Automation and Drives A&D SD Customer Service & Support A&D SD CST 20/11/04 1 of 13 10A Control Board Exchange.ppt Introduction Procedure Setting up Exchanging.

Slides:



Advertisements
Similar presentations
Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
Advertisements

Introduction. Introduction: Things to Prepare before Assembly Anti-static wrist strap Set of screwdrivers and pliers Piece of cloth CPU Thermal compound.
Zebra® 105SL™ * Removing and Installing Printhead
Replacing the Maintenance Kit HP Printers OIT lab services.
1 Stripe 400/600 Removing and Installing Printhead Printhead Resistance Calibration Toggle Position Adjustment.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Assembly Manual Mike Fortney 04/09/2004 CricketSat Receiver.
Servicing Welch DRYFAST ULTRA Pump Models 2032
Optical Manufacturing Solutions 1 Probe Assembly.
ModICE Modular Integrated Connector Enclosure
Electronic Voting Machine EVM – ECIL 2001 Model 1 Election Commission of India Training on Use of Electronic Voting Machine.
Yamaha oil pump rebuild
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
3” BACKWASH VALVE WITH SUPERSTAR ACTUATOR BASIC SERVICE MANUAL Does not apply to PLC-MP version SUPERSTARS.
Mounting instruction – Hi-Fi-Series – HE-01 / HE-02 Specification : Color: black / silver Measurement: 445 x 460 x 135mm (w x d x h) Material: all-aluminium.
ES1000C/1500C Battery Replacement Procedure. 1.Pull off the front panel.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
1 Zebra 170 XiIII Plus Removing and Installing Printhead Calibrating Head Resistance Print Quality Adjustments.
The Handling Camera1 Trainer Training The Handling Camera.
System X 3500 Fan Cage Removal Here are some basic steps and helpful hints.
L2000 Technical Training 6. Assemble/Disassemble.
Team 2 Tyler Brun Ashlea Krupa Seung Ho Park Gage Hermanson.
Conceptual Design Presentation ME 4182 Team: Guys Engineering Nathan Bessette, Rahul Bhatia, Andrew Cass, Zeeshan Saiyed, Glen Stewart YJ Chok.
Universal Holding Cabinet Two screws hold each side; four screws secure the top.
Unlatch and open the instrument door. Removing the Recorded Tape.
Adding to your Diagnostic Station Adding to your Diagnostic Station.
DC234KL Dust Extraction Adaptor rebuild Reason for change –In 2010 a cordless dust extraction unit was brought to the market. –When connecting the cordless.
1 © 2011 Profile Recorder for ProtoFlow S Installation Instruction.
Building a Computer Kate Chapin Capstone Project.
Service Seminar Model MB4.
TP4-ENERSOL-TD/PV double function
Service Bulletin 161 SUBJECT: Upgrade to current production level UNITS:D27105 DATE CODE RANGE: All units up to date code to be checked ISSUED.
Assembling a Computer Safety Precautions CPU Installation
We Design It Replacing Hard Drives Tutorial Seven Easy Steps By: James Landon Carie Jackson Odetta Rodriguez Michelle R. Person Miceala Vega.
Election Commission of India
Building a PC Tim Wells. What You Need Required:  Case  Power Supply  Motherboard  Processor & CPU Fan  RAM  Graphics Card  Hard Drive  Keyboard.
PC Assemble & Disassemble Trey, Josh, Jin-young. Step1. Checking PC Before performing disassemble, make sure the PC is working properly.
ELECTRONIC VOTING MACHINE (EVM) Presented by: Miss.Kenyir Olga Nongrum, NIC for Election Dept.Jowai.
Removing and Replacing the Battery Cover 1. Ensure the phone is turned off. 2. Press the Battery cover locker; lift the battery cover up and away from.
Introduction to EVM It is a reliable machine for conducting Elections. Has mainly 2 units: Ballot and Control Units. Operates on a Special Battery.
Reliability MANUAL CARTRIDGE UNLOAD Super DLT1 Presented By Quantum Technical Services.
Computer Disassembly and Reassembly Presentation by: James Hinton, Derrick Sartain, and Steve Evans.
PS500B/800B Battery Replacement Procedure. 1.Remove the two screws at the bottom of the front panel. 2.Push down then remove the front panel.
PS1500B Battery Replacement Procedure. 1.Pull off the front panel.
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
Adding to your Diagnostic Station Adding thermometry The temperature module attaches to the top of the BP module. It is made up of the following two.
Port Throttle Solution Does your port throttle drop back when you remove your hand. Here is the fix….and it costs nothing! me with any questions:
Gates automation. Summary  Choosing the appropriate model  Faac Product Range (Sliding Gates)
(612) Slide No: 1 RDM CONFIDENTIAL Intuitive Circuit controller PR0650 CCT.
Remove 4 Phillips screws that hold tape drive cover (2 on each side) Phillips screws.
IOPtiMate™ OT-135P2 Technical Training – Part I System Description, Installation & Operation IOP (07)
Chapter 23 Interior Repairs. Objectives Identify the major parts of a vehicle’s interior Remove and replace seats, seat covers, and carpeting Service.
ELECTRONIC VOTING MACHINE (EVM)
PostBase Automatic Feeder Component Removal Service Training
ModICE Modular Integrated Connector Enclosure
Drives Training Foils Encoder Module Installation
Easy Reach 7.0 Honda Element 2003
Easy Reach 7.0 Honda Element 2003
Maintenance masterdrive siemens
Simple Way to Install Auto Lock Door in Car
6. Disassembly & Reassembly
HYBRID COOKTOP.
Dave Mawdsley, DACS Member, Linux SIG January 16, 2013
Reader Swap out Guide.
Filling of SAPPHIRE 25 & 42 Bar Systems (TFPP Hardware)
Bharat Electronics
Setting up of EVMs & VVPATs
Beginner Stander Presentation
Presentation transcript:

