Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.

Slides:



Advertisements
Similar presentations
Institute of Energy and Sustainable Development HVAC S YSTEMS E NERGY D EMAND VS. B UILDING E NERGY D EMAND I VAN K OROLIJA I NSTITUTE OF E NERGY AND S.
Advertisements

Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
DOUG BOSWELL MECHANICAL OPTION APRIL 16, 2008 Temple University Tyler School of Art.
Kevin Edstrom Mechanical Option 2011 Senior Thesis April 12 th, 2011 Georgetown University New Science Center Washington, DC.
1Taylor Engineering, LLC Group Think Mark Hydeman, P.E., FASHRAE Taylor Engineering, LLC
Chilled Beam Presentation
STEM Center Delaware County Community College – Media, PA Thesis Final Presentation Dan Saxton Mechanical Option.
Energy in Focus Energy Savings with Water Based Systems By Maija Virta Specialist of Indoor Environment Technology.
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
Jacksonville, FL The Pennsylvania State University Department of Architectural Engineering Zachary Polovchik Mechanical Option Advisor – Dustin Eplee Duval.
WESTINGHOUSE ELECTRIC NUCLEAR ENGINEERING HEADQUARTERS DANIEL AUGHENBAUGH - MECHANICAL OPTION Westinghouse Nuclear Engineering Headquarters Daniel Aughenbaugh.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
PSU Building Thermal and Mechanical Systems Laboratory Environment A/E Kurt M. Shank, M.S. & Stanley A. Mumma, Ph.D., P.E. College of Engineering Department.
Science & Technology Center. Chestnut Hill Academy - Philadelphia, PA David Klug. Mechanical Option. Advisor - Dr. Freihaut April 15 th, 2009 Architectural.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
BENTLEYVILLE, PENNSYLVANIA KYLE COURTNEY | MECHANICAL OPTION | DUSTIN EPLEE.
North Pocono High School
DEA Clandestine Laboratory Training Center Penn State University Architectural Engineering Mechanical Option David M. Potchak.
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
CENTRAL HIGH SCHOOL Central High School MID-ATLANTIC REGION ADAM BROWN MECHANICAL OPTION SPRING 2014 Introduction Existing Mechanical System Thesis Proposal.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
SENIOR THESIS PRESENTATION
Energy Efficient System Design: Geothermal System Coupled with Chilled Beams and DOAS Montgomery College New Science Center.
City of Hope Amini Medical Center Christopher Bratz Pennsylvania State University Architectural Engineering Mechanical Option Faculty Advisor: Dr. Jelena.
Architectural Engineering Mechanical Option Ft. Detrick Defense Medical Logistics Center Building Systems Redesign April 16, 2008 Senior Thesis Presentation.
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
Ray & Joan Kroc Corps Community Center Mathias Kehoe | Mechanical Option April 09, 2012.
Hilton Hotel at BWI Airport Nathan Patrick The Pennsylvania State University Architectural Engineering – Mechanical Option.
Army Reserve Center Newport, Rhode Island Alexander Hosko Mechanical Option.
UNIFIED SCIENCE CENTER THE UNIVERSITY OF SCRANTON SCRANTON, PA DALE E. HOUCK MECHANICAL OPTION.
Des Places Residence Hall Duquesne University Pittsburgh, PA Peter Edwards – Mechanical Option Advisor - Dustin Eplee Des Places Residence Hall Senior.
Bronx School for Law Government & Justice Yulien Wong Mechanical Option 2006 Senior Thesis Bronx, New York.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Spring 2007 Senior Thesis Justin D. Schultz Mechanical Option The Hauptman-Woodward Medical Research Institute Dedicated Outdoor Air Applications at the.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP.
Jonathon Gridley Senior Thesis – Spring 2007 Mechanical Option Energy Efficient Mechanical System Alternatives South Jefferson High School S OUTH J EFFERSON.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Straumann USA 60 Minuteman Road Andover, MA Kevin Kaufman Mechanical Option The Pennsylvania State University Architectural Engineering.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
INOVA Fairfax Hospital South Patient Tower Falls Church, VA Senior Thesis 2012 Mike Morder Mechanical Option Advisor: Dr. William Bahnfleth.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Twin Rivers Elementary/Intermediate of McKeesport Area School District Tessa Bauman Mechanical Option Technical Consultant: Laura Miller 1600 Cornell St.,
Britt Kern Mechanical Option Advisor: Dr. Treado Hunter’s Point South School Queens, New York.
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
Alexander Radkoff Mechanical Option | Spring 2014 Advisor: Dr. Stephen Treado 123 Alpha Drive Pittsburgh, Pennsylvania
NOLAN JAMES AMOS Dr. William Bahnfleth, Faculty Consultant architectural engineering senior thesis mechanical option PHOENIXVILLE EARLY LEARNING CENTER.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Harley-Davidson Museum
Technology in Architecture
ENVIROCENTER PHASE II JESSUP, MD
Eastern High School Baltimore, MD
David Anderson Mechanical Option
Grunenwald Science and Technology Building
Feasibility of Ice Storage
Senior Thesis Presentation
LED Savings and Simple Payback at the Music Building
Lehigh Valley Heritage Center
Located at Tufts University in Boston, Massachusitts
Professor of Architectural Engineering College of Engineering
Objective Revie the Cooling Cycle Learn about air distribution systems
Presentation transcript:

Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences Building Garden City, NY

Introduction Summary Life Sciences Building Mechanical System Depth 1: Decentralized Air System Depth 2: Chiller Plant Design Breadth 1: Daylighting Conclusion Acknowledgements Questions 20% decrease in first cost with chilled beam & dedicated outdoor air system 50% reduction in supply air 18% increase in chilled water flow 26% decrease in energy* Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option $26,000 lower first cost with variable primary flow $1,500 annual energy savings with variable primary flow

Introduction Summary Life Sciences Building Mechanical System Depth 1: Decentralized Air System Depth 2: Chiller Plant Design Breadth 1: Daylighting Conclusion Acknowledgements Questions Architect:Cannon Design Structural:Cannon Design M/E/P/FP:Cannon Design CM:Jacobs Project Management Co. Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option Size72,400 Square Feet Occupancy:Classrooms/Laboratories/Offices Levels:3/Penthouse/Basement Cost:$30 Million Construction Dates:March 2010 – January 2012

Introduction Summary Life Sciences Building Mechanical System Depth 1: Decentralized Air System Depth 2: Chiller Plant Design Breadth 1: Daylighting Conclusion Acknowledgements Questions Campus High Temperature Hot Water – 270°F Heat Exchangers – 180°F Direct to Air Handling Units Campus Chilled Water - 42°F Booster Pumps Direct to all coils Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option Classrooms/Offices 25,550 CFM VAV with Terminal Reheat Laboratories VAV with Supply Valves and Reheat Fume Hoods Glycol Heat Recovery Run-Around Loop Laboratory Exhaust 3 Fans with a minimum discharge of 4,000 FPM Heat Recovery

Introduction Depth 1: Decentralized Air System Design Energy/First Cost Life Cycle Depth 2: Chiller Plant Design Breadth 1: Daylighting Conclusion Acknowledgements Questions Offices Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option Classrooms 100 ft 2 9’-1” Ceiling 1 Occupant Glass Curtain Wall 1,100 ft 2 9’-1” Ceiling 36 Occupants Glass Curtain Wall or Window

Introduction Depth 1: Decentralized Air System Design Energy/First Cost Life Cycle Depth 2: Chiller Plant Design Breadth 1: Daylighting Conclusion Acknowledgements Questions Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option

Introduction Depth 1: Decentralized Air System Design Energy/First Cost Life Cycle Depth 2: Chiller Plant Design Breadth 1: Daylighting Conclusion Acknowledgements Questions Obtain design hourly cooling load predictions Select Similar Pump/Fan model Create regressions illustrating equipment Curve Model Use regressions to determine power Apply utility rate structure Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option

Introduction Depth 1: Decentralized Air System Design Energy/First Cost Life Cycle Depth 2: Chiller Plant Design Breadth 1: Daylighting Conclusion Acknowledgements Questions Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option

Introduction Depth 1: Decentralized Air System Design Energy/First Cost Life Cycle Depth 2: Chiller Plant Design Breadth 1: Daylighting Conclusion Acknowledgements Questions Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option

Introduction Depth 1: Decentralized Air System Design Energy/First Cost Life Cycle Depth 2: Chiller Plant Design Breadth 1: Daylighting Conclusion Acknowledgements Questions Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option

Introduction Depth 1: Decentralized Air System Design Energy/First Cost Life Cycle Depth 2: Chiller Plant Design Breadth 1: Daylighting Conclusion Acknowledgements Questions Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option

Introduction Depth 1: Decentralized Air System Design Energy/First Cost Life Cycle Depth 2: Chiller Plant Design Breadth 1: Daylighting Conclusion Acknowledgements Questions New Chilled Beam/DOAS - $1,000,000 Smaller Air Handling Unit Less VAV Boxes Less Ductwork No Finned Tube Radiation Extra Piping Add Desiccant/Sensible Wheels Add Pump 20% Less First Cost Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option Existing VAV with Terminal Reheat - $1,254,000 Large Air Handling Unit Many VAV Boxes Much Ductwork Less Pumps Less piping

Introduction Depth 1: Decentralized Air System Design Energy/First Cost Life Cycle Depth 2: Chiller Plant Design Breadth 1: Daylighting Conclusion Acknowledgements Questions VAV with Terminal Reheat 30-year NPV: $1,628,000 Chilled Beam with Dedicated Outdoor Air System 30-year NPV: $1,470, % Lower LCC with Chilled Beam/DOAS Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option

