Overview and Strategy Stuart Henderson Fermilab Accelerator Advisory Committee November 7-9, 2011.

Slides:



Advertisements
Similar presentations
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Advertisements

FACET: A National User Facility Carsten Hast SLAC National Accelerator Laboratory.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Energy management at FERMILAB: strategy on energy management, efficiency, sustainability Stephen Krstulovich, energy manager.
F Accelerator Physics Center: Status FNAL Steering Group V. Shiltsev.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
MUON COLLIDER: R&D Status & Opportunities for Participation FNAL, February 24, 2011   1.Motivation & OverviewSteve Geer 2.Accelerator R&DVladimir.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
American Neutrino Strategy: Consequences of P5 Report Jim Strait, LBNE Project Director NuFact August 2014.
The Future of Accelerator R&D at Fermilab Steve Holmes Accelerator Physics & Technology Seminar January 30, 2007.
Steve Geer OsC RAL 21 June, Muon Accelerator Program MUON COLLIDER & NEUTRINO FACTORY R&D in the U.S.  
F Project X Overview Dave McGinnis October 12, 2007.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
An Integrated Intensity Frontier Strategy Steve Holmes & Bob Tschirhart LBNE Reconfiguration Workshop April 25, 2012.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
Proton Improvement Plan: View from the Directorate (and the DOE) Stuart Henderson PIP Meeting Jan 3, 2012.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
Fermilab Perspective: Where are We Going with Project-X, and How Can it Benefit Nuclear Energy? Stuart Henderson PASI Meeting April 5, 2013.
J. Corlett. September 24, 2007 Report of the Fermilab Accelerator Advisory Committee on the Fermilab Steering Committee Report P5 Meeting Fermilab September.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Fermilab Accelerator R&D Strategy Steve Holmes URA Visiting Committee May 8, 2006.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Management February 20, Annual Review of the Muon Accelerator Program (MAP) Subcommittee members: Ron Prwivo, Ron Lutha, and Jim Kerby.
Glion Colloquium / June Accelerating Science and Innovation R.-D. Heuer, CERN HL-LHC, Aix-les-Bains, 1 Oct ECFA HL-LHC Experiments Workshop.
John Womersley 1/13 Fermilab’s Future John Womersley Fermilab May 2004.
Fermilab: Present and Future Young-Kee Kim Data Preservation Workshop May 16, 2011.
Proton Driver / Project X Keith Gollwitzer Fermilab August 30, 2012.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Fermilab SRF Linac Development Steve Holmes Workshop on High Intensity Proton Accelerators October 19, 2009.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
U.S. Plans for High Power Proton Drivers Steve Holmes Fermilab Workshop on Physics with a Multi-MW Proton Source CERN May 25, 2004.
Workshop on ARD at FNAL 1 CDF DØ Tevatron Main Injector\ Recycler Antiproton source Proton source V.Shi ltsev (FNA L) - EPA C'08 NML.
Intensity Frontier Physics with a Mega-Watt Proton Source R. Tschirhart Fermilab Science & Technology Review November
The Fermilab Roadmap, Project X, and Muon Facilities Steve Holmes NFMCC Meeting March 17, 2008.
Ionization Cooling for Muon Accelerators Prepared by Robert Ryne Presented by Jean-Pierre Delahaye MICE Optics Review Jan, 2016 RAL.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Fermilab: Introduction Young-Kee Kim DOE KA12 (Electron Research)Review June 22-23, 2010.
CPM 2012, Fermilab D. MacFarlane & N. Holtkamp The Snowmass process and SLAC plans for HEP.
Project X as a Muon Facility Platform Keith Gollwitzer Fermilab Accelerator Advisory Committee November 7-9, 2011.
Accelerator Division View Sergei Nagaitsev DOE Independent Project Review of PIP-II 16 June 2015.
Project X/ILC/SRF Integrated Plan Steve Holmes Fermilab DOE Annual Science & Technology Review July 12-14, 2010.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Overview of US Activities toward a Future Circular Collider Stuart Henderson FCC Kickoff Meeting February 12, 2014 Thanks to Vladimir Shiltsev, Giorgio.
Welcome! Robert Zwaska 23 November 2015 Workshop on Booster Performance and Enhancements.
Particle Physics Sector Young-Kee Kim / Greg Bock Leadership Team Strategic Planning Winter Workshop January 29, 2013.
Jayakar Thangaraj Fermilab Accelerator Advisory Committee November 7-9, 2011 PROTOPLASMA: Proton-driven wakefield experiment at Fermilab.
Steve Holmes DNP Meeting/Santa Fe November 6, 2010 Project X: A Multi-MW Proton Source at Fermilab.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
UK Neutrino Factory Conceptual Design
Introduction to Jefferson Lab
Presentation transcript:

