MEBT status A. Shemyakin for the PXIE warm front end group PIP-II technical meeting January 20, 2015.

Slides:



Advertisements
Similar presentations
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
Advertisements

C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Novel Beam Diagnostics on PXIE Vic Scarpine, FNAL 2nd Annual PASI Meeting April 3-5, 2013.
Project X Injector Experiment (PXIE) Steve Holmes Fermilab Proton Accelerators for Science and Innovation: Second Annual Meeting Rutherford Appleton Laboratory.
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
 An h=4 (30 MHz) RF system will be used for electron operation. For protons, this would correspond to h=56, and the 1 kV maximum gap voltage would only.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
ITS Subsystems Availability MACS Week, June 2011 E. Sargsyan PP a-ESA_ITS_MACS_Week_June2011.pptm E. Sargsyan ITS Subsystems Availability 1.
MEBT & RT CH Section Thomas Page Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
Managed by UT-Battelle for the Department of Energy SNS MEBT : Beam Dynamics, Diagnostics, Performance. Alexander Aleksandrov Oak Ridge National Laboratory.
ESS DTL beam commissioning
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
Project X Overview L. Prost (for the Project X team) FNAL Accelerator Physics forum CERN June 17, 2013 Many slides taken from V. Lebedev, S. Nagaitsev,
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Overview of Electron Cooling Activities at FNAL Thomas Kroc Fermilab – Electron Cooling EIC 2004 March 15-17, 2004 Jefferson Lab.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Laser Notcher Status Dave Johnson PIP Meeting June 26,2012.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
Developments of the FETS Ion Source Scott Lawrie.
Low Energy RHIC e - Cooling Meeting Minutes – 12/23/ Cooling Section: –LF Solenoids:  At PPM, G. Woods has assigned buyer, SOW will be revised,
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
FLS2010 Workshop, Stanford, March 1-5, 2010 Florian Loehl (Cornell University) Commissioning of the High Current ERL Injector at Cornell Florian Loehl.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
PXIE Ion Source and LEBT Installation Status L. Prost, B. Hanna, R. Andrews Project X Technical Meeting October 29 th, 2013.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
PS-ESS and LEBT State of the art Lorenzo Neri Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
ApEx needs for CeC PoP Experiment December 11, 2015.
PXIE LEBT Status Update Lionel Prost PIP-II “Friday” Meeting January 16 th, 2015.
PIP-II R&D Program PXIE Ion source and LEBT Lionel Prost PIP-II Machine Advisory Committee Meeting March 2016.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
PXIE absorber test bench A. Shemyakin, C. Baffes, K. Carlson, B. Hanna, L. Prost, J. Walton November 6, 2012 Project X meeting Test bench description Difficulties:
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
PXIE Beam Instrumentation Status Update Vic Scarpine Weekly PIP-II Meeting June 7, 2016.
Warm Front End Concept A. Shemyakin PIP-II Machine Advisory Committee 9-11 March 2015.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
PXIE Medium Energy Beam Transport status What has happened since the April’12 collaboration meeting A. Shemyakin Project X collaboration meeting November.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
D. Li, Project X Collaboration Meeting, Fermilab (October 25-27, 2011) Overview of Project X Frond-End R&D at LBNL Derun Li Project X Collaboration Meeting.
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
Overview of Present and Future Laser Diagnostics for Fermilab H- Accelerators Vic Scarpine, Fermilab Presenting for the H- laser diagnostics team 26 Sept.
Integration of HWR, SSR1, and Cryo in the PXIE enclosure Curt Baffes PIP-II Collaboration Meeting 09 November 2015.
ESS Front End diagnostic
PXIE Ion Source & LEBT Commissioning Update Lionel Prost on behalf of A. Shemyakin, R. Andrews, B. Brooker, K. Carlson, J. Czajkowski, R. D’Arcy, B. Hanna,
ELENA installation progress F. Butin / ELENA collaboration.
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
Report Technical Director Storage-Ring-Installation Completed
Physics design on Injector-1 RFQ
Laboratory Directed Research and Development (LDRD) Proposal
Electron Source Configuration
Advanced Research Electron Accelerator Laboratory
Physics Design on Injector I
Presentation transcript:

MEBT status A. Shemyakin for the PXIE warm front end group PIP-II technical meeting January 20, 2015

Outline Overview Status of elements Configurations for RFQ beam commissioning Plans PIP-II technical meeting, January 19,

