Cluster Active Archive Status of DWP Activities Simon Walker, Keith Yearby, Hugo Alleyne ACSE, University of Sheffield.

Slides:



Advertisements
Similar presentations
CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov CLUSTER / STAFF Action items C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau-Wehrlin,
Advertisements

FGM report 10 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Chris Carr, Tim Oddy, André Balogh I mperial College London November 2009.
FGM report 9 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Paul French, Chris Carr, Tim Oddy, André Balogh I mperial College London March.
® Kick off meeting. February 17th, 2011 QUAlity aware VIsualisation for the Global Earth Observation system of systems GEOVIQUA workshop February, the.
11 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011 STAFF CAA products & Cross-Calibration activities Patrick ROBERT & STAFF Team 5) STAFF-SC CWF.
CODIF Status Lynn Kistler, Chris Mouikis Space Science Center UNH July 6-8, 2005 Paris, France.
CAA 12th Cross-cal meeting Toulouse Oct STAFF status report N. Cornilleau-Wehrlin,P. Robert, V. Bouzid, and STAFF team.
CLUSTER/STAFF DATA at CAA. 11th Cross-Calibration Meeting, 7-9th April 2010, Goslar. C. Burlaud, P. Robert, O. Santolik, N. Cornilleau-Werhlin, P. Canu,
STAFF Report Patrick Robert, Rodrigue Piberne & STAFF team.
STAFF Report Prepared by R. PIBERNE. 2 1.Status of software development 2.Status of Experiment Calibration / Cross Calibration 3.Status of dataset delivery.
WHISPER action items Gábor Facskó, Jean-Gabriel Trotignon,Séna Kougblénou, Xavier Vallières, Guillaume Lointier LPC 2 E/CNRS, Orléans, France 10th CAA.
PEACE DAA Status Andrew Fazakerley, Iryna Rozum, Andrew Lahiff, Branislav Mihaljčić & the PEACE ops team 5 November 2009, DAA meeting, Paris, France MSSL.
CAA PEACE Status Iryna Rozum, Andrew Fazakerley, Natasha Doss, Andrew Lahiff, Yulia Bogdanova, Branislav Mihaljčić & the PEACE ops team MSSL 12 th Cross-Calibration.
1 CAA 2009 Peer Review, Jesus College, Cambridge, UK, March CAA Peer Review: Selected Recommendations.
DAA PEACE Status A. Fazakerley, B. Mihaljčić, I. Rozum, A. Lahiff, G. Watson, D. Kataria UCL Department of Space and Climate Physics Mullard Space Science.
9 th CAA Cross-Calibration Workshop, Jesus College, Cambridge, UK, March /17 CAA Graphics: Pre-generated/On-demand Panels and Cross-Calibration.
CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu EDI Status of Calibration and Archiving Activities.
CAA PEACE Status Andrew Fazakerley, Natasha Doss, Branislav Mihaljčić, Chandrasekhar and Gill Watson MSSL 20 th Cross Calibration Workshop, Gottingen,
1 CAA 2009 Cross Cal 9, Jesus College, Cambridge, UK, March 2009 Caveats, Versions, Quality and Documentation Specification Chris Perry.
15th CAA Cross-calibration workshop CIS archiving activities report University College of London 2012, April
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
15 th CAA Cross-Calibration Workshop, 17th – 19th April 2012, UCL, London PEACE OPS TEAM Presented by Natasha Doss UCL Department of Space and Climate.
14 th CAA Cross-Calibration Workshop, 5th – 7th October 2011, York, UK PEACE OPS TEAM Presented by Natasha Doss UCL Department of Space and Climate Physics.
FGM Report: Extended Mode Processing 22 nd Cross Calibration Workshop Chris Carr, Patrick Brown, Leah-Nani Alconcel, Tim Oddy, Peter Fox, Cary Colgan (summer.
Double Star Active Archive - STAFF-DWP Data errors and reprocessing Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin LPP.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
10th CrossCal Workshop, L'Observatoire de Paris, France Cluster Active Archive Status of DWP Action Items Simon Walker, Keith Yearby, Hugo Alleyne ACSE,
FGM report 5 th Operations Review of the CAA Elizabeth Lucek, Patrick Brown Chris Carr, Tim Oddy, André Balogh I mperial College London June 9 th 2010.
Cluster Active Archive Science User Working Group (CAASUWG) - update Matt Taylor on behalf of CAASUWG.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