Overview and Strategy Stuart Henderson Fermilab Accelerator Advisory Committee November 7-9, 2011

Outline Mission and Organization of the Accelerator Sector Operational Status Strategic Plan and Long Range Goals of the Accelerator Sector 2S. Henderson, Accelerator Advisory Committee, Nov. 7-9, 2011

Mission and Organization of the Accelerator Sector S. Henderson, Accelerator Advisory Committee, Nov. 7-9, 20113

Mission of the Accelerator Sector  Operating the accelerator complex at the highest levels of performance, efficiency and safety [Operations] 4 Operations Capability Acceler- ator Science Technology Develop- ment Future Facilities Enable the U.S. scientific community to tackle the most fundamental physics questions of our era by  Advancing basic understanding of beams and accelerators [Accelerator Science]  Maximizing the capabilities of the accelerator complex through upgrades and improvements [Expanding Capability]  Designing and building the next generation accelerator facilities for particle physics [Future Facilities]  Developing and nurturing those technologies that will enable the accelerator facilities of the future [Technology Development] S. Henderson, Accelerator Advisory Committee, Nov. 7-9, 2011

Accelerator Sector Organization 5 Accelerator Division R. Dixon Head Accelerator Sector Stuart Henderson Associate Laboratory Director Accelerator Physics Center V. Shiltsev Head Technical Division G. Apollinari Head Accelerator Support S. Henderson, Accelerator Advisory Committee, Nov. 7-9, 2011

Operational Status S. Henderson, Accelerator Advisory Committee, Nov. 7-9, 20116

Tevatron Concluded Operations September 30, 2011 S. Henderson, Accelerator Advisory Committee, Nov. 7-9, 20117

Tevatron Performance in 2011 FY11 Records: Highest peak luminosity: 4.3x10 32 cm -2 sec -1 Highest yearly integrated luminosity: 2.57fb -1 Highest weekly integrated luminosity:78.4pb -1 S. Henderson, Accelerator Advisory Committee, Nov. 7-9, Devoted ~2 weeks to Tevatron Studies program

Neutrino Program Operating 120 GeV Main Injector at ~350 kW for long-baseline program, 8 GeV Booster for short-baseline program Delivered 2.21x10 20 Protons to the NuMI target, which fell short of goals (but was the second best year for POT) Significant downtime due to 4 target failures and change-outs Post-mortem analyses carried out on all failed targets; several design improvements have been implemented Engaged expertise at Rutherford Laboratory in the UK in analysis, design and target production In 2012 we will begin modifying complex to deliver 700 kW from MI S. Henderson, Accelerator Advisory Committee, Nov. 7-9,

Strategic Plan and Long- Range Goals for the Accelerator Sector S. Henderson, Accelerator Advisory Committee, Nov. 7-9,