Goals and status Main final goals stay the same:  Demonstrate creating an arbitrary bunch pattern from initially CW 5-10 mA, 2.1 MeV H- beam  Compatibility with SRF downstream  Provide all modes that may be required for PIP-II The specifications and scheme did not change for ~3 years All major components are under development Parts of MEBT will be used to characterize the beam from RFQ  A set of configurations is under design PIP-II technical meeting, January 19,

PXIE MEBT PIP-II technical meeting, January 19, RFQ Bunching cavity Kickers HWR Quadrupoles Absorber Scrapers

MEBT elements Magnets  Quadrupoles and dipole correctors Kickers Absorber Bunching cavities Scrapers Diagnostics I will not cover LLRF and controls Mechanical design of the entire MEBT is expected to start in April 2015, when the LEBT is finished PIP-II technical meeting, January 19,

MEBT magnets PIP-II technical meeting, January 19, Triplet assembly. Image courtesy of BARC, India. MEBT needs 2 doublet and 7 triplet assemblies  Each assembly includes a pair of dipole correctors  Design incorporates a BPM inside triplets/doublets Quadrupoles and dipole correctors have been developed and will be built at BARC, India  Prototype magnets have been built and measured both at BARC and Fermilab  Quality is within specifications Quad field integral vs current. From M. Tartaglia, PX DB 1323 BARC’s F- Quadrupole prototype

MEBT magnets - status PIP-II technical meeting, January 19, Prototypes of the doublet and triplet are complete by BARC Will be delivered to Fermilab after magnetic measurements Will be re-measured at TD Quads will be re-arranged to make two doublets with dipole corrector sets Prototypes of F-quad and corrector set that are already at Fermilab will be used Covers a “short MEBT” configuration (see later) for RFQ beam characterization All dipole corrector sets are expected to be ready for shipment in Summer 2015 The schedule for production of all quadrupoles is being discussed

MEBT magnets – power supplies PIP-II technical meeting, January 19, MEBT magnets will be powered by power supplies from former Ecool Quadrupole PSs are LAMBDA (10A, 20V) Have all (18+2 spares) on hands; need controls Dipole corrector PSs (4A, 10V) will be based on Ecool corrector PSs Made in-house, G. Saewert. Test of combining four 1Amp PSs into one 4Amp was successful Re-packaging is under way (R. Brooker) Power supplies have been tested with the magnet prototypes delivered by BARC K. Carlson, G. Saewert Current stabilization is better than specified All power supplies are planned to be ready by summer 2015 Correctors power supply testing. Quadrupoles power supplies in a rack. K. Carlson. Photos: B. Hanna

Kickers Developing in parallel two versions, “50 Ohm” and “200 Ohm”  The technology choice will be made after tests with beam PIP-II technical meeting, January 19, RFQ Bunching cavity Kickers HWR Quadrupoles Absorber Scrapers

50 Ohm kicker - concept Kicker  24 electrodes per plate connected in vacuum by 50 Ohm cables Driver  Commercially available linear amplifier  Do not plan to purchase yet  The concept has been tested with a similar lower-power amplifier PIP-II technical meeting, January 19, D. Sun, A. Chen

50 Ohm kicker - status The second half of the kicker is being assembled  The complete kicker prototype is expected to be power-tested with MHz amplifier in spring 2015 PIP-II technical meeting, January 19, Ohm kicker power test setup. D. Sun, A. Chen, D. Petersen, D. Franck One half of the kicker prototype was assembled and tested  Excellent delay time  ns vs specified 21.97±0.1 ns  Power test in vacuum with 250 MHz amplifier  By the power left in the structure, 570 W applied to the kicker at 250 MHz is equivalent to specified 625 W at expected wave form  Stayed 4 hours at maximum power. Vacuum 6·10 -7 Torr. Temperature rise of an electrode (measured with IR camera) was 14C. RGA scans did not indicate excessive organic components.

200 Ohm kicker - structure Helix as a travelling-wave structure One helix was manufactured and measured  The delay time is off by 5%, so the final helix winding needs to be adjusted for the beam tests  In addition, ceramics permittivity was measured (S. Kazakov) One- helix assembly is being assembled for power tests in vacuum  First, test the design for handling of anticipated beam losses  Then, test with a 35 MHz, HV RF driver source for measuring the effects of RF losses PIP-II technical meeting, January 19, One helix is being prepared for power tests. G.Saewert, A.Chen, D. Franck 3D model of 200 Ohm kicker. G.Saewert, A.Chen, M. Jones

200 Ohm kicker - driver Driver is being developed at Fermilab (G.Saewert)  Broadband, DC coupled switches in push-pull configuration Push-pull driver was tested up to 200V  It was determined that the progress toward 500V requires different topology, which now is being pursued within LDRD Single switch was tested up to 500V  Being prepared for RF power testing the helix prototype PIP-II technical meeting, January 19, Output of 500V low-side switch. 4 ns and 20 ns wide pulses are superimposed. Leading edge is 2.0ns, trailing edge is 9 ns (5%-95%). 1 MHz CW, 200 Ohm load. Resistive load/monitor is bandwidth limited resulting in the leading edge appearing to be 3.2 ns.

