S. Caspi, LBNL HQ Magnet Program Shlomo Caspi LBNL LARP DOE Review FNAL June 1-2, 2011 BNL Jesse Schmalze Mike Anarella Peter Wanderer Arup Gosh FNAL Rodger.

Slides:



Advertisements
Similar presentations
Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
Advertisements

S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
Superconducting Large Bore Sextupole for ILC
ASC 2012, 10/10/2012Test results and analysis of LQS03 – G. Ambrosio 1 BNL - FNAL - LBNL - SLAC Test Results and Analysis of LQS03 Third Long Nb 3 Sn Quadrupole.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
Long Racetrack (LR) strategy – G. Ambrosio 1 LARP DOE review - FNAL, June 12-14, 2006 BNL - FNAL - LBNL - SLAC OUTLINE: LR R&D goals & plans Long Racetrack.
BNL - FNAL - LBNL - SLAC Long Quadrupole Results & Status Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
F. Borgnolutti November 14 th nd HiLumi Collaboration Meeting Frascati HQ coils: History & Performance.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
F LARP magnet R&D program Giorgio Ambrosio TD/MSD FNAL Annual Program Review September 07 OUTLINE LARP goals FNAL contribution to LARP FNAL core-program.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
BNL - FNAL - LBNL - SLAC Design and Test of the 1 st Nb 3 Sn Long Quadrupole by LARP Giorgio Ambrosio Fermilab Acknowledgement: many people contributed.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
ASC 2012Nb 3 Sn IR Quadrupoles for HL-LHC – G. Sabbi 1 Nb 3 Sn IR Quadrupoles for HL-LHC BNL - FNAL - LBNL - SLAC GianLuca Sabbi for the US LHC Accelerator.
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
BNL - FNAL - LBNL - SLAC Progress Report on LQ Program Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Superconducting Magnet Group Future of HQ coils S. Caspi 8/25/2011.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
LARP DOE Review, 7/9/2012Magnet Systems Introduction – G. Sabbi 1 Magnet Systems Overview and HQ Program GianLuca Sabbi 2012 DOE Review of LARP SLAC, July.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
LARP Collaboration Meeting, April 26-28, 2006Gian Luca Sabbi HQ Design Study (WBS ) LARP Collaboration Meeting April 26-28, 2006 N. Andreev, E.
MQXF Design Review, 12/10/14R&D basis for MQXF – G. Sabbi 1 IR Quadrupole R&D Program as a basis for MQXF GianLuca Sabbi QXF Design Review CERN, December.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
HE-LHC, 10/14/2010GianLuca SabbiUS LARP Magnet Development LHC Accelerator Research Program Magnet Development GianLuca Sabbi for the US LARP collaboration.
LARP CM17, 11/16/2011Magnet Systems Overview – G. Sabbi 1 Magnet Systems Overview GianLuca Sabbi LARP Collaboration Meeting 17 November 16, 2011 BNL -
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
HQM01 Test Summary Outline -Magnet Instrumentation and Shim System -SG Data -Short Sample Limits -Quench Training at 4.6 K and 2.2 K -Ramp rate and Temperature.
S. Caspi, LBNL TQS – Progress and plans Shlomo Caspi LBNL Collaboration meeting FNAL April
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
DESIGN STUDIES IR Magnet Design P. Wanderer LARP Collaboration Meeting April 27, 2006.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
QXF protection meeting, 4/29/14HQ High Miits Study – H. Bajas, G. Sabbi 1 HQ02 High MIITs Studies Preliminary findings and next steps Hugo Bajas, GianLuca.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
HQ02A2 TEST RESULTS November 7, 2013 FERMILAB. HQ02 test at Fermilab 2  First HQ quadrupole with coils (#15-17, #20) of the optimized design o Only coil.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Long Quadrupole Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
LARP DOE Review, 7/9/2012Long Quadrupole – G. Ambrosio 1 Long Quadrupole Program Giorgio Ambrosio DOE Review of the LARP Program SLAC July 9-10, 2011 LQ.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Many people contributed to this work, most of all the Long Quadrupole Task Leaders:
MQXFS1 Test Results G. Chlachidze, J. DiMarco, S. Izquierdo-Bermudez, E. Ravaioli, S. Stoynev, T. Strauss et al. Joint LARP CM26/Hi-Lumi Meeting SLAC May.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
LARP Collaboration Meeting 15 Nov 1-3, 2010 A2C- Materials Working Group Arup Ghosh (coordinator), Emanuela Barzi, Dan Cheng, Dan Dietderich, Soren Prestemon,
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
LHC Performance Workshop 2012Nb 3 Sn IR Magnets – G. Sabbi 1 New Magnets for the IR How far are we from the HL-LHC Target? BNL - FNAL - LBNL - SLAC GianLuca.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
LARP CM15, SLAC, 11/1/2010GianLuca SabbiMagnet R&D Plans Magnet R&D Plan for GianLuca Sabbi LARP Collaboration Meeting 15 SLAC, November 1 st,
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
Helene Felice Team: Dan Cheng, Daryl Horler, Paul Bish, Hugh Highley and Nate Liggins Thank you to Paolo Ferracin, Gianluca Sabbi and Franck Borgnolutti.
TQS Overview and recent progress
Model magnet test results at FNAL
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Presentation transcript:

S. Caspi, LBNL HQ Magnet Program Shlomo Caspi LBNL LARP DOE Review FNAL June 1-2, 2011 BNL Jesse Schmalze Mike Anarella Peter Wanderer Arup Gosh FNAL Rodger Bossert Dariusz Bocian Guram Chlachidze Giorgio Ambrosio Emanuela Barzi Sasha Zlobin LBNL Helene Felice Paolo Ferracin Dan Dietderich Ray Hafalia Dan Cheng John Joseph Juan Lizarazo Maxim Martchevskii Xiaorong Wang GianLuca Sabbi

S. Caspi, LBNL Outline The HQ program and Target Magnet Design Test Results Improvements and plans LARP DOE review, FNAL June 1-2,

S. Caspi, LBNL HQ Program & Targets Program Part of the US LHC Accelerator Research Program (LARP) Develop Nb 3 Sn quadrupole magnet for the LHC luminosity upgradeDevelop Nb 3 Sn quadrupole magnet for the LHC luminosity upgrade. Magnet Goals Extend Nb 3 Sn magnet technology:Extend Nb 3 Sn magnet technology: – TQ, 1 m long, 90 mm bore, 13T (1.9K) -> without field quality – LQ, 4 m long, 90 mm bore, 13T (1.9K) -> without field quality with field quality – HQ, 1 m long, 120 mm bore, 15T (1.9K) -> with field quality HQ program target:HQ program target: –160 (T/m) at 4.4K HQ01d reached 170 T/m –160 (T/m) at 4.4K (HQ01d reached 170 T/m, 11.8T) –175 (T/m) at 1.9K –Establish engineering phase space – training, ramp-rate, memory A collaboration between BNL/FNAL/LBNL (CERN testing) 3 LARP DOE review, FNAL June 1-2, 2011

S. Caspi, LBNL A collaboration program Cable design and fabricationLBNL Magnetic design & analysisFNAL, LBNL Mechanical design & analysis LBNL Coil parts design and procurementFNAL Instrumentation & quench protectionLBNL Winding and curing tooling designLBNL, FNAL Reaction and potting tooling designBNL Coil winding and curingLBNL Coil reaction and pottingBNL, LBNL Coil handling and shipping toolingBNL Structures (baseline, revised, mirror) LBNL, BNL, FNAL Assembly (baseline, revised, mirror) LBNL, BNL, FNAL Magnet testLBNL, CERN, FNAL Accelerator IntegrationBNL, LBNL, FNAL

S. Caspi, LBNL 5 HQ - Coil LARP DOE review, FNAL June 1-2, 2011

S. Caspi, LBNL HQ – Alignment Keys Alignment keys for field quality 6 LARP DOE review, FNAL June 1-2, 2011

S. Caspi, LBNL HQ – Aluminum Collars 1.Assemble and align the coils, 2.Displace the yoke to reduce saturation effects 7 LARP DOE review, FNAL June 1-2, 2011

S. Caspi, LBNL HQ – Iron Pads Iron pads complete the coil subassembly 8 LARP DOE review, FNAL June 1-2, 2011

S. Caspi, LBNL Merging two subassemblies Coil subassembly is placed within the structure subassembly 9 LARP DOE review, FNAL June 1-2, 2011

S. Caspi, LBNL Final Assembly and Pre-stress Four “Masters” are used to align and pre-stress the two subassemblies during the key and bladder operation 10 LARP DOE review, FNAL June 1-2, 2011

S. Caspi, LBNL LARP – HQ Magnet mm strand 15 mm wide cable 120 mm bore Short sample: 4.4 K/1.9 K -195/214 T/m Short sample: 4.4 K/1.9 K – 13.7/14.9 T LARP DOE review, FNAL June 1-2, 2011

