Atlas status report. LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

ATLAS LHCC 28/11/00 A. Henriques/CERN 1 H8 : Pixel, SCT, TRT, Tiles, LAr em barrel, Muons SPS H6: EMEC, HEC, FCAL, Background studies GIF: Muons (MDT,
The RPC Closed loop Gas System. Schedule for completion - update Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not completely.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
T. Kawamoto1 Small Wheel upgrade project Muon week, upgrade meeting T. Kawamoto.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
ATLAS EXPERIMENT INTEGRATION TASK: SPACE MANAGEMENT Tatiana Klioutchnikova 05/06/
ATLAS muon endcap 1 layer of tracking chambers (MDT) 3 layers of trigger chambers (TGC) which we are working on ATLAS TGC installation and commissioning.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
The RPC Closed loop Gas System Slides from Bianco and Guida.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13.
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
Main priorities for the next years. Where do we stand Muon system in good shape (in my opinion) – Sub-systems hardware quite robust (see later for main.
Michel RAYMOND – April 14 th, 2011 Technical Support Activities in PH-ADO-PO Goals for 2011.
ATLAS and CERN/ST 2nd April 2003 Marzio Nessi. 02/04/2003 Today ATLAS project Detector Components Construction Detector Integration and Installation ATLAS.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
Luca Spogli Università Roma Tre & INFN Roma Tre
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
ATLAS Tile Hadronic Calorimeter:
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
ATLAS closing scenario  Where we are  What is still be done before closing (ADO-PO support)  Closing scenario / Procedure / Schedule Prepared by Michel.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
CSN1 4 Aprile 06L.Mandelli1 Stato Generale di Atlas Aprile 06 Sottosistemi –Toroidi –Solenoide –Mu Barrel –Mu EC –LAr e Tiles –TRT –SCT –Pixel –LV1 –DAQ.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Installation of the T600 at Fermilab CSN2, September 22,
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
Muon barrel cooling G. Aielli and J. Godlewski LS1 TC planning.
Status on closing operations End cap calorimeter side A Forthcoming operations ATLAS – April 17th, 2009 Prepared by Michel RAYMOND.
AEM, Sept Frank Chlebana (Fermilab) Status of the LHC and CMS Frank Chlebana (Fermilab) All Experimenter’s Meeting Sept
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
February 26 th 2013Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
Preparation for Running Outline Present Schedule Detector Preparation Requests for dedicated runs –Cosmics, Splashes, Alignment Muon Shifts Experts A.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
`` ATLAS inner detector JV Els KoffemanAtlas - Inner Detector1 Tracking in solenoid 2 Tesla field – 3 pixel layers with 50 um x 400 um cells – 4.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
MICE Spectrometer Solenoids Step IV running
ATLAS-MUON Trigger hardware developments
The LHC - Status Is COLD Is almost fully commissioned
for the transition region on behalf of the RPC upgrade group
The Status of the LHC Machine and the Experiments
Commissioning of the MUON Spectrometers in ATLAS and CMS
Technical Support Activities in PH-ADO-PO
Installation plans from mid 2005
L H C A T L A S International Collaboration on the LHC Project
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
Presentation transcript:

Atlas status report

LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close the cavern by the 11 th of August

Today installation status Detector closed, mechanical installation ended with the positioning of the last shielding element on side A

Beam Pipe (including LUCID) Closed and on vacuum Bake out at 200C planned for the last week of July when Pixel cold again LUCID connected and being commissioned

Inner Detector All installed, but the TRT wheel C (2004 staging plan) TRT today is operational and in test mode SCT/PIXEL need to be cold again, before resuming full commissioning. This means that in the next few months they will be mostly in stand alone mode and will be always under the pressure to join the integrated ATLAS data taking setup

Solenoid Fully tested BT possible interference ruled out with a dedicated test Ready to go, we will not be allowed to have it on during beam tuning and first injections The mapping done last year has given us confidence that we will reach the necessary precision Recent Solenoid test with Barrel Toroid on

