Company and family presentation – part 5 V-2009 (rev. VI-2012) (Part 00, PP 2007, animation+p/r : 2009.05.31) ready 1 Copyright notice Unauthorised copying.

Slides:



Advertisements
Similar presentations
Cofferdam.
Advertisements

Enzyme Stabilized Mud (Earthen) Construction using DBV-1
Measurement for Civil Engineering works
Foundation Systems.
Humboldt State University Environmental Resources Engineering A Commitment to YOUR Future.
SIVA 1 Introduction to Geotechnical Engineering ground Duration: 11 min 56 s.
CONSTRUCTION.
GABION PRESENTATION.
Educational qualifications and experience required from the technical staff of contracting activities # Activity code Activityeducational qualification.
CE 120 Introduction to Civil Engineering
CE 120 Introduction to Civil Engineering
Foundation Engineering CE 483
Civil engineering branches & scopes
C ONTACT STRESS IN CIVIL ENGINEERING. Introduction 1 Skyscrapers Bridges Dams How are these constructions supported? Why are all these large constructions.
BASICS ELEMENTS OF CIVIL ENGINNERING Prepaid by:
Technical Control Bureau for Construction SECONED Technical Inspection Service AON Nazomermiddag 08 sept Delft.
FROM UNDERGROUND … Address: 59, 3 rd September Str. GR 10433, Athens, Greece s:
Your logo کاربرد ژئوگرید در افزایش پایداری موج شکنها
Handling of Future Human Actions in the safety assessment SR-Site Eva Andersson.
高等职业技术教育教材 English for Construction Engineering 建筑工程专业英语 主 编:陆伟成 副 主 编:付 奕 尹春霞.
CEE Civil and Environmental Engineering Department W. M. Kim Roddis, Ph.D., P.E. Department Chair.
19 February Summary: Updating on the activities completed (Done) since the last meeting List activities on going (Next steps) and related Actions.
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
AN INTEGRATED DESIGN CONCEPT … … FROM UNDERGROUND UP TO THE TOP ODOTECHNIKI LTD CONSULTING ENGINEERS Address: 59, 3 rd September Str.
BCM 210 Foundation Issues- Fall 2000 refer to Allen Text
Construction Application Sub- committee review and 2012 plan Steven Yu BASF (China) March 15 th, 2012 Shanghai.
Name of the course :Building construction Course code :HED 228 Credit hours :3hours Prepared by Eng. Nadir Abd alrazig siddig.
Decision Making and Data Management in Geotechnical Engineering
19 February Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
Mezyad Engineering Consultants L.C.C is an Multidisciplinary engineering consultancy that was founded in It helps clients to optimize the performance.
Extreme engineering Extreme engineering – part 1 IX-2009 (rev. VI-2012) (Part 00 EE, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised.
Company and family presentation – part 4 V-2009 (rev. VI-2012) (Part 00, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised copying.
Part 10-2b Micropiles and self drilling rods in soil and rock engineering V-2009 (rev. XI-2012) (Part 10-2b, PP 2007, animation+p/r : compr.)
(Part 9-2e, PP 2007, animation+p/r: rev compr.
Best waterproofing solutions for your home. The best way to be prepared for monsoon and winters is prepping and checking your plumbing system, roof.
Part 10-1b Micropiles and self-drilling rods in soil and rock engineering V-2009 (rev. XI-2012) (Part 10-1b, PP 2007, animation+p/r : compr.)
Part 11 Concrete repairs - sealing of cracks and waterproofing (Part 11, PP 2007, animation+p/r : DEMO) ready Copyright notice Unauthorised.
Extreme engineering Extreme engineering – part 2 IX-2009 (rev. VI-2012) (Part 00 EE, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised.
Part 10-2a Micropiles and self drilling rods in soil and rock engineering V-2009 (rev. II-2013) (Part 10-2a, PP 2007, animation+p/r : compr.)
Keep Your Home Grounded With Expert Answers to Your Foundation Repair Questions.
Part 16 Sequential and single sequence grouting with hybrid and semi-hybrid grouts VII-2009 (Part 16, PP 2007, animation+p/r : DEMO) ready 1.
Welcome to Condor Projects Ltd, a specialist contractor to the civil engineering industry with over 30 years experience
Leads Institute of Technology & Engineering
Foundation Repair in Kansas City
A cooperative program to serve all of India
(Part 30, PP 2007, animation+p/r : short version compr.)
Concrete repairs in Dammam
Micropiles and self drilling rods in soil and rock engineering
(Part 66 short, PP 2007, animation+p/r compr.)
Part 75-2A Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.
Part 75-1D Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.
Concrete repairs, crack sealing
Drilling and sampling in foundation engineering
Part 66/1 “Polyurethane resins in rock grouting and tunnel repairs”
Part 92_4 ”PUR in civil engineering – sealing of retaining walls”
Biological engineering and gabion constructions in coast protection
Part 75-4D Piles, steel-core piles and micropiles. Static test loadings. TNa micropiles.
New Licensing and Renewal Requirements
Part 75-3D Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.
{Graduation Project} An-Najah National University
Drilling and sampling in foundation engineering
New hazards and transport infrastructures
Water projects under The Cohesion Fund.
EAG346-Sem II 2014/2015 Lesson 2.
Various Fields in Civil Engineering By R.Janani
Drilling and sampling in foundation engineering
Foundations in Low-Rise Construction (up to 3 floors)
4th Annual Construction Law Summit
Concrete A structural material made by combining cement, sand, aggregate, and water.
Introduction DEFINATION :-
Presentation transcript:

Company and family presentation – part 5 V-2009 (rev. VI-2012) (Part 00, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised copying of this presentation as whole or in parts in any form or by any means, electronic, photocopying, recording or otherwise, without prior written permision is prohibited.

ready 2 means …….

ready 3 Köpmangatan 22 Köpmangatan 11 now visit …. G allery Nord Amber

NAJDER engineering ®NAJDER engineering ® is a consulting company as well as a specialist contractor within civil and foundation engineering. We are preparing technical concepts, design projects, analyses and performing jobs as a subcontractor. Skånska Cementgjuteriet Skanska ABTomasz Najder joined in the period of Skånska Cementgjuteriet (today Skanska AB) as a member of Supervising Team on the project “Second Dry Dock in Gdynia Shipyard”. Stabilator AB Skanska Group Stabilator Sp. z o.o. Skanska Group Tomasz Najder gained his experiences in Stabilator AB (daughter company in Skanska Group) as site manager, project manager and internal consultant (”trouble-shooter”), as Production Manager (Stabilator AB- International Division in Poland), in Polish-Swedish company Stabilator Sp. z o.o. (Skanska Group) as Vice President and Executive Manager. Polibeton Sp. o.o. Najder engineering ® Polimark InternationalAnna Elżbieta Najder (wife) owned Polish company Polibeton Sp. o.o. and now Swedish Najder engineering ® since 1997 (until 2005 operating as Polimark International) – operating globally. Najder engineering ®Anna Monika Najder (daughter) together with Tomasz Najder (as the President of the Board and Executive Manager) owned Polish Najder engineering ® operating in Poland. Family Najder is working within mining, tunneling and civil engineering since six generations. Family and company history in civil engineering 4 ready

5 Daughter Anna Monika Najder Mama Anna Najder ready

6 ready

7 7 Foundation engineering and soil investigations. Reinforcement of existing foundations (underpinning) of industrial buildings, housing estates and ancient monuments (piling, anchors, injections). Rock stability and soil improvement (deep mixing method, high/low-pressure injection, lime-cement columns). Stabilization of slopes and embankments (geogrids, soil reinforcement, drainage, geotextile). Sealing of existing embankments, dams, dikes and waste deposits. Flood defense. Biological engineering, gabion constructions. Leakage and moisture counteraction (insulations, drainages, sealing injections, dilatation repair) in concrete and brickworks structures. Field of activity ready

8 ready …. newer complains when you engage us as grouters ……

9 9 Foundation engineering and soil investigations. Reinforcement of existing foundations (underpinning) of industrial buildings, housing estates and ancient monuments (piling, anchors, injections). Rock stability and soil improvement (deep mixing method, high/low-pressure injection, lime-cement columns). Stabilization of slopes and embankments (geogrids, soil reinforcement, drainage, geotextile). Sealing of existing embankments, dams, dikes and waste deposits. Flood defense. Biological engineering, gabion constructions. Leakage and moisture counteraction (insulations, drainages, sealing injections, dilatation repair) in concrete and brickworks structures.Leakage and moisture counteraction (insulations, drainages, sealing injections, dilatation repair) in concrete and brickworks structures. Field of activity ready

10 ready Concrete repairs with polyurethane resins

11 ready Repairs of culverts with Insitu-form method

12 Foundation engineering and soil investigations.Foundation engineering and soil investigations. Reinforcement of existing foundations (underpinning) of the ancient monument (piling, anchors, injections).Reinforcement of existing foundations (underpinning) of the ancient monument (piling, anchors, injections). Stabilization of slope.Stabilization of slope. Leakage and moisture counteraction (insulations, drainages, sealing injections, dilatation repair) brickworks structures.Leakage and moisture counteraction (insulations, drainages, sealing injections, dilatation repair) brickworks structures. Field of activity ready at Royal Castle in Warsaw (Warszawa - Poland)

13 Royal Castle in Warsaw (Warszawa) ready

Water sources: 1.0 Precipitation. 2.0 Groundwater in the slope. Repairing method: - Waterproofing of upper and back part of the building. presspresspress ready 14

Step 1: preparations ready 15

16 ready

17 ready

Water infiltration: 1.0 – Close to steel sheet-pile wall. 2.0 – Above Arcades. 3.0 – Between sheet-pile wall and Arcades. Arcades after completion of repairing works presspresspress ready 18

ready 2011

ready 20 TNA concept (Stabilator AB) Appendix to TNA concept (Stabilator AB) press TNA concept (Stabilator AB) Previous design according to TNA concept (Stabilator AB) press

ready 21 Tomasz Najder, Chef of Consultant’s Committee, Client’s Leading Supervisor in 1900-ties, Warsaw Major contributing with financial support to start these works at its beginning not invited to the opening ceremony in 2005 and (forgotten by the same Director of the Royal Castle in Warsaw during whole period of construction works). Oblivion or forgetfulness ? Or..... Tomasz Najder, Chef of Consultant’s Committee, Client’s Leading Supervisor in 1900-ties, Warsaw Major contributing with financial support to start these works at its beginning not invited to the opening ceremony in 2005 and (forgotten by the same Director of the Royal Castle in Warsaw during whole period of construction works). Oblivion or forgetfulness ? Code of Good Practice..... or the next example of the Code of Good Practice ????? Stabilator AB Stockholm, Stabilator Sp. z o.o Project was started before 1996 and these works were performed by Stabilator AB Stockholm, alter continued by Stabilator Sp. z o.o under leadership TNa of TNa as the author of the concept and co-author of the initial project. presspress

Thank You for Your attention! ready 22 THE END

ready Welcome to 23