S. Caspi, LBNL Room temperature before loading 12 LARP DOE review, FNAL June 1-2, 2011

S. Caspi, LBNL Gap opening between load key and pad master Bladder operation * Large scale factor to simulate displacements 13 LARP DOE review, FNAL June 1-2, 2011

S. Caspi, LBNL Shimming of the load key with 600  m stainless steel shims * Large scale factor to simulate displacements Key insertion 14 LARP DOE review, FNAL June 1-2, 2011

S. Caspi, LBNL  R of 270  m * Large scale factor to simulate displacements Cool-down 15 LARP DOE review, FNAL June 1-2, 2011

S. Caspi, LBNL  R of 78  m * Large scale factor to simulate displacements With Lorentz forces at 219 T/m 16 LARP DOE review, FNAL June 1-2, 2011

S. Caspi, LBNL Coils Assembly and Alignment 17 Alignment Keys Collars Coil & heater LARP DOE review, FNAL June 1-2, 2011

S. Caspi, LBNL ANSYS 3D Analysis 1.Axial pre-load 2.Azimuthal pre-load 3.Cool-down 4.Excitation 1.Low pre-stress during assembly 2.Cool-down and high pre-stress 3.No stress overshoot 4.Reusable structural components 18 LARP DOE review, FNAL June 1-2, 2011

S. Caspi, LBNL HQ - Azimuthal Stress MPa Average cold stress in HQ is 140 MPa but local stress expected to exceeds 200 MPa TQS performed above 90%, 150 MPa average stress and over 200 MPa local stress R=120 mmR=90 mm 19 LARP DOE review, FNAL June 1-2, 2011

S. Caspi, LBNL HQ Progress JulySelection of 120 mm quadrupole aperture for Phase JulySelection of 120 mm quadrupole aperture for Phase 1 Sept.Cable and coil cross-section geometry finalized Apr.HQ01a test coils 1,2,3,4 2010Apr.HQ01a test coils 1,2,3,4 71%-79%, T/m (unusual ramp rate performance) June HQ01b test coils 1,4,5,6 77%,153 T/m (electrical breakdown) JulyLARP DOE Review: … Need to understand certain performance limitation Oct. HQ01c test coils 1,5,7,8 70%-138T/m (unusual ramp rate performance) 2011 Apr.HQ01d test coils 5,7,8,9 86%, 170 T/m (mechanical limit) MayHQM01 mirror test coils 12 MayHQM01 mirror test coils 12 Status:13 coils completed, 4 HQ tests completed, 1 mirror test 20 LARP DOE review, FNAL June 1-2, 2011

S. Caspi, LBNL Test Results LARP DOE review, FNAL June 1-2,

S. Caspi, LBNL HQ01 Training (4.4K) 22 HQ01a 13683A (157T/m, 79% of ss) coils 1,2,3,4 coils 1,2,3,4 HQ01b 13308A (153T/m, 77% of ss) coils 1,4,5,6 coils 1,4,5,6 HQ01c 11953A (138T/m, 70% of ss) coils 1,5,7,8 coils 1,5,7,8 HQ01d 14983A (170T/m, 86% of ss) coils 5,7,8,9 coils 5,7,8,9 LARP DOE review, FNAL June 1-2, 2011

S. Caspi, LBNL Coil azimuthal stress during excitation LARP DOE review, FNAL June 1-2, Unloading during excitation (linear with I^2) Additional pre-stress is required

S. Caspi, LBNL Lesson learned – TQ pre-stress 150 MPa is not a hard limit for magnet performance. Impact of pre-stress on current plateau LARP DOE review, FNAL June 1-2,

S. Caspi, LBNL HQ01d magnetic measurement nNormal (b n )Skew (a n ) Harmonics at 120 T/m (average up-down ramp) Measuring coil radius and length= mm, 100 mm long Measuring coil radius and length = mm, 100 mm long Data shown at a reference radius = 40 mm, 2/3 bore LARP DOE review, FNAL June 1-2,

S. Caspi, LBNL LARP DOE review, FNAL June 1-2, Protection heater studies delay time Stainless steel protection heater strip on the outer layer Increasing the insulation thickness between protection heaters (PH) and coils.= longer delay times optimize energy distribution to coils

