PRE-BID MEETING CONSTRUCTION OF MEDUPI BORUTHO 400kV TRANSMISSION LINES PRE-BID MEETING PROJECT MANAGEMENT Presented by: Theo Meveni 13 January 2015.

Slides:



Advertisements
Similar presentations
Project Scheduling and Crashing. Recall the four stages Project Conceptualization and Definition Project Conceptualization and Definition Project Planning.
Advertisements

Capital Project Cost Reporting. Project Goals Documentation of project approval Approval path based on reporting structure and individual approval limits.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
1.040/1.401 Project Management Spring 2007 Lecture 7 Dr. SangHyun Lee Department of Civil and Environmental Engineering Massachusetts Institute.
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
Activity on Arrow (AoA) Network Diagrams
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
Common Cause/PA Website Project. Common Cause of Pennsylvania Who are they? Volunteer based nonpartisan nonprofit advocacy organization What do they do?
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
IOWA STATE UNIVERSITY Department of Civil, Construction and Environmental Engineering Cost Estimate for Different Wind Turbine Technologies Bin Cai Wind.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Thomas C. Nehring, P.E. Lead Electrical Engineer CFAC Review November 9-10, 2009.
Microsoft Office Project 2007: Managing Projects.
Alternativenergy Flat Ridge Wind Facility Ted Hofbauer – Asset Manager.
Office of Project Management Metrics Report Presentation
A brief overview of the project By Group 2 Barry Amir Bhumi Shubh
ELG4125 Transmission and Distribution Systems
PROJECT COMPLETION TIMELINE
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Power Transmission & Distribution Project LARSEN & TOUBRO LIMITED ECC DIVISION Front Page
Module 7 Session 7.3 Visual 1 Module 7 Planning and Scheduling with the Critical Path Method Session 7.3 The computer and project management.
Presented by :- Lipika Biswas, TGT (Science) K.V. Ballygunge.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
TOF Project Construction Project Plan
Baku By Anish and Ari. Baku Baku is the capital of Azerbaijan Baku is the largest city in Azerbaijan.
Mortenson Canada Corporation Proprietary and Confidential Construction and Contracting Clean Energy BC November 8, 2010.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
BSBPMG522A - Undertake Project Work
PRJ566 Project Planning and Management Project Management Concepts 1.
GSI-Cryoexpertmeeting; 19. & Cryoplant for series test facility Standard plants have a capacity up to A capacity of about 1,5kW is.
12/2/2004Module 2A1 The NCSX Engineering Web – An Overview Part I Work Planning, Project Files, Management Plans and Procedures.
MBOMBELA LOCAL MUNICIPALITY MUNIC PROGRESS 08 April 2010.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Abrasion Testing of Critical Components of Hydrokinetic Devices Monty Worthington.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
VOWTAP Progress Report VOWDA December 2, DOE Grants VOWTAP Extension No Cost Time Extension until May 31, 2016 Conditional upon achievement of two.
October 4-5, Status of ARRA funded AIPs Stochastic Cooling Alex Zaltsman October 4, 2010 Stochastic Cooling cost and schedule.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
Microsoft Project 2010 ® Tutorial 1: Planning a Project.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
DEPARTMENT OF ROADS AND TRANSPORT LIMPOPO PROVINCE INFRASTRUCTURE.
Performance of the Integrated National Electrification Programme as at 30 June 2008 (4 rd Quarter) Presentation to the Select Committee on Finance 14 August.
Strategic Planning Deanna Herwald Vice President-Quality Management Systems.
Welcome! Harlan Kilmon, PMP, MCT, MCITP CompTIA Project + ITIL v3 Foundation.
HiLumi-LARP Annual Meeting November 2014 MQXF pre-series and series magnets fabrication plans Ruben Carcagno November 19,
Public Tender for Comprehensive Project to award GTS Project in concession “AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE (circuit two)” GTS: Guaranteed.
HCIS 410 Read, Lead, Succeed/Uophelpdotcom For more course tutorials visit
Group Technology HV Plant By: Sakkie van AardeDate: Slide: 1 of 5 Fault Path Indicators CLARIFICATION MEETING Presented by: Sakkie van Aarde.
POWER DELIVERY PROJECTS MEDUPI POWER STATION INTERGRATION CONSTRUCTION OF 400kV TRANSMISSION LINES Medupi - Massa 1 and 2 Pre-Bid Meeting 17 April.
CIS 170 MART Teaching Effectively/cis170mart.com FOR MORE CLASSES VISIT HCIS 410 AID Inspiring Minds/hcis410aid.com FOR MORE CLASSES.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
1 Risks at Komati Water Scheme PED Operations. 2CONTENT  Executive Summary  Pump station layout schematic  KWS Maintenance risks  KWS Operational.
PRE-BID MEETING CONSTRUCTION OF THE MEDUPI-BORUTHO TRANSMISSION LINE PRE-BID MEETING Finance (Foreign Exchange) Clarification Presented by: Charlene Strydom.
PKP Energetyka S.A. – Projects. QUALITY, SAFETY, COMMITMENT, EFFICIENCY Documents Schedule Scope Structure Risk Targets Questions.
“AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE
CSP 25th November 2010 Technical agreement number 3: overview
(Selected) Project Management Processes at the XFEL
POWER SYSTEM PLANNING AND DESIGN. TITLE : DESIGN OF EHV TRANSMISSION LINES & BUNDELED CONDUCTORS IN EHV LINES. PREPARED BY : JOBIN ABRAHAM.
Note: You can print this template to use as a wall calendar. You can also copy the slide for any month to add to your own presentation. New Year’s.
PUBLIC PARTICIPATION MEETING FOR CONSTRUCTION OF A 400KV ±250 KM POWER LINE FROM BORUTHO S/S IN MOKOPANE TO BOKMAKIERIE S/S IN NZHELELE & ASSOCIATED SUBSTATION.
Project Status: [Project Name]
Note: You can print this template to use as a wall calendar. You can also copy the slide for any month to add to your own presentation. New Year’s.
Status Report [Project Name] [Client]
GLAST Large Area Telescope:
Dr. Elizabeth M. Anthony Humanities Department FSTPi, UTHM
PROGRESS REPORT Dr. Elizabeth M. Anthony FSTPi, UTHM
Overview Cost to Complete
Leadership Frames of Mind
Land Acquisition. BORUTHO NZELELE 1X400 kV Transmission Line Servitude Acquisition Process By Phuti Makweya.
Presentation transcript:

PRE-BID MEETING CONSTRUCTION OF MEDUPI BORUTHO 400kV TRANSMISSION LINES PRE-BID MEETING PROJECT MANAGEMENT Presented by: Theo Meveni 13 January 2015

2015/01/132 Scope of Work Executive Summary Medupi Borutho 400kV Line, Section A  Construction of 84 kms kilometers of Medupi Borutho 400kV Transmission Power Line in the Lephalale area of Limpopo Province.  Construction of 2 underpasses first one outside Medupi Power station and the second one 25 km away from Medupi P/S. Medupi Borutho 400kV Line, Section B  Construction of 90kms kilometers of Medupi Borutho 400kV Transmission Power Line in the Mokopane area of Limpopo Province.

Project Scope of Works  The construction need to be done in accordance with Eskom design and specifications.  Medupi-Borutho 400kV Line Final Design Report- U.TX Rev1  Medupi-Borutho 400kV Transmission Line Specification- U.TX Rev1  Medupi-Borutho 400kV Line Templating Report- U.TX Rev /01/13

Scope of Work Cont…………. 4  The Scope of Work Includes:  Access roads and infrastructure  Bush clearing  Tower foundations and stay wire foundations  Fabrication and erection of structural steel transmission towers  Installation of hardware, conductor and insulators  Tower assembly, stringing and labelling  Conductor Regulation  The lines run through a predominantly game farming, agricultural land and a villages. 2015/01/13

Scheduling Requirements NO REQUIREMENT 1 A3 Hard copy 2Electronic copy (not PDF) must be available 318 Months Duration, assume effective start date (Both Section A and B) 4Durations of the activities 5Critical path 6Resource usage 7 Key milestone dates e.g foundation completion date, tower assemble, erection 8Calendar days including holidays 9Risk Allowance e.g rainfall 52015/01/13

6 Questions? 2015/01/13

Thank You