Fermilab Accelerator Strategy 11 NuMI (120 GeV): 350 kW Booster (8GeV): 35 kW NuMI (120 GeV) 700 kW Booster (8GeV): 80 kW Project-X: 120 GeV 3 GeV GeV Neutrino Factory To build upon our existing strengths to establish a world-leading program at the Intensity Frontier, enabled by a world-class facility Technology Development and Fundamental Accelerator Science LHC Tevatron LHC Tevatron LHC Upgrades in luminosity and energy LHC Upgrades in luminosity and energy Lepton Colliders …and use this program to provide a cornerstone for an Energy Frontier facility beyond LHC …while relying on a strong program of technology development and fundamental accelerator science. S. Henderson, Accelerator Advisory Committee, Nov. 7-9, 2011

12

Ten-Year Goal #1: Fermilab is the world leader on the Intensity Frontier We will develop a world-leading intensity frontier program based on a unique and powerful world-class accelerator complex Therefore we will… Get the most from our Accelerator Complex in the near-term: Ensure that the Accelerator Complex delivers on its commitments to the experimental program Increase the repetition rate, throughput and life expectancy of the 8 GeV proton source through the Proton Improvement Plan Modify the accelerator complex to enable a muon program based on the 8 GeV proton source (Mu2e and g-2) Build LBNE and begin to take data build a world-class facility in the mid-term Work toward Project X construction start in 2016 Develop plans for the long-term evolution of FNAL accelerator complex (NF/MC) based on Project X S. Henderson, Accelerator Advisory Committee, Nov. 7-9,

Evolution of the Accelerator Complex (through 2020) : Shutdown Tevatron : Proton Improvement Plan : Accelerator Upgrades for NOvA : Reconfigure P- bar for Mu2e/g-2 S. Henderson, Accelerator Advisory Committee, Nov. 7-9, 2011

Proton Improvement Plan The 40-yr old Proton Source (Linac and Booster) powers the U.S. accelerator-based HEP program until Project X is built The demand for protons increases by a factor of two throughout the 2010s Many components in operation are “original equipment” that  were not designed for the repetition-rate and throughput that is required, are difficult to maintain, and for which replacement parts are difficult to find The Proton Improvement Plan should enable Linac/Booster operation capable of  delivering 2.25E17 protons/hour (at 15 Hz) in 2016  maintaining Linac/Booster availability > 85%, and  maintaining residual activation at acceptable levels and also ensuring a useful operating life of the proton source through S. Henderson, Accelerator Advisory Committee, Nov. 7-9,

Proton Source Throughput Goals 16 g-2 Mu2e 8 GeV 120 GeV NOvA Shutdown LBNE S. Henderson, Accelerator Advisory Committee, Nov. 7-9, 2011

Building a World-Class Intensity Frontier Facility: Project X The central element of our Strategic Plan is the construction of Project X Project X Mission is to establish a world-leading Intensity Frontier Facility by providing  MW-class, multi-GeV, proton beams supporting multiple kaon, muon, and neutrino based precision experiments;  Neutrino beam for long baseline neutrino oscillation experiments, based on a capability of targeting at least 2 MW of proton beam power at any energy between 60 – 120 GeV. Simultaneous operations of the rare processes and neutrino programs.  Path toward a muon source for possible future Neutrino Factory and/or a Muon Collider.  Options for implementing a program of Standard Model tests with nuclei and/or applications beyond HEP Focus of R&D activities is on SC structure development and design/construction of the Project-X Injector Experiment (PXIE)  Goal to demonstrate injector and initial acceleration requirements with beam up to ~30 MeV  Tests chopper, RFQ, superconducting structure performance with beam 17S. Henderson, Accelerator Advisory Committee, Nov. 7-9, 2011

Project X Reference Design Unique capability to provide multi-MW beams to multiple experiments simultaneously, with variable bunch formats.  Design concept/configuration stable for more than a year Provides U.S. Intensity Frontier leadership for decades! 18 GeV 3 3 GeV GeV S. Henderson, Accelerator Advisory Committee, Nov. 7-9, 2011

Project X and the High Power Proton Accelerator Landscape 19 Simultaneous S. Henderson, Accelerator Advisory Committee, Nov. 7-9, 2011

