Energy and Power Supply Papua New Guinea 1. PNG Power Limited PNG Power Ltd  is a State owned Corporation with the Government’s ownership interest held.

Slides:



Advertisements
Similar presentations
UK-Malawi Trade & Investment Forum March 20, 2013 Energy Sector Perspectives Rob Mills World Bank.
Advertisements

EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
REGULATORY AND INVESTMENT CHALLENGES IN HYBRID POWER MARKETS IN DEVELOPING COUNTRIES REGULATORY AND INVESTMENT CHALLENGES IN HYBRID POWER MARKETS IN DEVELOPING.
- P G Ajith kumara.  Introduce strong community/ business concept  Build capacity of non technical aspects  Build capacity of technical Aspects  Identify.
Cambodia’s Profile in Power Sector The First Mekong Energy and Ecology Training May 11-30, 2009, Thailand TONN KUNTHEL, BY HOUR & PHALLUY.
Indian gas regulatory framework: Industry issues.
1 Licensing Pension Funds and Trustees Conference on Supervision of Pension Systems Warsaw September 2006 Ross Jones Deputy Chairman Australian.
Donors’ Conference on Sustainable Energy for Kosovo
Albanian power market Sokol RAMADANI Chairman ERE- Albania 1 FEBRUARY 2012 Electricity market design and regulatory issues in Albania and South East Europe.
TARIFF REGULATION IN THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY
THE STATUS OF POWER SECTOR REGULATION IN NEPAL THE ELECTRICITY TARIFF FIXATION COMMISSION FORMED IN 1994 IN ACCORDANCE WITH ELECTRICITY ACT OF 1993.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
BUSINESS OPPORUNITIES IN SAUDI POWER SECTOR US-Saudi BUSINESS OPPORTUNITIES FORUM CHICAGO April 28-29, 2010 Ali Albarrak President &C E O Saudi Electricity.
Bridging Nigeria’s Infrastructure Gap By M. K. Ahmad Director General National Pension Commission – Nigeria 1 18 November, 2008.
World Forum on Energy Regulation IV Athens, Greece October , 2009 Regulatory challenge of Russian energy sector reform Dominique Fache, General.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
ENTELA SHEHAJ Albanian Energy Regulator (ERE) DOES MONITORING METHODOLOGY MATTERS? Electricity Market Monitoring in Albania.
Citi REO Strategy & Community Relations September 15, 2009.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
Competition and Regulation Interface in Developing Countries: Realities from the Power Sector By Ama Asantewah Ahene* and Emmanuel A. Codjoe** *Institute.
Regulatory Flexibility Committee Competitive Procurement September 18 th Joe Kerecman Director Government and Regulatory Affairs
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
Regulatory Transparency and Interaction with the Government Dr. Konstantin Petrov Head of Section, Policy and Regulation.
Electricity Reforms in Bangladesh
Private Sector Operations The AfDB as a Development and Business Partner July 20, 2011.
1 United States Agency for International Development (USAID) National Association of Regulatory Utility Commissioners (NARUC) Sponsored.
DATA COLLECTION ISSUES (DATA SOURCES, STATISTICAL UNITS AND APPROACHES TO DATA COLLECTION) PROBLEMS AND SOLUTIONS. By Salami R Ayodele National Bureau.
VENCorp Revenue Proposal 1 July 2008 to 30 June 2014 Initial Public Forum Presentation.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
