ART and the SLAC program Nan Phinney SLAC. DOE/NSF ART Program Review April 29/30, 2009 Page 2 Linear Collider R&D SLAC has been working towards a Linear.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Nick Walker KEK-DESY meeting 7 th March 2005.
SLAC Accelerator Research and Introduction to SAREC Tor Raubenheimer FACET Users Meeting August 29 th - 30 th, 2011.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
Accelerator Research at SLAC for Future HEP Programs Tor Raubenheimer SLUO Annual Meeting September 18, 2008.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
Performance Evaluations: PPA InterpretationsPage 1 Interpretations on Performance Evaluation Process D. MacFarlane June 4 th, 2009.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Electron Clouds at SLAC Johnny Ng ILC Damping Rings Collaboration Meeting March 4, 2009.
High Level RF Technical System Review GDE Cost Review July Vancouver Canada Shigeki Fukuda & Ray Larsen For the HLRF Cost Team C. Adolphsen,
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Tor Raubenheimer SLAC FY07 Budget Proposal ART FY07 Budget Meeting SLAC May 3 rd, 2006.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Operations, Test facilities, CF&S Tom Himel SLAC.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
AAP Review 横谷 LC 定例 Preparation of AAP Review General charge sets the frame Version of early November Rough structure of the meeting has been.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
ILC-GDE ILC-Americas 9/21/05ILC-Americas Regional Efforts1 G. Dugan ILC/GDE and Cornell University International Linear Collider Industrial Forums Fermilab.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
Mike Harrison LCFOA meeting July 08 Americas ILC Status - Baseline Design Gev e+ e- Linear Collider Energy 250 Gev x 250 Gev Length km.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
June 13, 2007 Global Design Effort 1 ILC Effort at SLAC RDR > EDR Nan Phinney SLAC/GDE.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
SLAC Accelerator Development Program Tor Raubenheimer OHEP Accelerator Development Review January 24-26, 2011.
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
SLAC and ILC Jonathan Dorfan, Director LCFOA, SLAC May 1, 2006 Particle & Particle Astrophysics.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
Tor Raubenheimer SLAC ILC Accelerator Efforts SLAC DOE Program Review June 13 th, 2007.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Americas Regional Planning Exercises Tor Raubenheimer SLAC Beijing GDE Meeting February 4 th 2007.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
P5 Potential US Accelerator Collaboration with the ILC-in-Japan Mike Harrison Mike Harrison.
SLAC Accelerator Research Program Tor Raubenheimer SLUO Meeting, July 17, 2009.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Present and Future Program for Accelerator Research at SLAC
Chris Adolphsen Sergei Nagaitsev
EDR HLRF Work Packages Draft Summary
Electron Source Configuration
Andrei Seryi Materials for discussion TILC-08
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Electron Clouds at SLAC
RF System (HLRF, LLRF, Controls) EDR Plan Overview
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

ART and the SLAC program Nan Phinney SLAC

DOE/NSF ART Program Review April 29/30, 2009 Page 2 Linear Collider R&D SLAC has been working towards a Linear Collider for more than 30 years The science case for a Linear Collider to complement the LHC remains compelling SLAC is committed to a next-generation LC, pursuing many options with different levels of risk and cost ILC: only near term option, lowest risk but high cost High gradient klystron: medium risk with significant cost savings Drive-beam microwave: higher risk with probably greater savings Dielectric or Plasma acceleration: much higher risk but with potential for much lower costs SLAC has strong R&D programs on these different options

DOE/NSF ART Program Review April 29/30, 2009 Page 3 SLAC ILC Effort 2007 > 08 For the RDR, SLAC was the US lead on 5 of 6 area systems & several technical systems AS: Electron & Positron sources, Bunch compressors, Main Linac and Beam Delivery Systems TS: RF power sources, Dumps & Collimators, Commissioning & Operations, Installation + contributions to Damping ring design & lead on e-cloud R&D For 2008, the plan was to narrow focus to e- source, linac & BDS areas + accelerator physics and system integration ─> e+ source, BCs, most DR effort transferred to others TS: large effort on RF sources, smaller efforts on e-cloud R&D and other TS, incl: HA controls & power supplies + major ramp up of engineering design effort

