Overview of On-going Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005.

Slides:



Advertisements
Similar presentations
MuCool Outlook and Plans  Over the past year we have had a very successful program that will be detailed in the next two sessions: u MuCool Test Area.
Advertisements

MICE OsC – 22 nd June 2010 Liquid-hydrogen system and absorber M Hills T Bradshaw M Courthold S Ishimoto W Lau I Mullacrane P Warburton.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
Agreement on scope of supply and extent of interface among different suppliers of the AFC module This talk covers the scope of supply on the Absorber Focus.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Proposal for Convection Absorber Test with Hydrogen at Fermilab Barry Norris Representing colleagues in BD/Cryogenics February 21, 2003.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov.
MTA Cryostat & cooling loop design Christine Darve Fermilab/Beams Division/ Cryogenic Department/ Engineering and Design Group Preparation of the Mucool/MICE.
Cryogenic Facility for Mucool at Linac MUCOOL – MICE meeting Barry Norris, Engineer, Beams Division/Cryogenic Dept. Fermilab phone:
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
MUTAC Review 3/16/06 A. Bross MuCool Overview and Plans Muon Cooling R&D MUTAC Review March 16, 2006 A. Bross.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Fermi National Accelerator Laboratory FERMILAB CRYOGENIC STATUS Beams Division Cryogenics Barry Norris (overseer) Alex Martinez (helium cryo) Christine.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Mucool cryo-design Christine Darve Fermilab/Beams Division/ Cryogenic Department 8/12/02.
1 MICE Hall Layout MICE Collaboration Meeting, LBNL, February 12, 2005 Paul Drumm for Yury & the RAL team.
Current status Arkadiy Klebaner November 21, 2012
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Options for Absorber Testing Barry Norris’s Random Thoughts November 8th, 2002.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.
CD-03/12/06 – IIT NFMCC meeting Flow Absorber Possibilities C. Darve Fermi National Accelerator Laboratory Batavia, IL, 60500, USA Neutrino Factory & Muon.
MTA Cryogenics: Where We Are The Work of Fermilab AD/Cryo Barry Norris, Christine Darve and a host of wonderfully talented Cryogenic Personnel John Thompson,
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
HD target.
Hydrogen Pre-Operation Safety Review 4 th October 2011 Results from Helium Commissioning M Hills.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
805 MHz Status IIT NFMCC Meeting March 12-15, 2006 A. Moretti March 12, 2006.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
April 19, 2006A.Klebaner Cryogenics for ILC TA Current Status Plans and issues.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
New compressor station Second stage of nitrogen system (N2 refrigerator, cryogenic tank, pipe lines) Cryogenic equipment required to run NICA Third stage.
MTA RF Status 01/31/ 2007 NF&MCC Meeting UCLA A. Moretti.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
CMTF Infrastructure Jerry Leibfritz PIP-II Machine Advisory Committee 9-11 March 2015.
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
S A Griffiths CM42 June 2015 Electrical & Control.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Teleconference ACS – FREIA 31th May 2017
CBETA Technical Review
FRIB Cryogenic Support
IT-4189 Supply and installation of a cryogenic distribution system
MICE Meeting at RAL, Oct-23, 2005
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
BDS Cryogenic System RDR Status and EDR Plans
Teleconference ACS – FREIA 10th May 2017
Teleconference ACS – FREIA 17th October 2017
Teleconference ACS – FREIA 31st October 2017
Status of the cryogenic system for B180
ESR 2 Presented to Joint Hall A/C Summer Meeting
Operator Training Requirements
PANDA The conceptual design of the control Dewar
Teleconference ACS – FREIA 19th June 2017
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

Overview of On-going Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005

The MuCool Test Area (MTA) Compressor Refrigerator Helium gas buffer Nitrogen dewar Experimental Hall Hydrogen Vacuum buffer Xfmer Location Gas Room

Cryogenic Effort Is On-going within Three Different Areas Support of Solenoid Move to MTA Overall Refrigerator and Compressor Complex Support of Continued Future Testing of KEK and Forced Flow Absorber Work

Cryogenic Effort #1 Support of Solenoid Move to MTA Mechanical effort underway… Piping installed for helium and nitrogen vents Helium transfer line taken from Lab G and modified to make more optimal use of helium Working with Al Moretti to understand transfer line positioning and shielding requirements

Electrical effort underway… Layout of cable runs, instrumentation on- going Implementing Class 1, Division 2 requirements into installation Relay rack installed and wired at MTA Using PLC and Internet Rack Monitor …ability to monitor all solenoid cryogenics from ACNET

Top View of Experimental Hall Top View of Open Air Pit Solenoid

Cryogenic Effort # 2 Overall Refrigerator and Compressor Complex

400 Hp Screw Compressors in Original Fermilab PS4 Site

Present Status Completed Mechanical Piping Drawing Mid-December 2004 Fermilab Contracts sending out Bid Requests This Week Bids Required Back by February 28 th, 2005

Bottom Line on Refrigerator Complex In March or Early April we anticipate the beginning of piping install…90 day contract anticipated Following contractor work: 3-4 month controls installation Refrigerators and Compressors could be fully operational by Oct 2005

Transfer Line Connection from Refrigerator Hall Farmed out to Fermilab Particle Physics Divison (PPD) Goal for completion for installation stage is Oct 2005 Until this connection becomes fully functional, we will operate with dewar fed system

Cryogenic Effort #3 KEK and Forced Flow In regards to KEK… 79 foot long transfer line for hydrogen test caused excess usage of helium as well as instabilities…we will shorten transfer line and validate instrumentation…hope to incorporate this into mechanical efforts of Solenoid Need to consider KEK cryostat itself and desire to re-instrument…KEK needs to take lead in this as well as resolve heater questions

In regards to Forced Flow Cryostat… Original 3D model exists for Cryostat Bates “Sample” Hydrogen Loop Project Completion On-Hold … Lack of Engineering Priority (Refer Details to Christine Darve talk)