Showcase cost-saving practices, scale- appropriate technologies, and economic development opportunities and case studies from Idaho communities. Provide.

Slides:



Advertisements
Similar presentations
Green Infrastructure for Clean Water Act of 2009 H.R Becky Hammer – Associate Advocate, Water Program – Natural Resources Defense Council.
Advertisements

Fayette County Wastewater Management Plan October 6, 2005.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
Status of Wastewater Implementation February 20, 2013 Elizabeth Wood Monroe County, Sr. Administrator – Sewer Projects.
Berkeley Charleston Dorchester Water Quality Management (208) Program Vonie Gilreath, Regional Planner, BCDCOG Coastal Community Workshop February 7, 2006.
Stanlick Sewer Treatment Plant Upgrade Implementation Date: September 1, 2008.
Reuse / Revitalization. What is Reuse / Revitalization? Restoring contaminated and potentially contaminated sites to productive use.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
Article 41 Wastewater Planning Capacity Study To determine whether the Town will vote to adopt a resolution supporting the Town Manager’s allocation of.
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
0 Scoring Community Development Block (CDBG)Grants Water/Sewer Apps April 8, 2013 SEIRPC CDBG Scoring Committee.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
City of Modesto FY Proposed Budget Utility Funds Utility Planning & Projects Public Works Finance.
Presented to presented by East Central Florida Corridor Task Force Space Coast TPO 02/16/15 Huiwei Shen Systems Planning Florida Department of Transportation.
U.S. Conference of Mayors Urban Water Council Gulf Coast Water System Disaster Recovery June 29, 2006Walter Howard, SVP This document does not constitute.
South Carolina Finance Workshop for Small Water Systems June 4, 2013 Water Partnerships: Financial Advantages and Challenges SC Case Study: Lowcountry.
Lecture(2) Instructor : Dr. Abed Al-Majed Nassar
Municipal and Industrial Conservation and Water Reuse Workgroup Elizabeth Lovsted Sr. Civil Engineer Urban Water Institute Annual Water Policy Conference.
Financial Sustainability of Water, Waste Water, and Watershed Management THE TOOLS OF THE TRADE.
S.A.V.E. is a non-profit community organization whose aim is to sustain the southern Chester County region’s rural quality of life and community character.
Water Supply Planning Initiative State Water Commission November 22, 2004.
NARUC Summer Committee Meetings Committee on Water Water Supply Planning: East, West, North and South July 17,2007.
MAY | 12 | 2010 Cape Cod Comprehensive Economic Development Strategy (CEDS)
Orange County Utilities Department Water and Wastewater Budget Challenges March 9, 2010.
PLANNING FOR BROADBAND Sponsored by: Broadband Communities American Planning Association Sept, 2015 Presented by: Kathleen McMahon, AICP
1 Context Sensitive Design CE 453 Highway Design Iowa State University Howard R. Green Company.
Hawkin s Delafield & Wood LLP PARTNERSHIP GUARANTEES TO ENHANCE WATER CONSERVATION Presented by Rick Sapir (973) Presented.
Transit Revitalization Investment Districts Planning and Implementation of Act 238 of 2004 July 2006 Getting to TRID Lynn Colosi Clear View Strategies.
U.S. Department of Housing and Urban Development Roger Jacobs Field Office Director Sioux Falls Field Office 4301 West 57 th St., Suite 101 Sioux Falls,
Environmental Funding Opportunities George Stafford Deputy Secretary of State Dede Scozzafava Deputy Secretary of State.
Pretreatment 101 Training Course Sponsored by U.S. Environmental Protection Agency, States of Region 6 And the Region VI Pretreatment Association.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Environmental Literacy Plan Citizen’s Advisory Committee TO THE Chesapeake Bay Executive Council September 6th 2012.
Overview of Integrated Solid Waste Management (ISWM) Presentation made at the European Commission 7 th Framework Programme on Capacity Building Workshop.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
MORRIS MILL PROPOSED URBAN SERVICES DISTRICT Presentation to County Council September 17, 2013.
Phare 2003 Sector: Economic and Social Cohesion Title: Water Supply and sewerage in tourism and resort settlements.
Texas Water Development Board Financing Programs Presentation by Ignacio Madera, Jr. Office of Project Finance & Construction Assistance December 2, 2003.
Illinois Century Network Illinois Broadband Opportunity Partnership – East Central Project.
Equus Beds ASR Program A Case Study in Success Texas Innovative Water 2010 Seminar October 11, 2010 Texas Innovative Water 2010 Seminar October 11, 2010.
Investing In Our Future. Statement from Mayor Tom Murphy “The Gillette Regional Water Supply Project is essential for quality of life and economic development.
Withlacoochee Regional Water Supply Authority Withlacoochee Master Regional Water Supply Planning and Implementation Program (WMRWSPIP) Technical Review.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Urban water supply The privatization process in Mozambique
Reuse of Treated water for Aquifer Recharge in the East Snake River Plain Eric Collins, R.G. GSI Water Solutions, Inc. May 1, 2008 Waste.
Canaan Valley Tucker County, West Virginia Decentralized Wastewater Management Facility Plan July 28, 2005 Pio Lombardo, P.E Lombardo Associates, Inc.
Mejoras en los sistemas de Agua Potable y Saneamiento en San Benito, Texas Water and Wastewater Facility Improvements in San Benito, Texas.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
The SMART Goal, Program Concepts and Outcomes A NESC and RCAP partnered, EPA funded program using Social Marketing techniques to invigorate small community.
Fayette County Wastewater Management Plan February 14, 2006.
Road Map to the Future: The Consolidation of Sewer Infrastructure in Rutherford County, NC November 16 th, 2015.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
Water Supply Planning in Hampton Roads: Options for an Uncertain Future The State of Virginia’s Water Resources October 28, 2015 Whitney S. Katchmark,
1 Water Cooperative of Central Florida Utilities Department Orange County Board of County Commissioners July 26, 2011.
Brownfields Redevelopment Financing for Small Cities, Rural Communities And Tribes October 27-29, 2003 Sharon Kophs Washington State Department of Community,
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
COMMUNITY DEVELOPMENT RESOURCES, HELPING WISCONSIN SUCCEED 7 Rivers Alliance Rural Workforce Housing Summit June 1, 2016.
February 26, 2013 City of Sausalito Status Update on EPA Order Compliance (and new 2012 NPDES Permit)
Metropolitan North Georgia Water Planning District DRAFT Water Resource Management Plan Review
McLean County Regional Water Consolidation Project
North Texas Municipal Water District “Regional Service Through Unity … Meeting Our Region’s Needs Today and Tomorrow” Water Supplies Vital for the Future.
SEWER SERVICE FEE RATE STRUCTURE ALTERNATIVE
Water Reclamation Plant Feasibility Study Update May 28, 2014
Finance Options: Funding Water Infrastructure Projects George Bryan South Carolina Department of Health and Environmental Control State Revolving Fund.
Sludge Removal Requirements
Article 41 Wastewater Planning Capacity Study
City Council Business Meeting
Decentralized wastewater solutions in rural areas
Presentation transcript:

Showcase cost-saving practices, scale- appropriate technologies, and economic development opportunities and case studies from Idaho communities. Provide practical information to move from concept to funding and implementation. Facilitate networking and partnerships between communities, businesses, government and higher education.

Shelley lagoons at capacity Violate their NPDES permit Shelley initiated evaluation Shelley informally vetted regionalization January 2000 – Invitations extended to participate August Committee formed to apply for grant funds

Participating Entities Cities – Ammon & Shelley Cities – Firth & Basalt District – IBSD Counties – Bingham & Bonneville Private – Melaleuca, AndCo, Basic American Facilities Planning Study Evaluate feasibility of wastewater treatment on a regional basis Determine cost to end user

Manage high growth in counties, Provide geographical alternatives for economical development Develop long-range planning tool to better protect the ground and surface water resources Reuse of effluent integral to water conservation, Increase reliability of compliance Eliminate political barriers Increase environmental protection for each participating entity as well as non-participating entities in the surrounding region

Regional System was Feasible One Treatment Plant in Shelley Transmission Lines from: Ammon Basalt/Firth Exit 113 Industrial Pretreatment Cost per user ~ $36/month

Develop a funding package Adequate to meet expenses Proportional to each entity Fair to the individual customer Acceptable to the patrons Organize a formal entity Combined resources Preserved community identity Facilitated management of the system Overcome the loss of one partner

2004 JPA developed EIRWWA officially formed Revised FPS submitted to DEQ IBSD formally withdrew EPS grant secured from EPA for preliminary design tasks 2005 DEQ approval of FPS 2006 ACOE money authorized for project

Project 1 N. Interceptor Project 2 Oxbow WWTP Project 3 E. Interceptor Oxbow WWTP Exp. Project 4 S. Interceptor Project 5 Industrial Pretreatment W. Interceptor

One Entity = One Vote EIRWWA will own and operate WWTP Participating entities may own and operate their own collection systems Fees assessed based on proportionate flow volumes Participating entities may bill their own customers

Public/Private Partnership 24” pipeline from City of Shelley to Exit 113 Funding from ED grant and private sector Designed, constructed & operational

Public/Private Partnership Extend collection system north and east Funding from ED grant and private sector Designed, constructed, and operational

Membrane Bioreactor - Siemens 2.0 to 8.0 MGD capacity Class A reuse BDP 2.0 meter belt press

Design funded by EIRWWA and ACOE 14-mile pipeline 30-inch through 48-inch diameter 14-mile pipeline 72-inch boring Hwy. 91 and UP Railroad 15 canal crossings

Shelley lagoons violated NPDES permit Rampant growth in Ammon Growth pressure for rural subdivisions Concerns about o water quality in Snake River o sole source aquifer

Financial hurdles Project funding Phased project Unique methods Innovative materials Public/private partnerships P3 Joint powers ENR CCI DJIA EIRWWA

Method Pre-selection of Equipment Equipment Siemens MemPulse MBR Material ConTech DuraMaxx pipe

Modular plant design River crossing Test section for pipe selection Pipe alignment

Constructed in dewatered lagoon cell Constructed in abandoned UP Railroad ROW Housed in buildings Multiple borings

Cost Savings & Economic Development Over $8M Savings Over 150 documented jobs Business expansion Funding to Implementation Multiple Sources Community Commitment Public – Private Partnership Public Infrastructure – Private Investment