RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010.

Slides:



Advertisements
Similar presentations
Cathy Beahm Technical Assistance Specialist NH DES, Air Resources
Advertisements

METAL FURNITURE SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART RRRR July 2006.
METAL COIL SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART SSSS May CFR PART 63, SUBPART SSSS May 2006.
METAL CAN SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART KKKK June CFR PART 63, SUBPART KKKK June 2006.
METAL COIL SURFACE COATING MACT QUESTION & ANSWERS
DRAFT IRON & STEEL FOUNDRY MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART EEEEE.
METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
METAL FURNITURE SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART RRRR July, 2006.
METAL FURNITURE SURFACE COATING MACT COMPLIANCE ASSURANCE
METAL COIL SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART SSSS May, CFR PART 63, SUBPART SSSS May, 2006.
METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
METAL CAN SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART KKKK June, CFR PART 63, SUBPART KKKK June, 2006.
Compliance Dates The final rule was published on January 25, 1995,
METAL FURNITURE SURFACE COATING MACT QUESTION & ANSWERS 40 CFR PART 63, SUBPART RRRR July 2006.
IRON & STEEL FOUNDRY MACT QUESTION & ANSWERS
IRON & STEEL FOUNDRY MACT COMPLIANCE ASSURANCE
U.S. Environmental Protection Agency April 13, 2011 Final Rules to Reduce Air Toxics from Boilers.
Anne M. Inman, P.E. Air Permits Division September 11, 2012.
Landfills Air Pollution Air Compliance and Enforcement Jeff Meyer 1.
Melanie King U.S. Environmental Protection Agency January 26, 2012.
RICE MACT and Oil Analysis
The Reciprocating Internal Combustion Engine (RICE) MACT Summary
RICE MACT 40 CFR 63, Subpart ZZZZ SI Source Requirements 7/18/2013.
APAI Environmental Workshop FESOP Recordkeeping/Plans James (Jim) Heim, C.T.C., E.P. Bruce Carter Associates, L.L.C February 9, 2012.
Air Permitting in Colorado Martha Hyder Wind River Environmental Group LLC September 2013.
NSPS OOOO & Fracking Air Quality Rule Updates Oil & Gas Environmental Compliance Conference – Appalachian Basin May 13-14, 2014 Robert Keatley, PE Senior.
Emergency Engine Emissions Standards
Regulatory Drivers for Reducing Solvent Emissions Barbara Johnson, PE Kansas State University Kansas Small Business Environmental Assistance Program March.
New Emission Rules for IC Engines Presented by Scott Wallace Devon Gas Services, L.P.
New Federal Regulations for Internal Combustion Engines Doug Parce.
Louisiana Department of EnvironmentalQuality LDEQ CAM Plan Overview LDEQ’s 27 th Annual Conference on the Environment Cajundome Convention Center Lafayette,
2015 NCMA EPA Enforcement Policies and How They Affect Your Facility Michael Pjetraj, P.E. DAQ Stationary Source Compliance Branch Supervisor.
NCMA Workshop March 19 and 24, 2015 Betty Gatano, P.E. Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919)
Caterpillar Engine Conference November 2009
A History and Status of CEMS Applications in USEPA Regulations Dale Evarts US EPA December 16, 2002 Better Air Quality in Asian Cities 2002
Compliance Update NCMA 2015.
INDUSTRIAL BOILER MACT (40 CFR 63 Subpart DDDDD)
Managing Air Quality Data 101 Presented by: Chris Bellusci & Claire Lund, PE (Sanborn Head) International Conference for Environmental.
Maricopa County Air Quality Department 1001 North Central Ave. Phoenix, Arizona Maricopa County Air Quality Department Protecting and improving our.
Mustang Watchdog April 22, 2014
EPA Rule 40 CFR Part 63 Subpart HHHHHH “The Refinisher Rule”
Indiana New Source Review Reform Plantwide Applicability Limitations (PALs) IDEM/Office of Air Quality September 7, 2004.
FRANKLIN engineering group, inc. Start-up Shutdown Malfunction Plan Development and Implementation Duncan F. Kimbro
Our Vision – Healthy Kansans living in safe and sustainable environments.
GENERAL CONDITIONS: ARTICLE 39 DIESEL VEHICLE EMISSIONS CONTROL GENERAL CONDITIONS: ARTICLE 39 DIESEL VEHICLE EMISSIONS CONTROL Connecticut's Diesel Reduction.
Compliance Assurance and Title V Monitoring A Summary of the Rules and Applications Peter Westlin, EPA, OAQPS.
| Philadelphia | Atlanta | Houston | Washington DC SO 2 Data Requirements Rule – A Proactive Compliance Approach Mark Wenclawiak, CCM |
| Philadelphia | Atlanta | Houston | Washington DC Boiler MACT Compliance Plans: Failure to Develop Plans Is Planning to Fail Susie Bowden|
PRIVILEGED & CONFIDENTIAL Reciprocating Internal Combustion Engine (RICE) Regulatory Update American Public Power Association June 8, 2010.
Welcome Revisions of Chapter WAC Sections -035 and -036 Rule advisory committee workshop #5 Lacey, WA October 28, 2009.
Joe Foutz November 15, 2012 NC DAQ Charlotte, NC Mooresville Regional Office.
Compliance Assurance and Title V Monitoring A Summary of Rules and Permitting Issues Peter Westlin, EPA, OAQPS.
HAP Rule 372 Guidance Permitting Division Maricopa County Air Quality Department.
Georgia’s 112(g) Experiences Eric Cornwell Acting Manager Permitting Program.
The Paper and Other Web Coating (POWC) MACT – Executive Summary The executive summary is a power point presentation designed to be used for basic education.
New Air Quality General Permit G-70A Oil and Natural Gas Industry Workshop October 24, 2012 Laura Jennings Engineer DEP – Division of Air Quality 10/24/2012.
Compliance Assurance Monitoring (CAM) November 24, 2009.
Update on Methane Regulations Affecting Landfills Pat Sullivan Senior Vice President SCS Engineers Nov. 10, 2015.
1 Special Information Session on USEPA’s Carbon Rules & Clean Air Act Section 111 North Carolina Division of Air Quality Special Information Session on.
Hot Topics in Air Quality NAAQS, Regulations, and Other Developments Jeff Slayback A&WMA Southwest Ohio Chapter August 19, 2010.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
Dan Nickey Miscellaneous Surface Coating at Area Sources: Iowa Department of Natural Resources Iowa Waste Reduction Center Iowa Collision Repair Association.
John Curtin Iowa Department of Natural Resources.
Complying with Periodic Emissions Monitoring Requirements
Clean Air Act Glossary.
Simple but Complicated Air Quality Permitting for Generators
Boiler Sheltered Initiative
Enforcing the NAAQS Case Study Sean Taylor
Kansas Air Quality Seminar March 5, 2008
The Air Emission Landscape for Engines Coalbed Methane Association of Alabama 29th Annual Meeting May 28, 2015.
Presentation transcript:

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010

Discussion Topics Background Important Terms Applicability Compliance Deadlines Emission/Operating Limits Performance/Compliance Demonstrations Continuous Monitoring Reporting Recordkeeping Q & A Contacts/Additional Resources

Background Initial RICE NESHAP - effective August 16, 2004  Affected existing and new stationary RICE engines >500 hp at major sources of hazardous air pollutants (HAP). RICE NESHAP Amendment – effective May 3, 2010  Affected stationary CI engines ≤500 hp at major sources; all existing stationary CI at area sources; and existing stationary non-emergency CI engines at major sources. We will focus on new and existing non-emergency stationary CI engines >500 hp at area and major sources

Important Terms Major Source – potential to emit (PTE) ≥10 tpy of a single HAP or ≥25 tpy of any combination of HAP. Area Source – a source of HAP emissions that is not major. HAP – any air pollutant listed in or pursuant to section 112(b) of the Clean Air Act (187 total). The main target HAP emissions for RICE are formaldehyde, acetaldehyde, and polycyclic aromatic hydrocarbons. Oxidation Catalyst – add-on catalytic control device for carbon monoxide (CO) and volatile organic compounds (VOC) by oxidation. Residential/Commercial/Institutional Emergency RICE – emergency stationary RICE used in residential establishments such as homes or residences; commercial establishments such as office buildings, hotels, or stores; or institutional establishments such as medical centers, research centers, and institutions of higher education. Limited Use RICE – Any stationary RICE that operates <100 hrs/yr. Reconstruction – The fixed capital cost of the new components exceeds 50% of fixed capital cost to construct a comparable new source; and it is technologically and economically feasible for the reconstructed source to meet the relevant standards.

Important Terms Emergency Stationary RICE – engine operation limited to emergency and required testing and maintenance. Can operate up to 100 hrs/yr for maintenance & readiness testing – no time limit for use during emergency situations. Can operate up to 50 hrs/yr for non-emergency purposes – can’t peak shave or generate income. Must count hrs towards 100-hr ceiling Can operate up to 15 hrs/yr as part of a demand response program if regional transmission organization or equivalent balancing authority determines there are emergency conditions that could lead to an electrical backout. Must count towards 100-hr ceiling.