Automation and Drives A&D SD Customer Service & Support A&D SD CST 20/11/04 1 of 13 10A Control Board Exchange.ppt Introduction Procedure Setting up Exchanging a Control Board Drives Training Foils © Siemens AG, A&D SD CS Congleton, 2004

Automation and Drives A&D SD Customer Service & Support A&D SD CST 20/11/04 2 of 13 10A Control Board Exchange.ppt Introduction Procedure Setting up Introduction Firmware, Power Stack setting and Parameter settings. The control board contains the firmware, the Power Stack setting and the parameter settings. Detailed information concerning this software is given in elsewhere. In summary: The firmware is fixed in the control board and cannot be reprogrammed; changing the control board may change the firmware issue. The correct power stack setting must be checked. See later for details. The parameter settings of the customer may need to be uploaded and reloaded.

Automation and Drives A&D SD Customer Service & Support A&D SD CST 20/11/04 3 of 13 10A Control Board Exchange.ppt Introduction Procedure Setting up Procedure Changing the control board The control board is easy to exchange. On frame sizes A,B,C and PX drives the board is directly under the display panel; on D,E,F the board is in the options well, and a short extension is used to connect to the display. 1.If the existing control board is functional, upload the existing parameter set using Drivemonitor. Note the software issue (r0018) 2. Switch off the power and disconnect the supply. Wait 5 minutes.

Automation and Drives A&D SD Customer Service & Support A&D SD CST 20/11/04 4 of 13 10A Control Board Exchange.ppt Introduction Procedure Setting up 3. Remove the display panel (different panels may be fitted) by pressing the button on top the drive Procedure

Automation and Drives A&D SD Customer Service & Support A&D SD CST 20/11/04 5 of 13 10A Control Board Exchange.ppt Introduction Procedure Setting up 4. On D,E,F drives, remove the metal cover by undoing the Torx 20 fixing. On frame size A units remove the plastic cover by sliding it down and lifting. On frame sizes B and C remove the larger plastic cover first. On Px frame sizes the mounting is similar to FSA Procedure FSD, E, F FSA,B,C FSB,C

Automation and Drives A&D SD Customer Service & Support A&D SD CST 20/11/04 6 of 13 10A Control Board Exchange.ppt Introduction Procedure Setting up 5. On D,E,F drives, remove the interconnecting cable from the adaptor plate, then press the blue button upwards, and at the same time lift the adaptor from the i/o board. Procedure

Automation and Drives A&D SD Customer Service & Support A&D SD CST 20/11/04 7 of 13 10A Control Board Exchange.ppt Introduction Procedure Setting up 6. Remove the i/o board by levering the board upwards using a terminal driver. Procedure

Automation and Drives A&D SD Customer Service & Support A&D SD CST 20/11/04 8 of 13 10A Control Board Exchange.ppt Introduction Procedure Setting up 7. Remove the spring catch and button by lifting the spring out. Wear eye protection and be careful not to lose the parts. The two pips on the button are upwards (i.e visible) for re- assembly Procedure

Automation and Drives A&D SD Customer Service & Support A&D SD CST 20/11/04 9 of 13 10A Control Board Exchange.ppt Introduction Procedure Setting up 8. The plastic cover over the control board may now be removed. There are seven retaining clips; remove the bottom one first and work around the rest. Lift the plastic part clear. Procedure Hook at bottom of the cover; push to lift the cover.

Automation and Drives A&D SD Customer Service & Support A&D SD CST 20/11/04 10 of 13 10A Control Board Exchange.ppt Introduction Procedure Setting up 9. Undo the Torx 20 screw at the top of the control board, and lift the fastener and spring clear. The control board may now be removed. Ease the control board carefully away from the connector on the left of the board and lift clear. Procedure Spring sits in slot to stop rotation.

Automation and Drives A&D SD Customer Service & Support A&D SD CST 20/11/04 11 of 13 10A Control Board Exchange.ppt Introduction Procedure Setting up 10. Fit the new control board carefully onto the connector and push into position. Reassembly using the reverse procedure. Take care in particular: To fit the control board onto the connector properly. To fit the fixing screw and clip so the spring doesn‘t rotate To push the control board cover into postion To refit any Operator Panel correctly Procedure

Automation and Drives A&D SD Customer Service & Support A&D SD CST 20/11/04 12 of 13 10A Control Board Exchange.ppt Introduction Procedure Setting up After complete reassembly, apply power to the drive. Read parameter r0200 and note the value. Check that P0201 is the same value. If not, set it to the same value, and cycle the power. Power Stack Data only needs reprogramming if other boards within the drive are also changed. Check parameter r0018 is the correct Software issue. Download the parameter settings to the Drive using Drivemonitor as described elsewhere. Check out and commission the Drive Setting up the new control board

Automation and Drives A&D SD Customer Service & Support A&D SD CST 20/11/04 13 of 13 10A Control Board Exchange.ppt Introduction Procedure Setting up Siemens AG Standard Drives Martin Brown A&D SD CS Congleton