S. Caspi, LBNL Performance Assessment Observed limitations and deficiencies 27 LARP DOE review, FNAL June 1-2, 2011

S. Caspi, LBNL Ramp-rate dependence Inverted ramp rate behavior “holding quenches” LARP DOE review, FNAL June 1-2,

S. Caspi, LBNL Observed limitations and deficiencies: HQ01b (coil 6 layer to layer and end-shoe) HQ01a LARP DOE review, FNAL June 1-2, 2011 HQ01a (coil 2 to protection heaters) Insulation fragmentation after reaction Broken strands during reaction 29

S. Caspi, LBNL 30 Impulse Tests on HQ Coils Voltage Impulse test on a damaged coil showing arcing activity 10  s Test on coil showing no arcing activity LARP DOE review, FNAL June 1-2, 2011

S. Caspi, LBNL Excessive Coil Compaction Jesse Schmalzle HQ13 Coil springing out of reaction tooling LQ 16 Coil remains in reaction tooling HQ coils tend to spring out from their reaction tooling Even with one turn less HQ coil #13 still tends to spring out LARP DOE review, FNAL June 1-2,

S. Caspi, LBNL Performance Assessment Observed limitations: Voltage breakdown (HQ01a,b tests) Insulation damage (HQ01a,b tests) Broken strands (coil #10) Spring-back after reaction Unusual ramp rate performance (HQ01c tests) Low plateau magnet performance (HQ01c test) A common cause – Coils under excessive compaction during curing and reaction 32 LARP DOE review, FNAL June 1-2, 2011

S. Caspi, LBNL Reducing Coil Compaction LARP DOE review, FNAL June 1-2,

S. Caspi, LBNL Near term Reducing coil compaction - Near term Coil #12 - last turn below mid-plane, larger cavity (mirror test) 34 LARP DOE review, FNAL June 1-2, 2011 Coil #13 – removed one turn, same cavity (next mirror test)

S. Caspi, LBNL Mirror Test Study individual coil items: Cable, Core, Epoxy, Insulation New structure, similar to TQ

S. Caspi, LBNL HQM01 Coil #12 - ramp rate dependence Loss pre-stress with cool-down non-linear with current square First HQ mirror test Issues remain: pre-stress, ramp rates 4.6 K LARP DOE review, FNAL June 1-2, Cable with core Core not removed in splice Inverted rate below 150 A/s Significant improvement in ramp rate dependence

S. Caspi, LBNL Next step Reducing coil compaction - Next step 37 LARP DOE review, FNAL June 1-2, 2011 Keep existing cross-section and HQ tooling Reduce strand diameter from mm to mm Reduce cable size (will be discuss by Arup) Allow expansion during reaction 4.5% thickness, 2.3% width Despite the performance of coil 12 (perhaps not directly related to compaction) we still believe that the over compaction of the coil is important and needs to be solved Make room for coil expansion during reaction Additional R&D items: radiation resistance epoxy, cyanide- ester insulation, core cable, RRP 217, alternative structure

S. Caspi, LBNL Next Coil - HQ14 Parameters HQ14 Previous HQ Cable parameters Width14.8 (2.3 % reduction) mm (2.3 % reduction)15.15 Mid-thickness (4.5% reduction) mm (4.5% reduction) strands – mm 35 strands mm Insulation 100microns Type sleeve (S) or tape (E) sleeve Island gap size 4343 mm/m for 1 pass mm/m for 2 pass 2.7 closed 1.0 closed Interlayer insulation 20mils10 design LARP DOE review, FNAL June 1-2,

S. Caspi, LBNL Next Magnet Test – HQ01e LARP DOE review, FNAL June 1-2, Increase magnet pre-stress by MPa Improve pre-stress coils uniformity using different shim sizes Investigate current plateau and impact on field uniformity

S. Caspi, LBNL HQ Summary A 120 mm bore, Nb 3 Sn quadrupole is underway construction and testing - established engineering phase space4 tests (HQ01a/b/c/d) - established engineering phase space 160 (T/m) target exceeded, 170 (T/m),160 (T/m) target exceeded, reached 170 (T/m), 86% SS (4.4K) Coil compaction cause of performance limitation: –Excessive strain puts coils at risk but some can perform Future plans:Future plans: –Pre-load and field quality studies using “selected” coils –Mirror test using special coils –Quench protection tests using both HQ and the mirror –Reduce strand diameter and cable size –New series of coils with less compaction –Test optimized models at 1.9K (CERN) 40 LARP DOE review, FNAL June 1-2, 2011