Many entry points to improve reliability! Research, Prototyping, Development QA & Testing Manufacturing & Installation Commiss- ioning Operation Technical.

Slides:



Advertisements
Similar presentations
Technology Department EDMS nb.?????? Maintenance methods and policy in FPS section Maintenance Management, Spare Parts Management. Overview of activity.
Advertisements

Accel Computerized Maintenance Management System.
More than experience CERN – 3rd MAY 2011 – Kick-off meeting Maintenance Assessment Project – Kick-Off Meeting Arek Burnos, Tony Vaclavicek, Tom Pryslak.
Intervention Priority Management This talk will show the CERN priority list, the corresponding check list and the tools used by operators to diagnose a.
An overview of the CERN CMMS
Maintenance and Engineering Procedures and Tools at Soreq Applied Research Accelerator Facility I. Gertz, Y. Buzaglo, A. Grin, R. Michael, R. Raizman,
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
MFI Office Maintenance Management Project Presentation 30th of May
1 AMMW2013 workshop 13 d – 15 th of November, 2013 Asset management tools: use and improvement in SOLEIL – P. Betinelli Asset management tools: use and.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Computers & Employment By Andrew Attard and Stephen Calleja.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
From Research Prototype to Production
Chapter 13: Developing and Implementing Effective Accounting Information Systems
Computerized Maintenance Management Working Group Maintenance audit preparation meeting 2 nd May 2011 I. Rühl.
The Group Coding Officer Role Goran Perinić. Presentation to the QAC and GCO meeting.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Barriere O, Le Roux P
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Level 2 Unit 6 Application of Manufacturing Techniques in Engineering Engineering Diploma Level 2 Unit 6 Application of Manufacturing Techniques in Engineering.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
Maintenance Management Project Mario Batz EN-CV Pierre Bonnal DG-DI Christophe Delamare GS-ASE Christophe Mugnier TE-EPC Goran Perinić TE-CRG Ingo Ruehl.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
1 1 Aeronautical Information Services Brief to AIXM User Group 27 February 2007.
Maintenance Management Project Intermediate Status Report
Margarita Saifoulina BE/RF/SR. Outline Data Management EDMS & MTF for RF structures Future prospects for EDMS/MTF solution Data Management EDMS & MTF.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Maintenance Management Project 3 rd Status Report Pierre Bonnal DG-DI Christophe Delamare GS-ASE Marine Gourber-Pace BE-CO Damien Lafarge EN-HE Christophe.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
An overview of current & future functionality David Widegren TS/ASE/EPS 23 February 2008EDMS:
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
CERN General Infrastructure Services Department CERN GS Department CH-1211 Geneva 23 Switzerland Db Futures Workshop
ABT Maintenance Management Maintenance Management ABTEF 16/05/204 T. Fowler.
Application of a CAMMS to CERN’s cryogenic installation park G. Perinić and S. Knoops, CERN.
Maintenance Management Project Status Report Follow Up Pierre Bonnal DG-DI Christophe Delamare GS-ASE Marine Gourber-Pace BE-CO Damien Lafarge EN-HE Christophe.
Maintenance Management Project EN Dept. Implementation Project Mario Batz EN-CV Maintenance Management Workshop 25 th November 2011 EDMS EDMS
Damien Lafarge on behalf of MMP Engineering Department Work Organization, Maintenance Planning and Maintenance Experience session Pierre Bonnal Christophe.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
Review of the processes released in the framework of the MMP Goran Perinić.
TE-CRG Activities D. Delikaris, TE-CRG.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
11T Quality Assurance O. Housiaux, R. Berthet, S. Menu, R. Principe 3rd International Review on the 11T dipoles at collimator Section for the HL-LHC 6-8.
C. Mugnier, D. Lafarge, C. Perolini, R. Pilon, J. Ruiz-Cabezas
Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Industrial contributions to the maintenance of CERN.
Computer Jobs Data Entry Operators Computer Librarians
Pierre Bonnal DG-DI Christophe Delamare GS-ASE
ARIES WP 6 / Task September 2017
Performance monitoring framework for the technical infrastructure
How to Pass SMRP (Society of Maintenance
Internship final presentation
Reliability Analysis & Infor EAM
Quality Assurance applied to Accelerator Safety
The MTF adjusted system to meet Vacuum Group needs
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
Mauro Morandin & Antoine Daël
GIS Portal Racks Project
Product Development Scenario Overview
Database Administration
Infor EAM in the Handling Engineering Group at CERN
L&V Manpower Development Prepared by: HR department Mar, 2013
Presentation transcript:

Many entry points to improve reliability! Research, Prototyping, Development QA & Testing Manufacturing & Installation Commiss- ioning Operation Technical Support Maintenance Research, Prototyping, Development

ARW2013

Example – data consistency problem PROCUREMENT SPARES CENTRAL WAREHOUSE ENGINEERING DEPARTMENT MANAGEMENT FRED QUALITY MANAGEMENT OPERATION FINANCE HR, ADMIN PLANNING MAINTENANCE

All is fine … or not?

How to promote change?

corrective maintenanc e preventive and predictive maintenance

Joe: Where is the electric distribution box located? Fred: What is the power of the broken down motor? Don: Who has taken the assembly drawing from the folder? Greg: Where on the server is that damned file – my link does no longer work! Kate: Is the schematics in the rack still valid? Ron: Can I intervene without stopping the machine? Ted: OP, IMPACT, Planβ, CMMS, work permit, fire permit, … have I not missed to inform someone? Chris: Can I call my pump MBExyz? Sam: “The P1 stock was empty, I had to get it in P6. Bob: “Damned, we forgot to repair the dismantled shaft seal.” Tom: “If I only knew how many to order each time.” Boss: “Finally, do we have the seal or not?...And call VAC if they have one.” repair efficiently OR: Do any of these problems sound familiar to you?