Ten-Year Goal #2: Fermilab plays a leadership role in developing the technology for next generation accelerators In ten years… Fermilab is leading the effort to make the next energy frontier machine a reality Fermilab technology is being deployed at LHC for the luminosity upgrade program Magnet technology development program points the way to real solutions for a future hadron collider or lepton collider SRF expertise has enabled PX design and construction, has made substantial contributions to other SRF-based accelerators (e.g. NGLS), and is prepared to support a future collider Muon Accelerator Program is complete and next phase of R&D is underway; demonstration of key subsystems (6d cooling) is underway at a dedicated muon beam test area at Fermilab S. Henderson, Accelerator Advisory Committee, Nov. 7-9,

High-Field Magnet Program Focus of Efforts: 11T Nb 3 Sn twin-aperture dipole magnet development for LHC upgrade Higher field 11T-11m length replaces 8.3T-15m length to allow space for additional collimation systems needed for higher luminosity Would be first application of Nb 3 Sn technology in a working accelerator Nb 3 Sn coil fabrication technology: conductor, insulation, structural materials; LARP success: 220T/m (85% of short sample limit) in LQ Conceptual design studies for MC/NF magnets; fabrication and test of two short large-aperture helical solenoid models First test of HTS (YBCO tape) coil in hybrid configuration; 18.3T achieved Capabilities are in demand for MICE magnets, ITER, JLAB 12 GeV, PPPL, …. 21

Superconducting RF Program The Laboratory’s strategy hinges on SRF Technology SRF R&D program is carried out in an integrated approach that supports the strategic goals of U.S. HEP: Project X and the ILC Focus of and goals of efforts  Building technological base for Project-X through development of complete set of SC RF structures for acceleration from 0.07 <  = 1 : 325 MHz, 650 MHz, 1300 MHz.  Advancing state-of-the-art in SRF performance at 325, 650 and 1300 MHz  Understanding limits to Quality Factor and Gradient through basic SC materials R&D  Proving capability in the Advanced SC Test Accelerator at NML  Developing necessary SRF infrastructure to support activities 22  =0.22 SSR1 Dressed 1300 MHz cavities Spoke Cavity Test Cryostat S. Henderson, Accelerator Advisory Committee, Nov. 7-9, 2011

Final Assembly HTS VTS String Assembly MP9 Clean Room VTS 1 st U.S. built ILC/PX Cryomodule 1 st Dressed Cavity Cavity tuning machine Fermilab SRF infrastructure 23

Technology Development for Future Colliders Muon Collider and Neutrino Factory  Fermilab is the host lab for the national Muon Accelerator Program (MAP) and contributes ~2/3 of MAP effort  Deliverables:  Muon Collider Design Feasibility Report  Critical technology R&D: cooling, magnets,..  Contributions to and leadership in MICE  Contributions to IDS-NF 24 A 4 TeV Muon Collider fits on the Fermilab Site International Linear Collider  constructing a fully integrated ILC RF unit with 3 CMs powered by a single RF source with the goal of demonstrating required beam performance (S2 Goals)  We are testing the first CM now; completed string assy for CM2 and anticipate completing a full unit in FY13  Activities focused on study of RF in magnetic fields utilizing newly commissioned MuCool Test Area, and US MICE magnet deliverables

Ten-Year Goal #3:Fermilab is a recognized leader in Advanced Accelerator R&D and Accelerator Science As the national particle physics laboratory, we should be playing a much bigger role in the development of tomorrow’s acceleration methods. We will build on the A0 program and substantial infrastructure investments In ten years we want to … have a broad program in AARD underway, developing transformative approaches to particle beam acceleration and manipulation provide unique facilities to enable a national AARD program  A broad user program is operating at ASTA, publishing > 15 high quality pubs/year be recognized as a significant contributor to the AARD field Simulation, modeling and theory groups to be recognized as world-leading educate accelerator scientists and engineers in a well-regarded, established program grow Accelerator Science partnership with Argonne and UChicago S. Henderson, Accelerator Advisory Committee, Nov. 7-9,

