1 Chapter 4: Project Integration Management. 2 Learning Objectives Describe an overall framework for project integration management as it relates to the.

Slides:



Advertisements
Similar presentations
1IT Project Management, Third Edition Chapter 4 Chapter 4: Project Integration Management.
Advertisements

Copyright 2009  Develop the project charter: working with stakeholders to create the document that formally authorizes a project—the charter  Develop.
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
Project Scope Management
Project Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
Dr. L. K. Gaafar The American University in Cairo
Chapter 4: Project Integration Management
Chapter 5: Project Scope Management
Project Management CIS 486 Fall 2005 Week 3 Lecture Dr. David Gadish
CS Integration Management (Part 6) Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009 Dr.Çağatay ÜNDEĞER Instructor Bilkent University,
Project Management Session 7
Course Technology Chapter 3: Project Integration Management.
Chapter 3: The Project Management Process Groups
Chapter 5: Project Scope Management
Chapter 4: Project Integration Management
4 4 By: A. Shukr, M. Alnouri. Many new project managers have trouble looking at the “big picture” and want to focus on too many details. Project managers.
Chapter 5: Project Scope Management J. S. Chou, P.E., PhD.
Project Scope Management
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
Project management INTRODUCTION. Information Technology Project Management, Fourth Edition 2 IT projects have a terrible track record. A 1995 Standish.
Lecture 2_3: Project Integration Management
Project Management Fundamentals Project Organization and Integration
Prof. Ahmed Sameh 1 Week 4 Project Integration Management.
Copyright Course Technology 1999
PMP® Exam Preparation Course
Software Project Management
Project Integration Management Chapter 4. Copyright 2014 The Key to Overall Project Success: Good Project Integration Management Project managers must.
1 Chapter 4: Project Integration Management. 2 Learning Objectives Describe an overall framework for project integration management as it relates to the.
Chapter 4: Project Integration Management
Project Scope Management Process
Slide 1ICT 327 Management of IT ProjectsSemester 1, 2005 Topic 6 Integration Management “Bringing it all together”
Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 Topic 4 Requirements Specification Integration Management.
Chapter 5: Project Scope Management Information Technology Project Management.
IT Project Management, Third Edition Chapter 5 1 Chapter 2: Project Scope Management.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
Chapter 4: Project Integration Management Information Technology Project Management, Fifth Edition Note: some slides have been removed from the author’s.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
1 © The Delos Partnership 2004 Project Management Organisation and Structure.
Copyright 2009  Describe the five project management (PM) process groups, the typical level of activity for each, and the interactions among them  Understand.
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
1IT Project Management, Third Edition Chapter 4 Chapter 4: Project Integration Management.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 5 Project Integration Management.
Lecture 3 Title: Information Technology Project Methodology By: Mr Hashem Alaidaros MIS 434.
Copyright Course Technology Chapter 3: Project Integration Management.
Project Scope Management 1. 2 Learning Objectives Understand the elements that make good project scope management important. Explain the scope planning.
Chapter 4: Project Integration Management Information Technology Project Management, Fourth Edition.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Information Technology Project Management, Seventh Edition.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
The Project Management Process Groups
MIS Project Management Instructor: Sihem Smida Project Man agent 3Future Managers1.
Chapter 4: Project Integration Management Information Technology Project Management, Fourth Edition.
1IT Project Management, Third Edition Chapter 4 Chapter 4: Project Integration Management.
1 Chapter 4: Project Integration Management. 2 Learning Objectives Describe an overall framework for project integration management as it relates to the.
Chapter 3: Project Integration Management Doddy Prayogo, Ph.D.
Software Project Management
Project Management PTM721S
Project Integration Management
Chapter 4: Project Integration Management
Project Integration Management
Chapter 3: The Project Management Process Groups: A Case Study
Project Management Process Groups
Requirements Specification Integration Management
Chapter 4: Project Integration Management
Chapter 3: Project Integration Management
Chapter 4: Project Integration Management
Presentation transcript:

1 Chapter 4: Project Integration Management

2 Learning Objectives Describe an overall framework for project integration management as it relates to the other project management knowledge areas and the project life cycle Describe project plan development, including project plan content, using guidelines and templates for developing plans, and performing a stakeholder analysis to help manage relationships Explain project plan execution, its relationship to project planning, the factors related to successful results, and tools and techniques to assist in project plan execution Understand the integrated change control process, planning for and managing changes on information technology projects, and developing and using a change control system Describe how software can assist in project integration management

Summary for the general phases of projects

EXPLAINING CASE TERMS WBS – outcome oriented analysis of the work involved in a project that defines the total scope of the project. Project plan – document used to co-ordinate all project planning documents and guide project execution and control. (overview of the project, description, mgt and tech. processes used, sections describing work done, schedule information, budget information). Lessons learned – reflective statements written by PMs and their team members.

