Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.

Slides:



Advertisements
Similar presentations
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Advertisements

CRYOGENICS FOR MLC Eric Smith Internal Review of MLC.
Elvin Harms, Tom Peterson, Yuriy Orlov, Frank McConoloque.
Progress and Plan for Superconducting RF Cavity RF Group.
12 March 2006NFMCC Meeting, IIT, Chicago1 Progress on the MICE Cooling Channel and Tracker Magnets Michael A. Green Lawrence Berkeley Laboratory.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
CRYO PIPING & INTER-MODULE CONNECTIONS Yun He, Daniel Sabol, Joe Conway External Review of MLC Daniel Sabol, MLC External Review 10/3/2012.
Cryomodule requirements Hitoshi Hayano, KEK for CFS consideration Asian Single Tunnel Design June 1-2,2010.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Cryomodule Concept for the ODU RF Dipole Crab Cavity Tom Nicol* - Fermilab December 10, 2013 * With lots of help from HyeKyoung, Tom J, Shrikant, Ofelia,
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Heat load study of cryomodule in STF
Stress and cool-down analysis of the cryomodule Yun He MLC external review October 03, 2012.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
CRYOGENICS FOR MLC Cryogenic Cooldown Scheme Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Present status of TTF-cryomodules short overview Bernd Petersen DESY MKS March, 7, 2005 Main design features of TESLA-cryomodules Design changes for XFEL-cryomodule.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
Stress and Cool-down Analysis Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
Mechanical Design of Main Linac Cryomodule (MLC) Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Tim O’Connell, Ralf.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Cryomodule prototype Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Peter Quigley, Tim O’Connell, Ralf Eichhorn, Georg.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
56 MHz SRF Cavity Cryostat support system and Shielding C. Pai
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
Cryomodule prototype Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Peter Quigley, Tim O’Connell, Ralf Eichhorn, Georg.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
S1 global: thermal analysis TILC09, April 19th, 2009 Serena Barbanotti Paolo Pierini.
Overview of Main Linac Cryomodule (MLC)
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
Overview of Main Linac Cryomodule (MLC) Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Ralf Eichhorn Cornell on behalf of Paul Bishop, Benjamin Bullock, Brian Clasby, Holly Conklin, Joe Conway, Brendan Elmore, Fumio Furuta, Andriy Ganshyn,
Integration and Cold Testing of the CW ERL Cryomodule at Daresbury Shrikant Pattalwar ASTeC, STFC, Daresbury Laboratory (UK) On behalf of ERL Cryomodule.
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
Cryomdoule Test Stand.
CERN – Zanon discussions
Stress and cool-down analysis of the cryomodule
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
V. Veshcherevich Cornell University
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
KEK injector cryomodule
Alignment of Main Linac Cryomodule (MLC)
Cryomodule Assembly Plan
Cryomodules Challenges for PERLE
CEPC-650MHz Cavity Cryomodule
ERL Director’s Review Main Linac
Magnetic shielding and thermal shielding
HWR and Test Cryomodule for China ADS
Presentation transcript:

Ralf Eichhorn CLASSE, Cornell University

I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see Vadim’s talk) SC-Magnet & BPM section (design is halted) But I will try to review Choices we made Questions we are working on

All ports are on aisle side in the tunnel Coupler downstream of cavity SC magnets downstream of cavities Beamline string supported by HGRP via three posts Cryogenic valves Beam Pneumatic gate valve Manual gate valve Cavity package

Tuner stepper replaceable while string is in cryomodule Rail system for cold mass insertion Gate valve inside of module with outside drive Precision fixed cavity support surfaces between the beamline components and the HGRP -> easy “self” alignment

Fixed point 9.8 m, vacuum vessel at room temperature 9.5 mm -- HGRP 19 mm – thermal shield 8 mm – beamline 1 mm – cavity LHe vessel Axial displacement due to thermal contractions of materials at cold ComponentsMaterialTemperature∆L/L∆L HGRPTi300K-2K0.172%17 mm Thermal shieldAl K-40K0.350%34.5 mm Beamline (cavity)Nb300K-2K0.146%14.5 mm 7.5 mm -- HGRP 15.5 mm – thermal shield 6.5 mm – beamline Axial displacement is allowed by: Sliding post Cavity flexible support Key alignment of component supports Coupler design allows an offset of 10 mm Bellows in HOMs Sliding post

1 line for 2K supply subcooled bar 2K helium bath for cavities via 2K-2 phase line pre-cool gas for cool-down 90% heat load from RF losses in the cavities 2 lines for 4.5-6K 3.0 bar He liquid Single phase flow Thermal intercept for HOM absorbers and couplers 2/3 dynamic heat load 3 lines for 40-80K 20 bar He gas Thermal intercept for HOM absorbers and couplers 40K thermal shield, low thermal expansion rate over K range 90% heat load from HOM

Inside each cryomodule 4 Valves control flow into local distribution lines: 1.8 K Pre-cool 5 K 40 K 2K, 5K and 40K supply pipes run for the entire half linac

Q1Q1 Q2Q2

Max. 0.1 mm displacement Emittance growth due to cavity misalignment Cavity Alignment: Transverse offset (x,y) Baseline (1-  ): 0.5 mm Allowable (1-  ): 2 mm Pitch Baseline (1-  ): 1 mrad (0.8 mm over length of cavity) Allowable (1-  ): 1.5 mrad (1.2 mm over length of cavity)

1). Deformation/stress of HGRP under 1 ton beamline weight 2). Deformation/stress of vacuum vessel with 4 ton cold mass weight on 3 support posts 3). Mechanical stresses during cool-down process

Fixed ∆Y = 0 Max. displacement = 0.1 mm Beamline weight total 1 Ton Natural frequency ~ 88 Hz Conclusion: enough supports

RF Power vs. detuning (16.2 MV/m, Q ext = 6.5e7) Natural frequency ~ 88 Hz

Fixed supports (Qty. 8) Mode 144 Hz Mode 164 Hz Conclusion: enough supports Material Ti Grade 2 Modulus of Elasticity: 102 GPa

Fixed pipe support near cryo-valve Six cylindrical supports Fixed radial & tangential Free axial Natural frequency ~ 129 Hz Fixed support near cryo-valve of adjacent MLC Same situation for 2K & 6K pipes

Which specific part of the CM should be analyzed for mechanical eigenmodes? Strategies to minimize microphonics, do they come via the cryolines? HGRP (Ti) tolerances is a cost driver Best and cheapest way to stress-relief? Experience of weld cracking during cooldown? Carbon steel vessel demagnetization? Managing parallel cryogenic flows (expected heat- load for HOMs is W, cooling is in parallel)?