LAr Calorimeters Detector is closed. LAr fully installed, cryogenics working fine, damage on cryo line repaired, front end electronics and LV power refurbishing finished. HV problems are stable (hospital suppliers). A new problem came to the surface a few weeks ago. About half of the LV power suppliers of the end caps have a problem with the Barrel Toroid field. For some reason the dedicated B-shielding is not as effective as it was anticipated

Tile Calorimeter All installed, including MBAS scintillators All drawers have been refurbished, all LV powers repaired After closing a few drawers have experience failures and lost of communication, some of it was recovered : o 1 LVPS/HV side problem forces to operate with no HV control Need to correct for different gains offline. o One EB super drawer sends corrupted data always. The count of non usable for physics CELLS is 20 today: 14 in one EB SD and the rest 6 scattered randomly in the drawers There is for sure interest to open and get access during the shutdown to fix these problems

Muon spectrometer All muon chambers installed, a part the staged EE chambers All wheels in final position. The number of problematic channels is very small Still finishing up the connections in the barrel RPCs and the final alignment of a few EO chambers Most alignment rays are operational, showing excellent results

Muon spectrometer next RPCs still have to finish their commissioning before beam arrives Several gas inlets/outlets on the chambers have proven now to be fragile and a campaign of repairs will need to be planned for the next shutdown, which will imply some chambers movement and special access The readout fibers on the MDT big wheels need to be changed for radiation reasons. So the wheels need to be open and access. It is a major enterprise. We have now to plan a realistic scenario for the installation of the EE chambers during the next 2 shutdowns.

Toroids Repair on the He line of ECT-A done. Cooling process started. Still on track for testing the system starting in the last week of July The final balance of forces between end caps and barrel toroids still to be finalysed. In the worse case we might need access to the AFT brackets in July / August, by moving the big wheels back temporarily by few meters

Shieldings All shielding elements in place. We decided non to install the octagonal piece of the JF, to easy the opening during the next shutdown. This component will become important when we go over in luminosity Many and different radiation monitors have been deployed on the detector.

Infrastructure Ventilation: First indications show a temperature gradient of about 3C inside the detector with the maximum on top around 21C. This should be ok for the RPCs. The electrical network is now converging. A lot of debugging was necessary to be able to get the correct behavior in case of problems (see UPS). The gas system is converging, it is stable and performing in recycling mode (see RPC). The flammable gas system is the next in line for debugging. The various safety systems are converging.

What remains critical to be done before starting Bake out of all beam pipes at 200C to bring down pressure from mbar to mbar  need pixel cooling running stable Restart the Pixel/SCT commissioning with the detectors on Fix in sector 13 LAr LV power B-shielding. This probably means running at 15KA field …. Impact on mu-spectrometer trigger system to be understood Once the End-cap Toroid A is cool, test it and then start the overall magnets tests, including force balancing between barrel and end-caps Get TGCs to run stable with n-pentane Have the RPC connection work in the cavern finished Do an overall ventilation test which establishing the final pressure conditions everywere. Lower the temperature by 2-3C General clean up and UX15 in restricted access mode, LHC access system tests 11/15/2007M.Nessi 14

To be done before next shutdown Prepare an improved version of the round scaffolding to access calo region Do an full engineering study for a fast removal/substitution of the Be pipe in case of a major problem. Start preparing the tools Make a plan for consolidation/substitution of the present evaporative cooling proximity plant Prepare a plan for fixing all B-problems related to the LV Lar endcap power Make a plan for changing the MDT BW fibers. When? (barrel must be closed) Plan and preassemble for EE chambers insertion. When? Prepare a few new EIL4 TGC chambers to substitute the broken one 11/15/2007M.Nessi 15

During the next shutdown Open and test the new improved access/scaffolding system Before opening get all radiation protection procedures/tools operational Open calo to fix LV-Lar B-shielding, to fix tiles drawers, to check id-endplate leaks + ….. Open ID-shielding to eventually gain few cm in Z for the next closing (change shims on top fingers) Open MDT BW to change radiation resistant fibers ? Fix and substitute EIL4 TGC broken chambers Start installation of the EE chambers ? 11/15/2007M.Nessi 16