20th CAA Cross Calibration Göttingen - October 15-16, 2014 Status of CIS Data Archival I. Dandouras, A. Barthe.
CIS Action Items 10 th Cross-Calibration Workshop Observatoire de Paris, Nov
1 CAA 21 th Cross Calibration Meeting, Leiden, th Mar 2015 CAA Cross Cal Meeting Mar 2015 Automated Pipeline Processing.
8th Cross-calibration Workshop CIS data delivery report Kinsale – October 2008.
CAA PEACE Status Natasha Doss, Andrew Fazakerley, Branislav Mihaljčić and Gill Watson MSSL 18 th Cross Calibration Workshop, Abingdon, UK, October.
Double Star Active Archive - DWP/STAFF 1 Double Star Active Archive STAFF/DWP Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin.
1 11 th CAA Cross-Calibration Workshop, Hotel die Tanne, Goslar, Germany 7-9 April 2010 CAA 11 th Cross-Calibration Workshop Hotel die Tanne, Goslar, Germany.
Laboratoire de Physique des Plasmas 20 TH CAA CROSS-CAL M EETING CLUSTER-STAFF REPORT O CTOBER 2014 G ÖTTINGEN The STAFF Team Laboratoire de Physique.
DAA Status/Progress B. Mihaljčić, A. Fazakerley, G. Watson, C. Anekallu UCL Department of Space and Climate Physics Mullard Space Science Laboratory 21.
WHISPER report whisper team 16th CAA Cross-Calibration workshop Toulouse, France, 7-8 November 2012 CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE Laboratoire.
MSSL * A.N. Fazakerley, I. Rozum, N. Doss, B. Mihaljcic & the PEACE ops team PEACE CAA Action Items Status 11 th CAA Cross Calibration Meeting, 7 – 9 April.
CAA PEACE Status PEACE Operations Team Presented by Iryna Rozum MSSL Cross-Calibration Meeting, Uppsala, Sweden, April 2011.
1 CAA 20 th Cross Calibration Meeting, MPS, Gottingen 16th Oct 2014 CAA Cross Cal Meeting Oct 2014 Pipeline Automation Chris Perry.
WEC meeting TED status and WEC timing.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
8 th Cross-Calibration Workshop, Kinsale, Ireland, October 20081/14 Draft Replies and Actions to the Recommendations of the Review Panel for Final.
21st CAA Cross Calibration Workshop Leiden, March 2015 WHISPER report WHISPER team LPC2E/CNRS.
26th Oct 2006CAA cross cal meeting, MSSL RAPID Calibration Status RAPID team.
21 th CAA Cross-Calibration Workshop Leiden, Netherlands24-26 March Introduction.
10 th CAA Cross-calibration meeting, 2nd – 4th November 2009, Paris N. Doss, A. Fazakerley, B. Mihaljčić and I. Rozum UCL Department of Space and Climate.
FGM Report 21 st Cross Calibration Workshop Chris Carr, Patrick Brown, Leah-Nani Alconcel, Tim Oddy, Peter Fox Imperial College London 24 March 2015.
14 th CAA Cross-calibration Workshop CIS archiving activities York October 5-7, 2011.
Double Star Active Archive - STAFF- DWP 1 K.H. Yearby, S.N. Walker, M. Balikhin University of Sheffield.
Cluster Active Archive
CAA Operational Review 9 Double Star PEACE Team Report
ASPOC Presentation for the CAA Operations Review-1 Klaus Torkar and Harald Jeszenszky IWF/OAW Graz ESTEC, May 2006.
16th CAA Cross-calibration Workshop
10th CAA Operations Review Annual Report of the CIS Experiment
Cluster Active Archive – Wideband data BM2 mode
CSA Implementation overview since OR-8 Test campaigns Scheduled development plan Arnaud Masson CSA/CAA Operational Review 9 ESTEC, 04-June-2014.
EDI – CAA STATUS REPORT EDI CAA Status
CAA-OR (End of Phase 1) CAA DWP Operations Review
H. Rème, I.Dandouras and A. Barthe IRAP, Toulouse, France
Cluster Active Archive 1st Operations Review May 16-17, 2006
Jolene S. Pickett, Joanne M. Seeberger, Ivar W
Annual Report of the DWP Experiment 9th CAA Operations Review
Natasha Doss, Andrew Fazakerley, Branislav Mihaljčić and Gill Watson
CAA Action Items Investigations PEACE Progress Meeting
Annual Report of the FGM Experiment for the 8th Operations Review of the Cluster Active Archive (CAA) Chris Carr, Leah-Nani Alconcel, Patrick Brown,
10th CAA Operations Review Annual Report of the FGM Experiment
Presentation transcript:

Cluster Active Archive Status of DWP Activities Simon Walker, Keith Yearby, Hugo Alleyne ACSE, University of Sheffield