DOE/NSF ART Program Review April 29/30, 2009 Page 4 Impact of 2008 Budget Without ILC funding Q2-4, we continued any generic R&D synergistic with other projects that could be supported on other funds Stopped ILC specific design work and cut back engineering effort down ~ 10 engineers/eng. physicists + cancelled 5 ME reqs Overall reduction of ~ 40 ILC supported FTEs, counting other depts In 2008, we continued R&D on e- source, linac & BDS areas TS: slowed effort on L-band RF sources (but FY08 ~same as FY09 level) stopped PEP-II e-cloud R&D early (PEP-II shutdown) slowed HA controls, cut CFS and Installation engineering SLAC progress on LC R&D in FY08 was made possible because it was embedded in a broad ARD research program and through increased DOE support for accelerator development and SLAC

DOE/NSF ART Program Review April 29/30, 2009 Page 5 ILC in SLAC Organization Particle Physics & Astrophysics Directorate S. Kahn KIPAC R. Blandford Elementary Particle Physics D. MacFarlane Accelerator Research T. Raubenheimer Advanced Accelerator R&D E. Colby LHC Accelerator R&D T. Markiewicz Advanced Microwave Technology S. Tantawi Linear Collider N. Phinney Advanced Computation K. Ko/C. Ng Beam Physics Y. Cai Test Facilities C. Hast SuperB Accelerator M. Sullivan Accelerator Research Division T. Raubenheimer ARD - Accelerator Research Division in Particle Physics and Astrophysics Directorate Linear Collider is the largest department In ARD (21 people)

DOE/NSF ART Program Review April 29/30, 2009 Page 6 Accelerator Research Division (ARD) ARD supports a broad program of accelerator research ILC & Accelerator Science each roughly 1/3 rest is Accelerator Development, LARP, SciDAC, other projects Accelerator Science includes High Gradient, Direct Laser & Plasma Wakefield Acceleration, Beam Physics, Advanced Computation Accelerator Development includes work on LHC, CLIC, SuperB & ProjectX, generic LLRF and Feedback LHC/LARP work includes Phase-II rotatable collimators, beam-beam simulations, crab cavity design, crystal collimation experiments, LLRF modelling, e- cloud tests and fdbk design SciDAC funds development of massively parallel computing

DOE/NSF ART Program Review April 29/30, 2009 Page 7 ARD Budget FY2008 & plans FY07-08 are actuals, FY09 is CR budget, others are projections Large increase in Accelerator Development in FY08, after ILC cuts

DOE/NSF ART Program Review April 29/30, 2009 Page 8 FY08 Actuals (ILC Q1, Other Q2-4) Q1 funds included ~2M$ carry-in from FY07, expected budget $21M$ Q2-4 funds were almost exclusively salaries, M&S to cover earlier commits Commits costed in Q2-4 on ILC funds, included in Q1 (klystron, clean room)

DOE/NSF ART Program Review April 29/30, 2009 Page 9 FY09 Budgets & Q1/Q2 Actuals Q1-2 spending matched to CR budget, now need to ramp up HLRF up - SBK parts & fab, RF distribution & couplers > FNAL DR budget needed increase to support CESR-TA BDS down due to staffing problems, new reqs just posted

DOE/NSF ART Program Review April 29/30, 2009 Page 10 FY06-08 Actuals & FY09 Budgets Even including supplemental FY08 funds for “generic” ILC-related R&D, available funds dropped significantly in FY08, slight increase in FY09. The emphasis changed as some areas were dropped and focus was R&D rather than engineering

DOE/NSF ART Program Review April 29/30, 2009 Page 11 SLAC ILC R&D Effort Synergistic with Project-X R&D and other SC applications L-Band RF power source R&D Modulators Klystrons RF distribution and couplers Klystron cluster concept Electron source R&D Laser and Photocathode development Beam delivery system R&D FFS optics and tuning design Collimation and beam dump design MDI design with FD and crab cavity ATF / ATF2 Test facility Accelerator Physics & e-cloud R&D System Integration & High Availability Hardware

DOE/NSF ART Program Review April 29/30, 2009 Page 12 SLAC in the GDE Organisation Raubenheimer Himel, Dorfan IDAG Himel System Integration Paterson Drell Costing Group Himel ML Systems Adolphsen (HLRF Larsen) e- source Brachmann BDS/ATF2 Seryi

DOE/NSF ART Program Review April 29/30, 2009 Page 13 FY08-09 Accomplishments L-Band RF Power Sources Marx Modulator Prototype operational, installed in ESB Toshiba MBK klystron purchased, installed in ESB RF distribution prototype tested successfully, full CM system > FNAL Clean room purchased for Coupler assembly and processing, begun L-band positron capture structure built & tested Beam Delivery ATF2 hardware complete & tuning software developed High power dump engineering design (with BARC, India) MDI Interface document Crab cavity design Electron source and DR Electron cloud Laser purchased, Gun test lab refurbished after 3 years E cloud experiments successfully completed in PEP-II

