. 3

Intelligent Grid Switching Devices 4 IGSD is a term used for a recloser that can be programmed to operate as 2 of the following functionalities, which can be remotely toggled: Recloser Sectionalizer Remote Controlled Switch The Loop-Sectionalizing Scheme (LSS) is a supplement to these functionalities. LSS is used in overhead distribution circuits to automate the power restoration of the unaffected sections of a circuit after a protection device has locked-out.

What is Loop Sectionalizing? 5 The underlying logic of the LSS scheme is, by using IGSDs, a circuit can be automatically sectionalized, which is followed by closing the N.O. tie IGSD to restore power to the unaffected sections. This logic relies on the loss-of-voltage sensing capability and countdown timer of each IGSD. Enabling LSS on an IGSD will allow it to automatically operate a Close or Trip, depending on it’s normal configuration, after it sense a loss-of-voltage for a set amount of time. Normally closed IGSDs with LSS are usually set to operate a trip usually after 30 seconds. Normally open IGSDs with LSS are usually set to operate a close after 40 seconds.

Loop-Sectionalizing Scheme Simulation HOW DOES THE LOOP SECTIONALIZING SCHEME WORK? 6

LSS Fault Scenario 1: First Zone 7 LockedOut BACK UPBACK UP CKT #1CKT #1 BACK UPBACK UP CKT #3CKT #3 BACK UPBACK UP CKT #2CKT #2 L.O.V.TIMER(sec)

LSS Fault Scenario 2: Second Zone 8 LockedOut L.O.V.TIMER(sec) BACK UPBACK UP CKT #1CKT #1 BACK UPBACK UP CKT #3CKT #3 BACK UPBACK UP CKT #2CKT #2

LSS Fault Scenario 3: Third Zone 9 LockedOut L.O.V.TIMER(sec) BACK UPBACK UP CKT #1CKT #1 BACK UPBACK UP CKT #3CKT #3 BACK UPBACK UP CKT #2CKT #2

LSS Fault Scenario 4: Last Zone 10 LockedOut L.O.V.TIMER(sec) BACK UPBACK UP CKT #1CKT #1 BACK UPBACK UP CKT #3CKT #3 BACK UPBACK UP CKT #2CKT #2

Benefits Benefit metrics are based on outages where Loop-Sectionalizing was used. 11 Note these metrics are based on opportunities for savings, i.e., the more outages, the more opportunities to save.

Constraints The LSS devices operate independently. –Devices are time coordinated. –Close in on fault, then open and lockout immediately (normal business) Does not factor in temporary switching. –LSS needs to be disabled by our dispatchers when the circuits are temporarily switched. –Need to remember to re-enable LSS afterward. Necessary to wait for faults to investigate and test. Not applicable across entire system. –Shorter circuits –Fewer customers –Circuits that perform well 12

Lessons Learned: Example 1 For bi-directional open reclosers, issues can arise if both circuits have fault within a few seconds of each other. 13 Time Trip Close Fault on Ckt 1 Lockout Fault on Ckt 2 Closed and held L.O.V. Off L.O.V. On Breaker 1 Breaker 2 40 sec 0.1 sec 21 sec 20 sec 21 sec N.O. recloser closed too early

Lessons Learned: Example 2 1. A 3 phase fault occurred in Zone 1 of Circuit A. 2. The L.O.V. timers on all IGSDs, except IGSD 3, started counting once the fault occurred, and not after the breaker locked out seconds pass, then IGSD 1 and IGSD 2 opened before the breaker locked out. 4. Another 10 seconds pass, then all 3 open-tie IGSDs closed, also before the breaker locked out. 5. This resulted in a parallel tie established between two neighboring circuits in zone 3 and 4 of Circuit A. Question 1: Why did the L.O.V. timers start counting before the breaker operated? Question 2: Why did the L.O.V. timer not start on IGSD 3? 14

Lessons Learned: Example 2 Question 1: Why did the L.O.V. timers start counting before the breaker operated? Answer: The under-voltage pickup values for the L.O.V. timers were set too high, so the timers started counting when the 3 phase fault occurred, as oppose to when the breaker is opened. 15 Normal IGSD U.V. Setting Voltage during 3 ph fault Voltage Question 2: Why did the L.O.V. timer not start on IGSD 3? Answer: The under-voltage pickup for the L.O.V. timer on IGSD 3 was too low, different than the other IGSDs on Circuit A, so the timer never started counting.

Lessons Learned: Example 2 16 LockedOut BACK UPBACK UP CKT #1CKT #1 BACK UPBACK UP CKT #3CKT #3 BACK UPBACK UP CKT #2CKT #2 L.O.V.TIMER(sec) Going ThroughGoing Through Reclosing CyclesReclosing Cycles

Lessons Learned Through our trials, we have had to revise the device settings to account for various uncommon scenarios. Majority of failed LSS attempts have been due to temporary switching. This is corrected by turning off LSS when temporary switching is needed. 17

Next Steps Continue to test and analyze results Expand to other feeders and substations ADMS solution Peer to peer communications 18

Summary The Loop-Sectionalizing Scheme (LSS) is used to automate the power restoration of the unaffected sections of a distribution circuit after a protection device has locked-out. Have seen benefits of up to 5.9 million customer minutes saved. Loop-Sectionalizing is a scheme where: –Devices operate independently –Devices are time coordinated –It’s assumed that circuits involved are switched normally 19

Questions? 20