12th CrossCal Workshop, Toulouse, France Overview Management Current delivery status Documentation Delivery plans Action items

12th CrossCal Workshop, Toulouse, France Management Hugo Alleyne PI DWP Michael Balikhin Keith Yearby TM DWP TCOR Simon Walker COR, LOG, PIOR ICD, UM, CR

12th CrossCal Workshop, Toulouse, France Current Status TCOR –Delivered C1, 2, 4 for 2009 –Time calibrations for C3 between February 20 and March 7 are being investigated by ESOC

12th CrossCal Workshop, Toulouse, France Current Status Correlator FX and ST –Delivered to end August 2010 –Processing/Validating September 2010 Correlator overview plots –Delivered Feb 2001-Dec2009

12th CrossCal Workshop, Toulouse, France Current Status DWP_LOG –Ingested to end 2009 –Processing /Validating August/September 2010 UT_PIOR –Data until end 2009 delivered –Processing files for 2010

12th CrossCal Workshop, Toulouse, France Documentation ICD –No recent update –Changes required for implementation of pitchangle information User Manual –Minor updates made Calibration Report –Currently no updates planned

12th CrossCal Workshop, Toulouse, France Header files Currently, no updates have been made Updates will be required when pitchangle information and count rate are included within the COR datasets

Caveats 12th CrossCal Workshop, Toulouse, France TCOR A set of caveat files has been delivered to CAA that list the periods when the TCOR parameters OFFSET and DIFF are not defined Period covered – Entries for 2009 will be added when all TCOR data products are available.

12th CrossCal Workshop, Toulouse, France Delivery schedule Year CORIIIIIII03/11 TCOR 1 IIIIIIC12403/11 DWP_LOGIIIIIII03/11 UT_PIORIIIIIII03/11 COR_PLOTIIIIIII03/11 I – Data ingested, D – Data delivered 1 Depends upon delivery of WBD data from UK CDC

DWP09-AI-5 12th CrossCal Workshop, Toulouse, France TO: DWP DUE: 15-Jul-10 Action: To present an assessment on the effect of the PEACE detector aging on the quality of the COR data and include it to the CR. (see PR09- ALL01, PR09-ALL04, PR09-ALL06) Response: No progress

DWP09-AI-7 12th CrossCal Workshop, Toulouse, France TO: DWP DUE: 15-Jul-10 Action: To perform the inter-spacecraft comparison of the COR observations between the four spacecraft. (see PR09-ALL04, PR09-ALL06). Response: No progress

DWP09-AI-9 12th CrossCal Workshop, Toulouse, France TO: DWP DUE: 15-Jul-10 Action: To evaluate if one could produce an error estimate for ACF and to evaluate/clarify the background level (it is normally flat but one may observe a slope if there is a gradient in the energy spectrum). (see PR09-ALL04, PR09-ALL05, PR09-ALL06) Response: No progress

DWP09-AI-10 12th CrossCal Workshop, Toulouse, France TO: DWP/CAA DUE: 15-Jul-10 Action: To perform a comparison study between DWP and PEACE count rates and present them via cross-cal plots. (see PR09-ALL09) Response: No progress

DWP09-AI-15 12th CrossCal Workshop, Toulouse, France TO: DWP DUE: CC 11 Action: To check/improve the UG so that the user knows what PEACE sensitivity issues may affect the results of COR, if any, (details are given in the CR based on the PEACE-DWP comparison) and what the users should pay attention in the dataset, e.g. MCP level, but so what, what should I do with MCP level? (see PR09-DWP10) Response: No progress

DWP09-AI-17 12th CrossCal Workshop, Toulouse, France TO: DWP DUE: 15-May-10 Action: To provide new TCOR files that include the complete time coverage. If they are annual files, they can start from 1 Jan 00:00:00 up to 31 Dec 23:59:59 Response: No progress

DWP09-AI-19 12th CrossCal Workshop, Toulouse, France TO: DWP DUE: 15-May-10 Action: To check the status of the data files (TCOR and COR in particular) during the commissioning phase (Dec 2000 – Jan 2001) and to see if they could be delivered to the CAA (see also OR5-R16) Response: The DWP team is looking into this. January 2001 are currently being processed. Once these are validated work on December 2000 will begin.

DWP09-AI-25 12th CrossCal Workshop, Toulouse, France TO: DWP DUE: 15-May-10 Action: To consider to include the pitch angle information to the COR (mainly in BM) dataset in order to allow users to filter ACFs for a given pitch angle range. Ideally FGM 5VPS dataset is used. At the same time the estimated count rate could be included in the same dataset. (CC10-AI-10) Response: The minimum/maximum pitchangles in a given period during which ACFs are calculated will be added to the COR_FX/ST datasets. An estimate of the count rate from the ACFs will also be added. A test data file is currently being validated.