The Maintenance Management Project (MMP) at CERN Pierre Bonnal Christophe Delamare Marine Gourber-Pace Damien Lafarge Christophe Mugnier Goran Perinić Regis Pilon Ingo Ruehl Eric van Uytvinck David Widegren Zornitsa Zaharieva M aintenance M anagement P roject Accelerator Reliability Workshop th April 2013 DG-DI GS-ASE BE-CO EN-HE TE-EPC TE-CRG TE-EPC EN-HE EN-EL GS-ASE BE-CO + Change

Why talking about maintenance at CERN? examples of systemsnumbers Warm magnets (TE-MSC)5’000 assemblies Cryogenic magnets (TE-MSC)1’800 assemblies Power converters (TE-EPC)4’500 assemblies Cooling and ventilation components (EN-CV)56’000 equipm. Industrial controls (EN-ICE)215 types Access control systems (GS-ASE)3400 assemblies Process plants (cryogenics) (TE-CRG)35’000 equipm. Radiation monitoring equipment (DGS-RP)1’700 assemblies Power supplies, power distribution (EN-EL)46’000 equipm.... AND MANY MORE numbers from the computer aided maint. mgmnt. system – CMMS > 500’000 functional positions/assets > 90’000 parts > 140’000 work orders per year 3290 maintenance plans TODAY THE CMMS COVERS PROBABLY ONLY 50% ! CERN maintenance strategy: The maintenance of the accelerator components is ensured by the specialized equipment groups in the four technical departments. Question: Where are the potentials for improvement?

External audit of the maintenance task at management level Working group of computer aided maintenance management (CMMS) users External audit of 4 selected CMMS users Internal audit on maintenance in the Technology department Setting up an inter-departmental project team Setting up topic working groups: asset management, documentation management, spare part management, work management and reporting & analysis HERMES project management method

Starting point – several audits The maintenance management project shall help each stakeholder to make measurable advancements in the maturity of his/her maintenance process. The MMP project is about HARMONIZING processes, methods and tools.

During the 6 month pre-analysis phase the working groups have: Gathered user needs Confirmed project objectives Identified constraints Developed concepts/solutions Listed requirements Identified sub-projects

Common key-definitions A common naming/coding reference Description of maintenance processes in BPMN The issue concept The maintenance information concept The metadata and search concept Criticality ranking system oriented to the operation/equipment level The roles concept The inter-departmental methods office concept MMP Concept Report EDMS

Description of maintenance processes in BPMN

Common key-definitions A common naming/coding reference Description of maintenance processes in BPMN The issue concept The maintenance information concept The metadata and search concept Criticality ranking system oriented to the operation/equipment level The roles concept The inter-departmental methods office concept MMP Concept Report EDMS

Logbook, ISSUE, CMMS – ideally three layers in ONE system Entries are linked accross the layers Data available for analysis by all stakeholders LOGBOOK observations ISSUE problem analysis The issue concept 4 CMMS (Infor EAM) physical interventions

Common key-definitions A common naming/coding reference Description of maintenance processes in BPMN The issue concept The maintenance information concept The metadata and search concept Criticality ranking system oriented to the operation/equipment level The roles concept The inter-departmental methods office concept MMP Concept Report EDMS

Inter-departmental methods office Staffing: equivalent of 5 engineers 3 technicians for documentation and asset management support Mission: collect as-is business processes elaborate harmonized maintenance business processes, methods and tools assist users in setting-up maintenance processes assist users in the further development of their maintenance processes trigger and sustain networking between maintenance responsibles

Inter-departmental methods office Asset management tools for Registering equipment Collecting and registering spare part data Labelling equipment

Inter-departmental methods office Information management tools for Digitalization, formating,uploading and linking of documentation

Inter-departmental methods office Intervention management Harmonized CMMS workflows Simplified CMMS interfaces

Project advancement MMP Roadmap Feb 2012 MMP Concept Report May 2012 Maintenance workshop Nov 2011 Methods office implementation July 2012 CMMWG CMMSB Aug 2010 Audit of the operation of LHC and its injectors” audit in 4 groups (BalticBerg) internal TE audit (C. Mugnier) First methods office results: Asset management tools registering equipment collecting and registering spare part data Information management tools digitizing, formatting, uploading, linking Work management tools

The roles concept for a modern maintenance organisation at CERN A group quality/methods officer role (GQMO): - promoting policy, procedures and standards - implementing a QA system at group level A group maintenance information officer role (GMIO): - promoting good practices and guaranteeing coherent management of information and documentation A group coding officer role (GCO): - link person with naming service - promoting good practices and guaranteeing that coding is coherently implemented at group level A group spare part officer role (GSPO): - promoting good practices - providing support for managing spare part processes 8

All working groups (MMP team) Quality/methods officer Maintenance document officer Coding officer Spare part officer The maintenance management roles concept Establish efficient communication of MMP with stakeholders especially for the implementation phase Allow propagation of documents, methods, procedures and processes Collect return of experience through working groups Prepare the cultural change 8

Common key-definitions A common naming/coding reference Description of maintenance processes in BPMN The issue concept The maintenance information concept The metadata and search concept Criticality ranking system oriented to the operation/equipment level The roles concept The Maintenance Implementation Office concept MMP Concept Report EDMS

Maintenance strategies Basic elements must be in place: asset management documentation mgnt. intervention mgnt. Collected data will allow strategic choices Run to failure Preventive maint. Predictive maint. Consolidate G. Perinić and D. Lafarge for the MMP team28