Absorber 21 kW CW, 2mm 1σ beam; absorber of 50 cm length, 29 mrad grazing angle, 17 W/mm 2 of surface power density Features: Molybdenum alloy TZM, transverse slits to alleviate stress, shadowing steps to protect the slits Two ¼-size prototypes were successfully built and tested with an e-beam (28 keV, 0.19A) at comparable power density Reasonable agreement with ANSYS simulations Plan to test Prototype-II in full-length MEBT before proceeding to final absorber PIP-II technical meeting, January 19, RFQ Bunching cavity Kickers HWR Quadrupoles Absorber Scrapers

Prototypes Prototype-I: monolythic design  Complicated manufacturing process; a possibility of a crack to water  Tested surface power density up to 17 W/mm 2 with surface temperature up to 1300 K Prototype-II: separate TZM plates pressed against a water-cooled aluminum plate  Sacrificed thermal properties (~25% higher temperature rise) for simplicity and reliability  Also, better management of reflected particles  Was tested with power density well above the expected at PXIE, to ~30 W/mm 2 with surface temperature up to ~1600K  Survived >10 4 thermocycles in 8 days PIP-II technical meeting, January 19, C. Baffes

Bunching cavities  MHz, 100 kV max Expected power in copper ~1 kW Need 3 cavities PIP-II technical meeting, January 19, RFQ Bunching cavity Kickers HWR Quadrupoles Absorber Scrapers

Bunching cavities - status A prototype cavity has been brazed and is at Fermilab Resonant frequency is good (T. Khabiboulline) A big vacuum leak was found (D. Plant) The plan is to seal the leak and proceed with high-power RF tests 3 production cavities will be procured following the tests The prototype cavity will be used in “short MEBT” configuration Five 3-kW amplifiers have been ordered (R. Pasquinelli) and expected to be delivered in Feb 2015 PIP-II technical meeting, January 19, The cavity prepared for the leak test. Photo courtesy of L. Ristori, lead production engineer.

Scrapers  4 assemblies, 4 scraper jaws in each To be used for beam scraping, machine protection, and beam size estimations Max 50W per jaw. A prototype was tested with an electron beam up to 150W. Radiation – cooled, electrically isolated, independently movable TZM plates Linear drives from ECool PIP-II technical meeting, January 19, RFQ Bunching cavity Kickers HWR Quadrupoles Absorber Scrapers

Scrapers - status The first set is being assembled  May test it at LEBT in spring 2015  Will manufacture 2 more in FY15 PIP-II technical meeting, January 19, Model of the scraper set. C.Baffes Assembling the scrapers. K. Kendziora

Diagnostics Will be mainly in two “diagnostics” sections of the final MEBT  The final set may include: 9 BPMs, 2 toroids, DCCT, 4 x 4 scrapers, emittance scanner, 2 wire scanners, Fast Faraday Cup, 2 laser wires, extinction monitor Because of resource limitations, the diagnostics will be installed sequentially over years  FY15: 2 toroids, 2 BPMs, 1x4 scrapers, Fast Faraday Cup, ToF. Should be enough for initial RFQ characterization PIP-II technical meeting, January 19, RFQ Bunching cavity Kickers HWR Quadrupoles Absorber Scrapers Diagnostics sections

Diagnostics - status BPMs  One BPM is complete and measured  One more BPM is in production; have buttons for 2 more  Electronics for 2 BPMs should be ready by summer 2015  Buttons for all MEBT BPMs have been ordered Time-of-Flight monitor (“movable BPM”) – being designed  To measure the beam energy by recording the phase as a function of the longitudinal BPM position, following an idea from SNS Fast Faraday Cup – being designed  Small portion of the beam is cut by a pinhole and collected to a strip line  Modifications to SNS design to improve robustness 2 toroids – on hands Ring pickup – being procured  To estimate average beam current from RFQ for MPS purpose PIP-II technical meeting, January 19, V. Scarpine, M. Alvarez

