© Copyright 2002 ABB Bomem Inc. All rights reserved. Page 1 MARVEL Meeting JPL, UoT, ABB Quebec City (Canada) February 6, 2003 CAUTION: COMPETITION SENSITIVE.

Slides:



Advertisements
Similar presentations
This document is not export controlled. Use or disclosure of this information is subject to the restrictions on the Title Page of this document 2.4m Space.
Advertisements

Design and Experimental Considerations for Multi-stage Laser Driven Particle Accelerator at 1μm Driving Wavelength Y.Y. Lin( 林元堯), A.C. Chiang (蔣安忠), Y.C.
ESTO Advanced Component Technology 11/17/03 Laser Sounder for Remotely Measuring Atmospheric CO 2 Concentrations GSFC CO 2 Science and Sounder.
Área de Instrumentación NAHUAL Mechanical Concept Current Status F. Javier Fuentes Instituto de Astrofísica de Canarias September
The MICE Target Lara Howlett University of Sheffield.
The YL2000 FTIR.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
1 Highly Accelerated Life Test (HALT) Wayne Bradley 8 April 2014.
May 14th, 2010 FMSTR. The Problem and Proposed Solution No current, acceptable solution exists to determine liquid volume in a tank exposed to microgravity,
Initial Calibration and Stability Results from the LiCAS RTRS FSI System John Dale for the LiCAS Collaboration IWAA February 2008.
1.B – Solar Dynamo 1.C – Global Circulation 1.D – Irradiance Sources 1.H – Far-side Imaging 1.F – Solar Subsurface Weather 1.E – Coronal Magnetic Field.
Lecture 3 INFRARED SPECTROMETRY
Author Name Page 1 CNES’07 Peer Review 4/17/02 CNES’07 Mars Premier Peer Review Rendezvous and Sample Capture OS Beacon Electronics And Power System Mark.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
1 NASA’s Goddard Space Flight Center 2005/4/14 LRO/CRaTER Technical Interchange Meeting LRO Mechanical Systems Giulio Rosanova / /
MCAO Adaptive Optics Module Mechanical Design Eric James.
The Field Camera Unit Project definition, organization, planning S. Scuderi INAF – Catania.
CrIS Full Spectral Resolution Test Results 1 Mark Esplin 1, L. Larrabee Strow 2, Gail Bingham 1, Deron Scott 1, and Chad Fish 1 1 Space Dynamics Laboratory.
The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002.
LIGO-G M May 31-June 2, 2006 Input Optics (IO) Cost and Schedule Breakout Presentation NSF Review of Advanced LIGO Project David Reitze UF.
Critical Design Review Presentation Jan. 20, 2011.
PARIS-IR U of T FTS TAO Figure 1. The experimental setup for the mini-MANTRA FTS intercomparison campaign. The University of Toronto’s Balloon-Borne Fourier.
Space-Qualified Hardware for the CALIPSO Lidar
LIGO-G D Enhanced LIGO Kate Dooley University of Florida On behalf of the LIGO Scientific Collaboration SESAPS Nov. 1, 2008.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
SAM PDR1 S OAR Adaptive Module LGS LGSsystem Andrei Tokovinin SAM LGS Preliminary Design Review September 2007, La Serena.
Progress Report Geo-CAPE Coastal Ecosystem Dynamics Imager (CEDI) IRAD Repackaging Study Jason Budinoff / GSFC Cathy Marx / GSFC May 12, 2011.
LIGO- G D The LIGO Instruments Stan Whitcomb NSB Meeting LIGO Livingston Observatory 4 February 2004.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
G Z LIGO R&D1 Input Optics Definition, Function The input optics (IO) conditions light from the pre- stabilized laser (PSL) for injection into.
Advanced Virgo Optical Configuration ILIAS-GW, Tübingen Andreas Freise - Conceptual Design -
FTS Test Definition Summary Kaley Walker Test Readiness Review January 29, 2003.
Performance Testing of a Risk Reduction Space Winds Lidar Laser Transmitter Floyd Hovis, Fibertek, Inc. Jinxue Wang, Raytheon Space and Airborne Systems.
MAXIM Periscope ISAL Study Highlights ISAL Study beginning 14 April 2003.
COST 723 Training School - Cargese October 2005 OBS 3 Radiative transfer for thermal radiation. Instruments Bruno Carli.
© Copyright 2006 ABB Bomem Inc. All rights reserved. Page 1 ACE-FTS instrument: after 7.5 years on-orbit Henry Buijs ABB Ryan Hughes U. Of Waterloo.
NASA/Air Force Cost Model presented by Keith Smith Science Applications International Corporation 2002 SCEA National Conference June
1st Advanced Virgo Review – November 3-4, 2008 – L. Pinard 1 Mirrors Sub-System Overview  Introduction  Scope of the subsystem, main tasks  Substrates.
NAST-I Development History Developed by MIT Lincoln Laboratory in 18 months for NPOESS using a COTS BOMEM (now ABB) interferometer, detectors, and optics.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
1 Atmospheric Radiation – Lecture 17 PHY Lecture 17 Satellite instruments and missions.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Status of the Laser Risk Reduction Program at LaRC Michael Kavaya, Upendra Singh NASA/LaRC Working Group on Space-Based Lidar Winds Sedona, AZ Feb. 1-3,
1 System Architecture Mark Herring (Stephen Merkowitz Presenting)
Extended Detector Cutoff Considerations WFIRST Project Office May
1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Atomic Clock with Enhanced Stability (ACES) Proposers Day Robert Lutwak.
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
GSFC/Spinhirne 03/13/2002 Multispectral and Stereo Infrared Cloud Observations by COVIR (Compact Visible and Infrared Imaging Radiometer) J. Spinhirne,
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
The Field Camera Unit Results from technical meeting S. Scuderi INAF – Catania.
Advanced LIGO UK 1 LIGO-G K OSEM Development UK Advanced LIGO project Stuart Aston University of Birmingham for the UK Advanced LIGO Team LSC.
X-ray Interferometer Mirror Module ISAL Study Pre-work Overview.
10-meter Interferometer Results M. Woods (special thanks to Steve Myers and Tim Slaton) Jan. 31, 2000 Commissioning Setup System Noise Monte Carlo simulation.
The Proposed Holographic Noise Experiment Rainer Weiss, MIT On behalf of the proposing group Fermi Lab Proposal Review November 3, 2009.
Testing of Highly Accurate Blackbodies Harri Latvakoski Mike Watson Shane Topham Mike Wojcik SDL/
Calibration and the status of the photon calibrators Evan Goetz University of Michigan with Peter Kalmus (Columbia U.) & Rick Savage (LHO) 17 October 2006.
Ball Aerospace Scalable Configurable Cryocooler Electronics (SCCE)
Internal CDR meeting December 20th, 2005
Pre-launch Characteristics and Calibration
TEMPO Instrument Update
The Proposed Holographic Noise Experiment
Peer Review Agenda (Suggested).
System Considerations for Submillimeter Receiver
GLAST Large Area Telescope
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
Launch and On-orbit Checkout
Instrument Overview Larry Springer HMI Program Manager
BalloonWinds-GroundWinds Project Summary
Presentation transcript:

© Copyright 2002 ABB Bomem Inc. All rights reserved. Page 1 MARVEL Meeting JPL, UoT, ABB Quebec City (Canada) February 6, 2003 CAUTION: COMPETITION SENSITIVE MATERIAL THE INFORMATION CONTAINED HEREIN IS PROPRIETARY TO AND CONSIDERED A TRADE SECRET OF “ABB BOMEM INC.” AND SHALL NOT BE REPRODUCED, IN WHOLE OR PART, WITHOUT THE WRITTEN AUTHORIZATION OF “ABB BOMEM INC.” Mars Scouts

© Copyright 2002 ABB Bomem Inc. Page 2 Overview of Presentation Section 0: Introduction Section 1: Overview of ACE heritage Section 2: Interferometer sub-system proposed to JPL for MARVEL Section 0) Introduction Mars Scouts

© Copyright 2002 ABB Bomem Inc. Page 3 Heritage from ACE: Background Information ACE-FTS development started early 1999 (Phase B contract award) under CSA’s Space Science program. Prime contractor is ABB Inc., main sub- contractors are Ball Aerospace and EMS Technologies. Over 150 persons have contributed to the ACE-FTS development. The instrument design is based on the classical Michelson interferometer with an optimised double-pass optical layout. The instrument also includes two 128x128 imagers and an active suntracker. ACE-FTS is a relatively complex instrument: more than 50 optical components, 3 mechanisms, severe mass/power limitations, cryogenically-cooled IR detectors... ACE-FTS was delivered to the Canadian Space Agency September 18 th, 2002 Section 1) Overview of ACE heritage