Dr. Ion LUNGU AFEER President. DRIVERS FOR INVESTMENTS Demand; Fuel availability; Market signals; Production costs; Energy mix; Environmental concerns;
ENERGY REGULATORY AND MARKET DEVELOPMENT FORUM November 4, 2010 The Honorable Philip D. Moeller Commissioner Federal Energy Regulatory Commission “ENERGY.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Overview of a Water Action Plan: California Public Utilities Commission Paul G. Townsley, President Arizona American Water January 18, 2011.
An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.
Reasons for Pursuing DG in Ontario Presented by: Mark Wolnik Markham Energy Corp -Director March 5, 2003.
IPP and Corruption in Indonesia Fabby Tumiwa Institute for Essential Services Reform 14 th IACC Workshop CLEAN ENERGY 13 November 2010.
World Bank Framework for Energy Trade in South East Europe David Kennedy World Bank.
1 Belarus CEM Discussions Energy Sector Stable sector structure and governance over the past decade together with recent macro economic performance of.
Utah Geothermal Power Generation Workshop Regulatory Issues August 17, 2005 Presented by Becky Wilson Utility Economist Utah Public Service Commission.
Commission For Energy Regulation Padraig Fleming Manager, Distribution & Retail 22 nd July 2004.
1 Vienna Economic Forum –VEF- ERE AND THE REGULATORY FRAMEWORK FOR THE PRIVATISATION OF DSO Bujar Nepravishta Chairman of ERE Tirana-8 th and 9 th June.
REPUBLIC OF MACEDONIA STATUS REPORT ON MEETING THE COMMITMENTS OF THE ATHENS MOU SEEERF IV PERMANENT HIGH LEVEL GROUP MEETING Athens, Greece September.
Illinois Wholesale Market Update December 10, 2003.
POWER SECTOR, ENERGY RELATED RESEARCH POTENTIAL in LITHUANIA by dr. Anzelmas Ba čauskas Lietuvos energija AB, Lithuania CENTRAL-EASTERN EUROPEAN ENERGY.
SAFIR WORKSHOP: MARKET DEVELOPMENT AND REGULATORY PROCESSES Craig Glazer Vice President—Governmental Policy PJM Interconnection, L.L.C. Washington, D.C.
Implementing Power Rationing Programs The Tanzania and Uganda Experience Karen Rasmussen (AFTEG)
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
ITCILO/ACTRAV COURSE A Capacity Building for Members of Youth Committees on the Youth Employment Crisis in Africa 26 to 30 August 2013 Macro Economic.
Gints Zeltiņš Commissioner of the Public Utilities Commission of Latvia Multi-sectoral regulator: Public Utilities Commission of Latvia.
RFPEG Belize 2013 Public Utilities Commission. Objectives of RFPEG Belize 2013 PUC Act: Section 22 (1)It shall be the duty of the Commission to ensure.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
STATE ENERGY REGULATORY COMMISSION (SERC) Prof. Konstantin Shushulov Chairman Budapest, Hungary May 19, th Annual Meeting of the Energy Regulators.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
CARILEC. An Association of Electric Utilities CARILEC An Association of Electric Utilities The Caribbean Electric Utility Service Corporation (CARILEC)
Chairman of the Board and CEO,
Damitha Kumarasinghe Director General
Economic Regulation of Irish Water
Distribution Tariffs in Brazil
REFLECTED IN JAMAICA’S ENERGY POLICY
ERERA AND ECOWAS ELECTRICITY MARKET DEVELOPMENT AND REGULATION
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
PNG Power SAFE, RELIABLE & FINANCIALLY VIABLE
Albanian power market ERE- Albania Sokol RAMADANI Chairman E R E
Presentation transcript:

Energy and Power Supply Papua New Guinea 1

PNG Power Limited PNG Power Ltd  is a State owned Corporation with the Government’s ownership interest held by the Independent Public Business Corporation.  is a vertically integrated utility – generation, transmission, distribution and retail;  has major transmission and distribution networks in Port Moresby, Ramu Valley and Gazelle Peninsula (Rabaul) that are supplied by major hydro power plants;  also supplies electricity to 16 regional centres predominantly by diesel powered thermal generation (over 170 generating units).  PPL currently supplies around 100,000 customers with 1080 GWH of electricity from 390 MW of nameplate generation capacity. 2 History and Ownership PNG Power was created in July 2002 when the electricity assets, liabilities and undertakings of the Government owned statutory corporation Elcom (formerly the Electricity Commission of PNG) were transferred to PNG Power Limited. At the same time, the assets, liabilities and water use permits of the Sirinumu Dam and Yonki Dam were transferred to PNG Dams Limited. Both PNG Power Limited and PNG Dams Limited are:  companies incorporated under the Companies Act  100% owned by the General Business Trust of which the Independent Public Business Corporation (IPBC) is the trustee.

3

4 PPL has successfully established a K476m debt facility with a syndicate of local financial institutions and over the past 5 years invested K692m in infrastructure refurbishments, expansions and extensions. Financial and Infrastructure Investment Milestones

Under the existing Regulatory Contract with the ICCC, increases in fuel costs (about 40% of the operating costs in 2012) are not passed through to tariffs until the following year after a recalculation in December – effectively up to a 15 month lag. PPL was required to manage any cost increase throughout the year making it very difficult to operate the business and to make long term maintenance and infrastructure investment commitments with such a large swing in earnings associated with volatile world oil prices. In 2011/12 the Regulatory Contract was reviewed. PPL sought to change the methodology used to pass on costs through fuel cost changes to mitigate this risk. This review approved and effected in 1 st January 2013 enabling PPL to review tariffs every quarter 5 Volatile World Oil Prices lead to “Rollercoaster” Financial Returns

PNG Power’s operation is subject to a range of legislation including:  Electricity Industry Act 2002 – this covers licensing of electricity undertakings, licensing of contractors and electricians, safety and technical requirements;  Independent Consumer and Competition Commission Act – this covers price and service regulation, competition and fair trade practices;  Companies Act – for corporate governance and statutory requirements;  Income Tax Act – covering taxation matters; and  Independent Public Business Corporation Act – sets out reporting and other requirements and the basis for appointment of Directors. PPL holds four licences under the Electricity Industry Act 2002 for the generation, transmission, distribution and retailing of electricity. The key terms of the licences are:  access to transmission and distribution networks must be granted to third parties on non discriminatory terms – a third party access code is in currently in development by the ICCC through a World Bank funded project  PNG Power has an exclusivity to sell electricity within 10 km in any of the 35 designated service areas to premises where the demand is less than 10 MW. Projects for supply outside of the 10km boundary and/or to customers larger to 10MW can be developed by any interested party. 6 Industry Governance

The Electricity Industry Policy of Papua New Guinea The Government of Papua New Guinea (GoPNG) has adopted an Electricity Industry Policy (EIP) that encourages competition and private sector investment in power generation. The means of achieving this in an efficient and cost effective manner is to develop generation projects through a competitive procurement process in accordance with international best practise procedures. The procurement process will be based on transparent rules designed to maximise fairness and competition and on standard model documents that minimise transaction and development costs. Overall, the goal is to encourage investors to accept reasonable risks that they are well able to manage in terms of efficient financing, construction and operation of power plants that maximise generation availability and flexibility. In accordance with the EIP, PNG Power Ltd has initiated three procurement processes for Independent Power Producers (IPPs) for Port Moresby, Lae and Kavieng. 7

Key challenges and opportunities Challenges Replace/refurbish aging assets base, meet demand growth and improve supply reliability without excessive impact on the price of electricity. –ADB is funding PPL with US$150 million for small hydro schemes in diesel based supply centers as well as US$80 million for upgrades to generation, transmission and distribution in Port Moresby. –JICA is providing US$70 million of low cost funding for refurbishment and strengthening of the Ramu transmission system. Support private investments in generation through transparent and fair processes. Maintain a stable and supportive policy environment. –Appropriate implementation of the EIP –Generation development policies, e.g. geo-thermal policy, grid code, third party access code, etc. Support mineral projects with access to cost-effective power supply solutions. 8

Key challenges and opportunities Opportunities Privatize and incentivise the generation space through competitive bidding processes for Independent Power Producers. Fund and construct (PPL and/or private investors) major power plants (hydro, geo-thermal, gas) on the back of mineral projects. Potential flow on effects (e.g. surplus power) to existing customers in PPL’s grid. Example projects: –Yanderra mine – 100MW –Wafi Golpu – 200MW Leverage domestic gas supply to provide affordable power to businesses and the people of Papua New Guinea. –Gas in Port Moresby could more than halve the current fuel bill of K120 million –Gas in Ramu system could meet major mining loads as well as offer cost effective incremental supply to load growths 9

Total 403,943.0 IPP 42,112 Total PPL 361,831.0 Total Available 224,377 56% PPL Hydro 169,096 42% PPL Thermal 192,735 48% IPP 42,112 10% Last 5-years Capex budget K110-K200m 60% internal and 40% external

THANK YOU!