Diagnostics – preparation for FY16 and beyond Emittance scanner  Will try to use slits in scraper jaws as double-slit scanner  Initial commissioning with the LEBT scanner (see later)  We also will measure the emittance by quadrupole scans If the scraper set assembly is found convenient, it may be used as a base for wire scanners Should have buttons for all BPM by summer 2015  To prepare all BPMs and triplet vacuum chambers by arrival of MEBT magnets Development of the laser wire has started  V. Scarpine, J. Ruan  Expensive and long – term work  General R&D in this direction within LDRD may help making the system less costly PIP-II technical meeting, January 19,

Vacuum PIP-II technical meeting, January 19, RFQ HWR IP IG IP IG IP IG IP IG IP IG IP IG IP 3 TP V V, FAV Elements of vacuum system have been identified  Purchased elements needed in CY15 A. Chen IP – ion pump, TP- turbo pump, IG – ion gauge, V- pneumatic valve, FAV- fast acting valve. Blue – on hands, Red – need to purchase.

MEBT in 2015 In 2015, parts of MEBT will be used for the RFQ beam commissioning and characterization  Expected to be in steps So far, all elements are on the path to work with a short- pulse beam in the end of FY15 (next slides) Plan to have high-power beam tests toward the end of CY15 PIP-II technical meeting, January 19,

“Short MEBT 1_1” (July- Sep 2015) Plan to start RFQ beam commissioning including MEBT section #0 fully assembled with prototype magnets and cavity  Pulsed mode only (<1 ms)  Protection from CW by MPS through a ring pickup signal  Commissioning of toroids, BPMs, scrapers, FFC, ToF, magnets  Measurement of beam energy, RFQ transmission, bunch length  If ready with RFQ frequency stabilization, commission the buncher PIP-II technical meeting, January 19, Scrapers Toroid LEBT FC with donut ToF monitor Fast Faraday Cup Ring pickup Prototype cavity

“Short MEBT 1_2” (Oct- Nov 2015) Measurements of beam emittance, Twiss functions  Start with the LEBT emittance scanner, compare with measurements by slits/scrapers First high – power tests  SNS beam dump (from HINS)  16 kW power test will be done with the “instrumentation” section removed PIP-II technical meeting, January 19, σ beam envelope 3D simulation for high-power tests. A. Saini. 5mA. 3D model of MEBT 1_2. C. Baffes, S. Oplt.

LEBT scanner in MEBT Very attractive to try using the LEBT scanner for initial RFQ beam commissioning  The Allison scanner is much faster than double-slit  Commissioned at LEBT; could be used for cross-calibration of slits  H- energy is by 70 times higher => the kick angle is 70 times lower => ±180 mrad in LEBT corresponds to only ±2.5 mrad in MEBT  Conclusion: Can be used if emittance is not too large with a specially prepared envelope PIP-II technical meeting, January 19, σ beam envelope 3D simulation for LEBT scanner use in MEBT. A. Saini. 5mA, transverse emittance 0.21 µm (rms, n). 3 σ beam angle in the proposed location of the scanner is 3.5 mrad. Placement the LEBT scanner between two scraper sets. C.Baffes, S.Oplt.

“Short MEBT 1_3” (Nov 2015) 16 kW power test may require a removal of the “diagnostics section”  To provide larger beam at the dump  The same components PIP-II technical meeting, January 19, D model of MEBT 1_3. C. Baffes, S. Oplt.

“Short MEBT” preparation 3D models of first configurations are prepared All components for “short MEBT 1_1” should be ready by July 2015 for RFQ beam commissioning PIP-II technical meeting, January 19, Model of short MEBT 1_1 C.Baffes, S.Oplt.

MEBT plan (technically driven, with no contingency) Aug 2015 – pulsed beam from RFQ Nov 2015 – CW beam Dec 2015 – Feb 2016 – installation of full – length MEBT  With prototype kickers (50 Ohm and 200 Ohm) and 5 kW prototype absorber  Final bunching cavities, final magnets, SNS beam dump at the end  Incomplete diagnostics (e.g. no wire monitors, extinction monitor, laser wire etc.) Mar –Jul initial MEBT commissioning  The main goal is to pass the beam to the chopper to test its elements  Make decision on the kicker technology; start the final chopper design Aug- Nov 2016 – all cryo work and SSR1 installation Dec Aug 2017 – MEBT characterization  In parallel with SSR1 commissioning Sep – Dec 2017 – final MEBT installation (concurrent with HWR’s) FY18 – demonstration of bunch-by-bunch separation PIP-II technical meeting, January 19,