AARD Highlights Our long-term ambitions build on the A0 AARD Program Recent highlights: Referred Journal publications : 1. Y.-E Sun et al., Phys. Rev. Lett. 105, (2010). 2. P. Piot et al., Phys. Rev. ST Accel. Beams 14, (2011). 3. A. H. Lumpkin et al., Phys. Rev. ST Accel. Beams 14, (2011). 4. J. Ruan et al., Phys. Rev. Lett. 106, (2011). 5. P. Piot et al., Appl. Phys. Lett. 98, (2011). In addition, we are considering the possibility of pursuing a plasma acceleration experiment making use of a proton drive beam S. Henderson, Accelerator Advisory Committee, Nov. 7-9, Transverse to Longitudinal Emittance Exchange (J. Ruan et. al. )

Advanced Accelerator R&D at the Advanced Superconducting Test Accelerator (ASTA) We are constructing a test accelerator using ILC technology to serve two purposes 27  to demonstrate technology readiness of a complete ILC RF Unit  provide a powerful and unique facility for advanced accelerator R&D We have set up a joint FNAL-ANL working group on scientific opportunities for AARD at the Test Facility Among the ~25 proposed experiments, we have identified three flagship experiments: integrable optics test accelerator, crystal-based compact high- brightness x-ray source longitudinal bunch-shape manipulation using double-emittance exchange S. Henderson, Accelerator Advisory Committee, Nov. 7-9, 2011

NML/ASTA Facility Layout S. Henderson, Accelerator Advisory Committee, Nov. 7-9, 2011 Existing NML Building New Underground Tunnel Expansion (Space for 6 Cryomodules (2 RF Units), AARD Test Beam Lines) Funded by ARRA New Cryoplant & CM Test Facility (300 W Cryogenic Plant, Cryomodule Test Stands, 10 MW RF Test Area)

Ten-Year Goal #4:Fermilab plays a leading role in applying accelerator technology to society’s problems We have an opportunity to connect our technology to real-world applications by leveraging the investment in the Illinois Accelerator Research Center Fits well within OHEP’s stated mission of stewardship of accelerator science and technology within Office of Science In ten years, we want… IARC to be busy and self-sustaining with an active industrial/lab/ university program To bring in substantial funding (>5% of laboratory funding) from non- HEP sources To develop disclosures, patents and spin-offs from Fermilab activities and IARC To deploy technology and expertise where we can make an impact beyond particle physics (ITER, NGLS, ADS, medicine, …) S. Henderson, Accelerator Advisory Committee, Nov. 7-9,

Illinois Accelerator Research Center (IARC) IARC is a partnership between Department of Energy and the State of Illinois to encourage and enable Fermilab to work closely with industry and universities on Accelerator Technology Development and Accelerator Education S. Henderson, Accelerator Advisory Committee, Nov. 7-9,  The Office Technical & Education (OTE) building is funded at $ 20 M by a grant from the Illinois Dept. of Commerce and Economic Opportunity (DCEO)

Illinois Accelerator Research Center and the Applications Program Mission  Work with Industry, University, and Laboratory partners to promote the development of accelerator technology, projects, and applications  Promote the growth of high tech industry based on accelerator technology leading to new products and capabilities  Work with University partners to create an educational center for accelerator science and technology We have formed an Accelerator Applications Steering Group that is charged with formulating the applications strategy, the IARC business model, and engaging with funding agencies and potential industrial/university partners S. Henderson, Accelerator Advisory Committee, Nov. 7-9,

Summary The Strategic Plan  Builds on our existing strengths in the Intensity Frontier, and seeks to cement this position by  getting the most from our Accelerator Complex in the near-term and  building a world-leading program powered by a world-class facility in the mid-term: Project X  Relies on a strong foundation of technology development and fundamental accelerator science to realize the ambitions of the field for Project X and beyond. S. Henderson, Accelerator Advisory Committee, Nov. 7-9,