© Copyright 2002 ABB Bomem Inc. Page 4 Instrument Electronics (EBOX) Sub-System IR Detector/Cooler Sub-System Input Optics and VIS/NIR Imager Sub-Systems Interferometer Sub-System Instrument Structure Sub-System ACE-FTS Instrument Architecture Section 1) Overview of ACE heritage

© Copyright 2002 ABB Bomem Inc. Page 5 The ACE-FTS Instrument Interferometer-side Input Optics-side Section 1) Overview of ACE heritage

© Copyright 2002 ABB Bomem Inc. Page 6 ACE-FTS: 3-days before its delivery Section 1) Overview of ACE heritage

© Copyright 2002 ABB Bomem Inc. Page 7 Key Requirements Section 1) Overview of ACE heritage

© Copyright 2002 ABB Bomem Inc. Page 8 ACE-FTS Instrument Optical Layout Section 1) Overview of ACE heritage

© Copyright 2002 ABB Bomem Inc. Page 9 Structural Design The instrument FEA has more than 140,000 elements Structural design of such an instrument is paramount for vibration qualification Thousands of hours were needed for the detailed structural analyses Design of interferometer rotary arm flexures and retro-reflector mounting VERY critical. Excellent correlation between FEA and tests ACE-FTS was qualified under vibrations both at instrument-level and spacecraft-level Significant vibration over-test at instrument-level even if FLV was used Section 1) Overview of ACE heritage

© Copyright 2002 ABB Bomem Inc. Page 10 Vibration qualification successfully completed Section 1) Overview of ACE heritage

© Copyright 2002 ABB Bomem Inc. Page 11 Vibration qualification: Instrument vs S/C-levels X Direction Grms Ratio (FTS/Spacecraft) = 12 Y Direction Grms Ratio (FTS/Spacecraft) = 5 Z Direction Grms Ratio (FTS/Spacecraft) = 15 X-axis Section 1) Overview of ACE heritage

© Copyright 2002 ABB Bomem Inc. Page 12 Thermal Design Section 1) Overview of ACE heritage

© Copyright 2002 ABB Bomem Inc. Page 13 FTS TVAC testing at ABB-Bomem Section 1) Overview of ACE heritage

© Copyright 2002 ABB Bomem Inc. Page 14 Overview of Test Results SNR requirement is met (>100) for most of the critical spectral bands ILS/spectral resolution: cm -1 (requirement < cm -1 ) Modulation efficiency: measured 80 to 99 % (requirement > 70%) Mass: kg (requirement < 40 kg) Power in science mode: 37 Watts (requirement < 40 Watts) Rotary arm velocity control better than 0.05% RMS (requirement < 1%) Laser metrology SNR: 55 dB (> 50 dB) Imager co-registration requirements met Instrument pointing stability: 3 μrad (requirement < 15 μrad ) Instrument pointing knowledge: 5 μrad (requirement < 15 μrad ) TVAC qualified: stable performance at cold/nominal/hot cases Vibration qualified, no visual damage, various optical alignments maintained Section 1) Overview of ACE heritage

© Copyright 2002 ABB Bomem Inc. Page 15 InSb Measurement (window around 1900 cm -1 ) 3200K 1500K 1250K Section 1) Overview of ACE heritage

© Copyright 2002 ABB Bomem Inc. Page 16 Flight Model Spectra High-Resolution CO lines Section 1) Overview of ACE heritage

© Copyright 2002 ABB Bomem Inc. Page 17 Comparison with MolSpec Database (CO 2 ) Simulations with MolSpec Database ACE-FTS Flight Model Measurement with InSb Detector Section 1) Overview of ACE heritage

© Copyright 2002 ABB Bomem Inc. Page 18 SciSat-1: 4 months before launch SciSat-1/ACE spacecraft Test results are showing promising instrument performance. ACE-FTS is the fastest-developed and lower-cost space-based FTS ever built ! Two additional ACE-based instruments are being built (ground version + balloon- borne unit). SciSat-1 launch scheduled 2 nd Quarter Section 1) Overview of ACE heritage

