CS-EE 481 Spring 2008 1481s08-PM University of Portland School of Engineering Post Mortem Review Wednesday, April 23rd.

Slides:



Advertisements
Similar presentations
R&D Process Optimization for a Customer and Order Management System Lauri Halkola April 29, 2008 Supervisor: Professor Raimo Kantola Instructor: MSc Miko-Janne.
Advertisements

Winter 2015 ECEn 490 Lecture 10 Prototyping 1 Prototyping and Design Standards.
CSCU 411 Software Engineering Chapter 2 Introduction to Software Engineering Management.
© Nintendo Game Document Game Development - Spring
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
Project Support Function PM Planning Organizing Staffing Monitoring Controlling and Leading Project Support Functions Monitoring Controlling.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
1 Software Fault Protection Allen Goldberg Kestrel Technology.
A Technical Game Project 4 Due dates: Game Idea Friday, March 16 th Game Plan Friday, March 23 rd Web Page Sunday, April 9 th First Playable Wednesday,
PIC Evaluation/ Development Board Dec02-12 December 10, 2002 Client: ECpE Department Faculty Advisors: Dr. Rover, Dr. Weber Chad Berg, Luke Bishop, Tyson.
CS-EE 480 Fall November, 2005 University of Portland School of Engineering Project D River Robot Navigation Team John Fastabend Justin Meyer Kim.
Fall CS-EE 480 Lillevik480f04-l1 University of Portland School of Engineering Project Swift Fox Design Review 21 Jan 2005 Peter Brunke Andrew Robinson.
Systems Development Lifecycle Testing and Documentation.
Rev. A MonTueWedThuFri Weekly Pre-approval Weekly FS 0.9 Weekly Picnic Pgm rev Projects Approved Adv/IR Assigned.
I NFORMATION S UPPORT AND S ERVICES 2.02 U NDERSTAND BASIC TROUBLESHOOTING OF HARDWARE AND SOFTWARE.
CS-EE 481 Spring Founder’s Day, 2006 University of Portland School of Engineering Electric Vehicle Drive System Authors Steven Arlint Abdullah Binsaeed.
CS-EE 481 Spring March 2007 University of Portland School of Engineering Project Boring Magnetic-field Monitoring Microprocessor Machine (MMMM) Team.
Spring CS-EE 481 Lillevik 481s07-l1 University of Portland School of Engineering Senior Design Lecture 1 Fall re-cap Spring pre-view Debugging.
CS-EE University of Portland School of Engineering Heart Rate Monitor Post Mortem Review April 21 st, 2010.
CS-EE 480 Fall November, 2005 University of Portland School of Engineering Holonomic Drive Control Team Jeff Hayes Grant Hay Daniel Hoffman Advisor.
Agreement Reaching Process Documentation (Example) Professional Virtual Community Business Opportunity.
Milestones  Receiving all parts for the design(Feb 4th)  Microcontroller, LCD work (March 26th)  Coding (April 10th)  Combined interface with ProtoBoard.
Incoming Power Grid Monitor TEAM #3: JAMES MCCORMICK, ZHIHOUG QIAN, JACOB JEBB, VICTOR EZENWOKO, ALEX LANGE FACILITATOR: DR. ASLAM SPONSOR: GREAT LAKES.
CS-EE 480 Fall September, 2003 University of Portland School of Engineering Project Brown Trout In-Line Headphone Amplifier Team Casey Hughes Jeff.
CS-EE 481 Spring s06-PM University of Portland School of Engineering Microprocessor-based Charge Controller Post Mortem Review Wednesday, April.
Fall CS-EE 480 University of Portland School of Engineering Project Meadowlark CMOS Programmable Digital Low-Pass Filter Jennifer Galaway Jennifer.
GUI For Computer Architecture May01-05 Team Members: Neil HansenCprE Ben JonesCprE Jon MathewsCprE Sergey SannikovCprE Clients/Advisors: Manimaran Govindarasu.
Milestones  Receiving all parts for the design(Feb 4th)  Microcontroller, LCD, and ADC work (March 26th)  Coding (April 10th)  Combined interface.
1 Post-Mortem Team Goonies Spinal Fusion Data Acquisition System Post Mortem Review 4/28/2012.
CS-EE 480 Fall October, 2004 University of Portland School of Engineering Project Nutria Web-based Class Forecaster Team Joe Barhoum Brady Prigg.
CS-EE 480 Spring 2006 Sublimity Audio 1 September, 2006 University of Portland School of Engineering Project Sublimity Audio Stereo Class D Audio Amplifier.
CS-EE 481 Spring s07-PM University of Portland School of Engineering Team Enterprise: Biggerfoot Textbook Exchange Post Mortem Review Wednesday,
Spring CS-EE 481 University of Portland School of Engineering Project Eagle 01/28/03 Project Eagle Scott Davis Alison Hawkins Anthony Waliser.
Spring CS-EE 481 Lillevik 481s07-l2 University of Portland School of Engineering Senior Design Lecture 2 Technical staff Prototype phase: DEP, TOP.
University of Portland School of Engineering Acoustic Art: Revolutionizing The Way You Listen To Pictures Post Mortem Review April 14, 2011.
CS-EE 481 Spring Founder’s Day, 2004 University of Portland School of Engineering Project Kokanee: TTL 7400 Series Logic Tester using CMOS VLSI Team.
1 Budgeting Finance Committee Student Senate Paul Manfredi, Chair.
Trade Software Developer Technical Seminar ACE Business Rules and Processes Laurie Dempsey March 8, 2012.
CS-EE University of Portland School of Engineering Team Hemlock: Nite Bike Speed Display Post Mortem Review 04/21/2010.
CS-EE 481 Spring Founders Day, 2005 University of Portland School of Engineering D.A.W.N. Discrete Accelerated Wellness Numerator Authors Jay Bodenhausen.
Fall CS-EE 480 Lillevik 480f06-l2 University of Portland School of Engineering Senior Design Lecture 2 Expectations/Rumors Calendar/Evaluation Defined.
You can ring us on & get the best answer for all your QuickBooks software account issues.
Spring CS-EE 481 University of Portland School of Engineering Project Eagle 03/04/03 Project Eagle Scott Davis Alison Hawkins Anthony Waliser.
Global Tech Squad Norton Antivirus Support Toll Free No:
Project Android Pilot Nation Stellar Sea Lions Post Mortem
QUICKEN CUSTOMER SERVICE PHONE NUMBER CONTACT US QUICKEN CUSTOMER SERVICE PHONE NUMBER
Computer tools for Scheduling
Is your web browser not protected by Norton antivirus? You need to contact at Norton internet antivirus tech support and take the help.
[Project Name] Post-Mortem
HP Tablet Tech Support Number
PROJECT NAME POST-MORTEM
THANK YOU… Welcome to Norton Internet Security Welcome to Norton Internet Security For More Visit on:
Resolve your Quicken Login Issues with 24X7 Customer support.
THANK YOU… Welcome to Norton Internet Security Welcome to Norton Internet Security For More Visit on:

Malwarebytes Installation Issues Number Facing error with Malwarebytes software is not something unusual as most of the users use to face.
Norton Antivirus Support Number UK. About Norton Antivirus Support Norton Antivirus is an anti-malware software developed and dispersed by Symantec Corporation.
How to generate a kernel memory dump with Avast. Like every other technical and software company, Avast too provides support articles and guides to solve.
Kaspersky Technical Support Number. Kaspersky Renewal Number.
Quickbooks Error 61 when you open the document. This Quickbooks blunder 61 happens when you open the organization records. This Quickbooks blunder 61 could.
Quicken Help Number Quicken Help Number We have tech support team which provides you excellent tech support for Quicken software,If you require tech support.
swingo XP Firmware, Service Tool & Error Codes
Team Blue Heron: Educational Ball and Beam Feedback Control System
Some simple steps to fix Dell printer error code
Parkit! The Parking Space Finder
[Project Name] Post-Mortem Presentation Template
Software Engineering Lecture #35
Project Name Post-Mortem
Surf Scoter: Electronic Ballast for a Fluorescent Lamp
Presentation transcript:

CS-EE 481 Spring s08-PM University of Portland School of Engineering Post Mortem Review Wednesday, April 23rd

CS-EE 481 Spring s08-PM University of Portland School of Engineering What Worked Well Components designed to be compatible with each other Simple project design Useful sample code Helpful technical support Efficient troubleshooting

CS-EE 481 Spring s08-PM University of Portland School of Engineering What Went Wrong Certain microcontroller limitations not considered (eg memory) Backup LCD –Sight unseen & not budgeted Sample code not guaranteed to work Depth of documentation lacking –Microcontroller –Thermometer

CS-EE 481 Spring s08-PM University of Portland School of Engineering Recommendations When stuck, contact Tech Support Learn to troubleshoot efficiently With software, be careful with version control Don’t be too ambitious!