Introduction Depth 1: Decentralized Air System Depth 2: Chiller Plant Design Design Energy/First Cost Life Cycle Breadth 1: Daylighting Conclusion Acknowledgements Questions Equipment Carrier 270 Screw Chiller Bell & Gossett Base-Mounted Pumps Marley Cooling Tower Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option

Introduction Depth 1: Decentralized Air System Depth 2: Chiller Plant Design Design Energy/First Cost Life Cycle Breadth 1: Daylighting Conclusion Acknowledgements Questions Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option Obtain design hourly cooling load predictions Create regressions illustrating equipment Chiller - California Energy Commission Cooling Tower/Pump - Curve Model Use regressions to determine power Apply electric rate structure

Introduction Depth 1: Decentralized Air System Depth 2: Chiller Plant Design Design Energy/First Cost Life Cycle Breadth 1: Daylighting Conclusion Acknowledgements Questions Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option

Introduction Depth 1: Decentralized Air System Depth 2: Chiller Plant Design Design Energy/First Cost Life Cycle Breadth 1: Daylighting Conclusion Acknowledgements Questions Primary/Secondary - $243,000 Extra set of pumps More Piping Variable Primary Flow - $217,000 Less Pumps Less Piping 11% decrease in first cost Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option

Introduction Depth 1: Decentralized Air System Depth 2: Chiller Plant Design Design Energy/First Cost Life Cycle Breadth 1: Daylighting Conclusion Acknowledgements Questions Primary/Secondary 30-year NPV: $1,231,000 Variable Primary Flow 30-year NPV: $1,161,000 6% Lower LCC with VPF Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option

Introduction Depth 1: Decentralized Air System Depth 2: Chiller Plant Design Breadth 1: Daylighting Objective Analysis Conclusion Acknowledgements Questions Life Sciences Building Design Goals LEED Credit % of regularly occupied spaces between 25 fc and 500 fc. September 21 at 9am and 3pm Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option

Introduction Depth 1: Decentralized Air System Depth 2: Chiller Plant Design Breadth 1: Daylighting Objective Analysis Conclusion Acknowledgements Questions Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option September 21 st 9 am 1 st floor N

Introduction Depth 1: Decentralized Air System Depth 2: Chiller Plant Design Breadth 1: Daylighting Objective Analysis Conclusion Acknowledgements Questions Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option September 21 st 9 am 2 nd floor N

Introduction Depth 1: Decentralized Air System Depth 2: Chiller Plant Design Breadth 1: Daylighting Objective Analysis Conclusion Acknowledgements Questions Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option September 21 st 3 pm 1 st floor N

Introduction Depth 1: Decentralized Air System Depth 2: Chiller Plant Design Breadth 1: Daylighting Objective Analysis Conclusion Acknowledgements Questions Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option September 21 st 3 pm 2 nd floor N

Introduction Depth 1: Decentralized Air System Depth 2: Chiller Plant Design Breadth 1: Daylighting Objective Analysis Conclusion Acknowledgements Questions Conclusion 1 st floor, 9am – non-compliant 73% at 9am 82% at 3pm Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option

Introduction Depth 1: Decentralized Air System Depth 2: Chiller Plant Design Breadth 1: Daylighting Conclusion Acknowledgments Questions Decentralized Air System $254,000 decrease in first cost 20% higher annual energy cost 9.7% smaller LCC P/S vs. VPF $26,000 decrease in first cost with VPF 5% decrease in annual energy cost with VPF 6% smaller LCC with VPF Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option

Introduction Depth 1: Decentralized Air System Depth 2: Chiller Plant Design Breadth 1: Daylighting Conclusion Acknowledgements Questions Dr. James FreihautFaculty Advisor, Penn State Dustin EpleeFaculty Advisor, Energy Wall Jan GasparecMechanical Engineer, Cannon Design Eric LindstromMechanical Engineer, Cannon Design Mike KirkpatrickElectrical Engineer, Cannon Design Dr. William BahnflethMechanical Instructor, Penn State Dr. Jelena SrebricMechanical Instructor, Penn State Moses LingMechanical Instructor, Penn State Michael Reilly Sr.Owner, Reilly Plumbing & Heating AE Friends Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option

Introduction Depth 1: Decentralized Air System Depth 2: Chiller Plant Design Breadth 1: Daylighting Conclusion Acknowledgements Questions Michael Reilly, Jr.Nassau Community College Life Sciences BuildingMechanical Option

Primary/Secondary Variable Primary Flow

Chilled Beam Chilled Water Pumping Schematic

Dedicated Outdoor Air Unit Schematic

Architectural Breadth/ Daylight Shading

Chiller Plant Location

DOAS Pump CurveDOAS Unit Fan Curve