DOE/NSF ART Program Review April 29/30, 2009 Page 14 Electron cloud mitigation PEP-II TiN surface much reduced signal with respect to Al Observed new resonance: Electron current peaks at defined B values (n) Test chamber Al and TiN-coated New 4-dipole chicane in the PEP-II LER Mitigation tests in ILC magnetic field Aluminum surface

DOE/NSF ART Program Review April 29/30, 2009 Page 15 New L-Band Station at ESB: Marx Modulator and 10 MW Toshiba Multi-Beam Klystron See Adolphsen Talk

DOE/NSF ART Program Review April 29/30, 2009 Page 16 RF Distribution Modules Four, two-cavity distribution modules were individually high power tested and then shipped to FNAL Isolator Load VTO Hybrid Window Phase Shifter Turned for Visibility RF

DOE/NSF ART Program Review April 29/30, 2009 Page 17 Coupler Assembly in SLAC Class 10 Cleanroom

DOE/NSF ART Program Review April 29/30, 2009 Page 18 KEK SLAC provided magnets, movers, BPMs, diagnostics and has led the tuning software development effort Optics verification tool

DOE/NSF ART Program Review April 29/30, 2009 Page 19 FY09 Milestones

DOE/NSF ART Program Review April 29/30, 2009 Page 20 Planning for FY10 DOE guidance is for level funding for FY10 and beyond SLAC will continue to lead e- source, BDS, and RF power source R&D with increased effort on accelerator physics & system integration and smaller efforts on ecloud, HA kickers & controls HLRF details depend on progress, supplemental funding, Project X 2 nd prototype Marx modulator speed up w extra funds Sheet beam klystron – Go-NoGo decision end of CY09 RF distribution & couplers paced by FNAL schedule New funding for cluster klystron POP expected BDS will continue major role in ATF2, support for TDP-1

DOE/NSF ART Program Review April 29/30, 2009 Page 21 Alignment with GDE/ILC Goals SLAC focus is largely complementary to efforts elsewhere HLRF R&D ~ unique within GDE e- source laser and photocathode R&D also unique complements gun R&D at Jlab System integration effort centered at SLAC BDS effort collaborative with UK SLAC has major role in ATF2 int’l collaboration also a leader in MDI design efforts SLAC took lead in dumps, collimators after UK cuts using SLAC RF modelling expertise for crab cavities UK is leading BDS optics design efforts for new baseline e- cloud – SLAC led past expt’l effort, now collaborating w CESR, KEK All efforts negotiated with ART and GDE management

DOE/NSF ART Program Review April 29/30, 2009 Page 22 Coordination with GDE/ART Within SLAC Weekly meetings of BDS/ATF2 and Linac groups Weekly ARD R&D talks (topics rotate) Bi-weekly meetings with group leaders (with TR, NP) Within ART Quarterly visits from ART director (+ phone meetings) Semi-annual visits from DOE program With GDE Weekly EC Webex meetings, plus quarterly face-to-face Monthly meetings with PMs SLAC, NW & AY phone/Webex) International GDE meetings (+ periodic special topic meetings)

DOE/NSF ART Program Review April 29/30, 2009 Page 23 Recovery from FY08 Cuts ? ILC Program emphasis and funding profile has changed irrevocably, and will not recover, until the project begins to move forward In major ILC R&D efforts, SLAC was able to continue through FY08 at a slower pace, so recovery is adiabatic With FY09 CR budget, M&S spending was resumed Rebuilding workforce is more problematic. Key staff moved onto other projects, and cannot shift back quickly. Morale and lack of confidence in ILC future and in SLAC’s future role in ILC is a major impediment. DOE guidance was to stop engineering and it will not quickly recover Overall, SLAC “Recovery” so far is reasonable given budget uncertainties and we have just had approval for a few new hires

DOE/NSF ART Program Review April 29/30, 2009 Page 24 Summary SLAC remains committed to a future Linear Collider SLAC continues to play a key role in ILC e- source, Beam Delivery, L-Band RF systems, e cloud Accelerator Physics, System Integration, HA Controls SLAC is well integrated into the GDE effort many SLAC efforts are unique SLAC was able to maintain significant effort on ILC related R&D through FY08 and through the FY09 CR. Now ramping up to full FY09 budget.