Continuation of phase -1 st two phases focus on planning -Next two phases focus on delivering the actual work. -Project must successfully complete each phase before moving on to the next. Why? This life cycle provides better management control and enables to see the ongoing operations of the organisation.

6 Project Integration Management Processes Project Plan Development: taking the results of other planning processes and putting them into a consistent, coherent document—the project plan Project Plan Execution: carrying out the project plan Integrated Change Control: coordinating changes across the entire project

The Key to Overall Project Success: Good Project Integration Management Project managers must coordinate all of the other knowledge areas throughout a project’s life cycle. Depends on activities involved in the knowledge areas. Commitment from top management in the organisation(s) sponsoring the project throughout the life cycle of the project. Ability to identify and manage the points of interaction between various project elements. (good communication and relationship management) Many new project managers have trouble looking at the “big picture” and want to focus on too many details (Project integration management is not the same thing as software integration)

8 Figure 4-2. Framework for Project Integration Management Focus on pulling everything to- gether to reach project success!

9 Figure 4-1. Project Integration Management Overview Note: The PMBOK® Guide 2000 includes similar charts for each knowledge area.

10 Project Plan Development A project plan is a document used to coordinate all project planning documents (constraints and assumptions) Its main purpose is to guide project execution Project plans assist the project manager in leading the project team and assessing project status Project performance should be measured against a baseline plan Assumptions = what is considered to be true, fact, or certain Constraints = restriction that will affect the performance of the project e.g. predefined budget, contractual provisions Baseline = original project plan plus approved changes

11 Attributes of Project Plans Just as projects are unique, so are project plans Plans should be dynamic Plans should be flexible Plans should be updated as changes occur Plans should first and foremost guide project execution

12 Common Elements of a Project Plan Introduction or overview of the project Description of how the project is organized Management and technical processes used on the project Work to be done, schedule, and budget information

Intro of the Project should include: – Project name – Brief description of the project & needs it addresses – Sponsor’s name – Names of the project manager and key team members – Deliverables of the project (software, hardware, tech rpts, training materials) – Reference materials (other knowledge areas) – List of definitions and acronyms

Section of Project plan describing organization Organization charts Project responsibilities Other org related information depending on the nature of the project eg. Software upgrade project showing timeline of the major steps involved or diagram

Section of Project plan describing management and technical issues Management objectives – views, priorities, assumptions, constraints Project controls – how to monitor progress and handle changes (status reveiws, use of charts, forms) Risk management – identifying, managing, controlling Project staffing – no. and type of people required Technical processes – any specific methodologies used, how information is documented e.g. any case tools used

Section of Project plan describing work to be done Using the WBS summarize the main work packages of the project Key deliverables (any quality expectations for these) Other work related information (e.g. any specific hardware or software that must be used on the project or certain specifications that must be followed). Any major assumptions

Section of Project plan describing schedule information List key deliverables and planned completion dates If small project, all work might be represented in a Gantt chart. Detailed schedule ( showing dependencies among activities or tasks) Include any assumptions

Section of Project plan describing budget information Summary budget – total estimates of overall project’s budget. What the nos mean. Is the estimate a firm no. or rough estimate Detailed budget – what are fixed vs recurring estimates for the project. What are the financial benefits, human resources needed to do the work, how are the labour costs caluculated?

19 Table 4-1. Sample Outline for a Software Project Management Plan (SPMP)

20 What the Winners Do "The winners clearly spell out what needs to be done in a project, by whom, when, and how. For this they use an integrated toolbox, including PM tools, methods, and techniques…If a scheduling template is developed and used over and over, it becomes a repeatable action that leads to higher productivity and lower uncertainty. Sure, using scheduling templates is neither a breakthrough nor a feat. But laggards exhibited almost no use of the templates. Rather, in constructing schedules their project managers started with a clean sheet, a clear waste of time." * Milosevic, Dragan and And Ozbay. “Delivering Projects: What the Winners Do.” Proceedings of the Project Management Institute Annual Seminars & Symposium (November 2001)

Caution to IT Project Managers Many companies have guidelines for creating project plans. (Previous)Previous) Specific documentation standards are not as rigorous/precise. Its good practice to follow standards/guidelines for developing project plans.