© Copyright 2002 ABB Bomem Inc. Page 19 Section 2) Interferometer sub-system proposed to JPL

© Copyright 2002 ABB Bomem Inc. Page 20 Interferometer Sub-System Characteristics OPD: +/- 25 cm (for 0.02 cm -1 spectral resolution), 4 resolution settings Sweeping velocity: 25 cm/sec Metrology wavelength: solid state laser 1550 nm Metrology SNR: 55 dB Optical transmission: 2-14  m nm Aperture: 20 mm diameter, divergence up to 6.25 mrad Mass: 7.41 kg Electrical Power: 4.7 Watts Volume: 5.2 x 10.8 x 16.5 inches Includes locking mechanism for launch Tested and qualified up to 25 G RMS (measured by accelerometer mounted on rotary arm mechanism) Section 2) Interferometer sub-system proposed to JPL

© Copyright 2002 ABB Bomem Inc. Page 21 Optical & Electrical Interfaces Section 2) Interferometer sub-system proposed to JPL Input Optics Sub-system Detector/ Cooler Sub- system Instrument Electronics Sub-system JPL or ABB JPLABBJPL All optical interfaces with collimated beams for robustness

© Copyright 2002 ABB Bomem Inc. Page 22 Mechanical Interfaces Section 2) Interferometer sub-system proposed to JPL 16.5” 10.8” 5.2”

© Copyright 2002 ABB Bomem Inc. Page 23 Interferometer Sub-System Architecture Section 2) Interferometer sub-system proposed to JPL Rotary arm module Rotary arm Voice Coil Corner-Cubes Pin-puller (locking mechanism) etc… Beamsplitter/compensator module Beamsplitter Compensator Beamsplitter Wall Compensator Cell etc... Laser source module Laser launcher Temperature and Current Control Boards etc… Metrology detection module Laser detection board Filter etc… End-mirror module End-mirror End-mirror Wall etc...

© Copyright 2002 ABB Bomem Inc. Page 24 ACE-FTS Interferometer Sub-System Beamsplitter and Compensator Cube Corner Rotary Arm Voice-Coil Actuator Invar Mount Titanium Cell Retardation Waveplate Laser Source Side #1 Laser Source Side #2 End Mirror Wall Invar Cell End Mirror Metrology Interface Metrology Detection MPD/ZPD Opto- Switches Pin-Puller MPD/ZPD Encoder Beamsplitter Wall Section 2) Interferometer sub-system proposed to JPL

© Copyright 2002 ABB Bomem Inc. Page 25 Laser Diode Space Qualification Mitsubishi 1550 nm Mitsubishi Part ML976H11F Commercial part DFB laser diode at 6 mW optical power Already used for ACE laser source and for other ABB Bomem Space Programs Up-screening with TANDEX Up-screening to SSQ2001 NASA norm (JAN TXV qualification) Repackaging possible if required Risk Mitigation Tests Characterisation and environmental tests were successfully performed BOM-ACE-0179 Technical Note: Impacts of 1550 nm laser diode wavelength Section 2) Interferometer sub-system proposed to JPL

© Copyright 2002 ABB Bomem Inc. Page 26 Option: interferometer + servo electronics Section 2) Interferometer sub-system proposed to JPL

© Copyright 2002 ABB Bomem Inc. Page 27 Qualification for Mars flight Vibration qualification: tested 5 to 15 times higher than planned SciSat-1 launch (Pegasus XL) EEE: pin diodes (available JANS), opto-switches (available JANS) laser diodes 1550 nm (ACE are JANTXV upgradable to JANS as CrIS program). Radiation tests were successfully performed on laser diodes (over 10 kRADs for ACE, and will be tested up to 30 kRADs for CrIS/NPOESS) Voice-coil would require new supplier (would propose Moog or Aeroflex) Pin-puller fully space-qualified by StarSys Research (Boulder) All interferometer electronics parts (laser drivers, metrology detection) available either Class S/B or QML V/Q. All servo control (option) electronic parts upgradable to “S” level. Section 2) Interferometer sub-system proposed to JPL

© Copyright 2002 ABB Bomem Inc. Page 28 Other considerations - Costs - Schedule - Procurement scenarios (direct contract or potential CSA contribution) - Inputs for phase A - etc. Section 2) Interferometer sub-system proposed to JPL Interferometer Sub-System Servo electronics board