DWP09-AI-25 12th CrossCal Workshop, Toulouse, France In BM there are 4, 8, or 16 ACF’s per spin i.e. time periods of 1, 0.5, or 0.25 seconds. Pitchangles calculated using HEEA polar look angle - COR_FX/ST data files, Changes each spin local magnetic field direction - CAA FGM 5VPS data product, Maybe 1 FGM point GSE spin axis direction (rotation GSE to SR2) - CSDS AUX files Values of pitchangle calculated Correlator time tag Beginning and end of period over which ACF is accumulated For each time tag in FGM 5VPS Take minimum and maximum in each period

CC11-AI-2 12th CrossCal Workshop, Toulouse, France TO: All DUE: Action: The teams are reminded that the ICD and UG in particular must be updated by 12 May 2010 and be submitted together with other review documentation Response: Documentation was submitted in preparation for OR5

CC11-AI-3 12th CrossCal Workshop, Toulouse, France TO: All DUE: Action: the teams are encouraged to make a poster presentation of their CAA datasets with focus on the usability and quality of the datasets. The CAA will have a help desk to the users Response: A poster was submitted and presented at the Cluster 10 th anniversary workshop in Corfu.

CC11-AI-6 12th CrossCal Workshop, Toulouse, France TO: EFW/DWP DUE: 15-Jun-2010 Action: to provide the EFW mode information, knowledge of EFW Y/Z density vs voltage mode is in particular needed. Response: EFW mode information is NOT available within the DWP_LOG dataset. It is, however, available from the WEC HK files on the RDM. Within a block of housekeeping data (192 bytes), the information is located at word 157 using masks of 0x01 (probe 1), 0x02 (probe 2), 0x04 (probe 3), and 0x08 (probe 4). A value of zero indicates the probe operating in EFIELD mode, one indicates DENSITY mode. NOTE: The value of these parameters represents the state of the probes at the time of the reset pulse. It does not define the exact moment when the mode was switched.

OR5-R13 12th CrossCal Workshop, Toulouse, France TO: CAA/All DUE: Action: Users with specific interests may wish to access only a portion on the information available in user guides. The board recommends that both the CAA and instrument teams consider developing user guides with a fast browsing capability. Response:

OR5-R14 12th CrossCal Workshop, Toulouse, France TO: CAA/All DUE: Action: Given the wealth of datasets available from each instrument, it can be difficult for new users to identify the dataset(s) needed for their studies. The board recommends that each user guide include a short section pointing users to the appropriate data sets as a function of region of space and time. This information may take the form of flow charts or decision trees (e.g. All UGs should include table of contents, with identical chapter headings as specified by the CAA. Response: Since all DWP quantities are unique and do not depend upon region users should have no problem in identifying which dataset can provide the information that they seek.

OR5-R15 12th CrossCal Workshop, Toulouse, France TO: All DUE: Action: All teams should bear in their mind that the CAA may be closed by November 2011 if the SPC does not extend the Cluster mission. Consequently, all key data production activities must be completed by summer 2011 to allow time for data ingestion and possible trouble shooting. The board has noticed inconsistencies between this requirement and some of the proposed delivery schedules, particularly in the case of teams that are already behind schedule. The board reminds instrument teams that all 2009 data should be ingested by September Response: The DWP team is aware of this situation and will aim to have all DWP datasets for 2009 ingested by September 2010

OR5-R16 12th CrossCal Workshop, Toulouse, France TO: All DUE: Action: The board notes that the CAA lacks observations from the commissioning phase and recommends delivery of observations particularly from January 2001 (which have already been used for many publications). and December 2000 (when there are interesting interference campaigns). (see also DWP09-AI-19). Response: The DWP team is looking into this. January 2001 are currently being processed. Once these are validated work on December 2000 will begin.

OR5-R19 12th CrossCal Workshop, Toulouse, France TO: DWP DUE: Action: The users guide provides temperature variables in deg C, but states that SI_CONVERSION = "1>C". "C" stands for Coulomb, so this text should be replaced by "1>(Celsius)". Degree Celsius is not an SI unit nor convertible to one multiplicatively. Response: The metadata contained in the DWP_LOG header file has been corrected such that the UNIT entry is now "deg C" and the SI_CONVERSION has the value "1>(Celsius)". The ICD has also been updated accordingly with this change to the description of the temperature fields.