22 Stakeholder Analysis A stakeholder analysis documents important (often sensitive) information about stakeholders such as – stakeholders’ names and organizations – roles on the project – unique facts about stakeholders – level of influence and interest in the project – suggestions for managing relationships

23 Table 4-2. Sample Stakeholder Analysis

Importance of stakeholder analysis Understand and meet stake holder's needs and expectations. Help PM lead the execution of the project plan.

25 Project Plan Execution Project plan execution involves managing and performing the work described in the project plan The majority of time and money is usually spent on execution The application area of the project directly affects project execution because the products of the project are produced during execution

26 What Went Wrong? Many people have a poor view of plans based on past experiences. Senior managers often require a plan, but then no one follows up on whether the plan was followed. For example, one project manager said he would meet with each project team leader within two months to review their plans. The project manager created a detailed schedule for these reviews. He cancelled the first meeting due to another business commitment. He rescheduled the next meeting for unexplained personal reasons. Two months later, the project manager had still not met with over half of the project team leaders. Why should project members feel obligated to follow their own plans when the project manager obviously did not follow his?

27 Important Skills for Project Execution General management skills like leadership, communication, and political skills Product skills and knowledge ( identify examples of “What Went Right?” ) Use of specialized tools and techniques What type of expertise was need for project team to successfully produce the product? E.g DNA case

28 Tools and Techniques for Project Execution Work Authorization System: a method for ensuring that qualified people do work at the right time and in the proper sequence Status Review Meetings: regularly scheduled meetings used to exchange project information Project Management Software: special software to assist in managing projects

Caution to IT project managers To improve project planning and execution, plan before you work. Some project personnel have had to swap job functions, solicit/seek input. Lead by example/ walk the talk???? If its necessary to break org. rules to produce results in a timely manner. (communication, leadership & political skills )

30 Integrated Change Control Integrated change control involves identifying, evaluating, and managing changes throughout the project life cycle Three main objectives of change control: – Influence the factors that create changes to ensure they are beneficial – Determine that a change has occurred – Manage actual changes when and as they occur

31 Figure 4-3. Integrated Change Control Process

32 Change Control on Information Technology Projects Former view: The project team should strive to do exactly what was planned on time and within budget Problem: Stakeholders rarely agreed up-front on the project scope, and time and cost estimates were inaccurate Modern view: Project management is a process of constant communication and negotiation Solution: Changes are often beneficial, and the project team should plan for them

33 Change Control System A formal, documented process that describes when and how official project documents and work may be changed Describes who is authorized to make changes and how to make them Often includes a change control board (CCB), configuration management, and a process for communicating changes

34 Change Control Boards (CCBs) A formal group of people responsible for approving or rejecting changes on a project CCBs provide guidelines for preparing change requests, evaluate change requests, and manage the implementation of approved changes Includes stakeholders from the entire organization

35 Making Timely Changes Some CCBs only meet occasionally, so it may take too long for changes to occur Some organizations have policies in place for time-sensitive changes – “48-hour policy” allows project team members to make decisions, then they have 48 hours to reverse the decision pending senior management approval – Delegate changes to the lowest level possible, but keep everyone informed of changes

36 Configuration Management Ensures that the products and their descriptions are correct and complete Concentrates on the management of technology by identifying and controlling the functional and physical design characteristics of products Configuration management specialists identify and document configuration requirements, control changes, record and report changes, and audit the products to verify conformance to requirements

37 Table 4-3. Suggestions for Managing Integrated Change Control  View project management as a process of constant communications and negotiations  Plan for change  Establish a formal change control system, including a Change Control Board (CCB)  Use good configuration management  Define procedures for making timely decisions on smaller changes  Use written and oral performance reports to help identify and manage change  Use project management and other software to help manage and communicate changes

38 Using Software to Assist in Project Integration Management Several types of software can be used to assist in project integration management – Documents can be created with word processing software – Presentations are created with presentation software – Tracking can be done with spreadsheets or databases – Communication software like and Web authoring tools facilitate communications – Project management software can pull everything together and show detailed and summarized information (see Appendix A for details)

39 ResNet Summary Gantt Chart