>500 hp CI Applicability Affected source is any existing, new or reconstructed stationary RICE located at a major or area source of HAP emissions.  CI RICE that don’t have to meet the requirements of ZZZZ or Subpart A Existing emergency CI RICE at major source Existing limited use CI RICE at major source Existing residential, commercial or institutional emergency CI RICE at area source >500 hp CIExistingNew Major SourceCommenced construction or reconstruction before 12/19/2002 Commenced construction or reconstruction after 12/19/2002 Area SourceCommenced construction or reconstruction before 6/12/2006 Commenced construction or reconstruction after 6/12/2006

>500 hp CI Compliance Deadlines Emission & Operating Limitations >500 hp CIExistingNew/Reconstructed Major Source Non-emergency CI RICE – 5/3/2013Start up before 8/16/2004 – comply by 8/16/2004 Start up after 8/16/2004 – comply upon startup Area Source CI RICE – 5/3/2013Start up before 1/18/2008 – comply by 1/18/2008 Start up after 1/18/2008 – comply upon startup Area sources that become major sources  Any stationary RICE for which construction or reconstruction is commenced after the date your area source becomes major for HAP must comply upon startup.  Any stationary RICE for which construction or reconstruction is commenced before the date your area source becomes major for HAP must comply within 3 years after becoming major.

>500 hp CI Emission/Operating Limits New or Reconstructed non-emergency CI >500 hp at Major Source Emission Limit (ZZZZ Table 2a) Reduce CO emissions by 70% or more; or Minimize the engine’s time spent at idle and minimize startup time to amount needed for appropriate and safe loading of the engine, not to exceed 30 minutes. 1 Limit concentration of formaldehyde in the exhaust ≤580 ppbvd at 15% O 2 Operating Limit (ZZZZ Table 2b) Oxidation Catalysta. Maintain catalyst so that the ∆p across the catalyst does not change by more than 2 inches of water at 100% load ±10% from the ∆p across the catalyst that was measured during the initial performance test; and b. Maintain the temperature of your stationary RICE exhaust so that the catalyst inlet temperature is ≥450 °F and ≤1350 °F. 2 No CatalystComply with any operating limitations approved by the Administrator. Beginning 10/1/2010 CI RICE subject to NSPS IIII with a displacement of <30 liters per cylinder that uses diesel fuel, must use diesel that meets the requirements in 40 CFR (b) for nonroad diesel fuel. Sulfur = 15 ppm (NR); min. cetane index of 40, or max aromatic content of 35%v (i.e. ultra low sulfur diesel). Can petition Administrator for an extension40 CFR (b) 1 Sources can petition the Administrator pursuant to the requirements of 40 CFR 63.6(g) for alternative work practices.40 CFR 63.6(g) 2 Sources can petition the Administrator pursuant to the requirements of 40 CFR 63.8(g) for a different temperature range.40 CFR 63.8(g)

>500 hp CI Emission/Operating Limits Existing non-emergency CI >500 hp at Major Source Emission Limit (ZZZZ Table 2c) Reduce CO emissions by 70% or more; or Minimize the engine’s time spent at idle and minimize startup time to amount needed for appropriate and safe loading of the engine, not to exceed 30 minutes. 1 Limit concentration of CO in the exhaust ≤23 ppmvd at 15% O 2 Operating Limit (ZZZZ Table 2b) Oxidation Catalysta. Maintain catalyst so that the ∆p across the catalyst does not change by more than 2 inches of water at 100% load ±10% from the ∆p across the catalyst that was measured during the initial performance test; and b. Maintain the temperature of your stationary RICE exhaust so that the catalyst inlet temperature is ≥450 °F and ≤1350 °F. 2 No CatalystComply with any operating limitations approved by the Administrator. Existing non-emergency CI RICE >300 hp with a displacement of <30 liters per cylinder that uses diesel fuel, must use diesel that meets the requirements in 40 CFR (b) for nonroad diesel fuel. Sulfur = 15 ppm (NR); min. cetane index of 40, or max aromatic content of 35%v (i.e. ultra low sulfur diesel).40 CFR (b) 1 Sources can petition the Administrator pursuant to the requirements of 40 CFR 63.6(g) for alternative work practices.40 CFR 63.6(g) 2 Sources can petition the Administrator pursuant to the requirements of 40 CFR 63.8(g) for a different temperature range.40 CFR 63.8(g)

>500 hp CI Emission/Operating Limits Existing non-emergency CI >500 hp at Area Source Emission Limit (ZZZZ Table 2d) Reduce CO emissions by 70% or more; or Minimize the engine’s time spent at idle and minimize startup time to amount needed for appropriate and safe loading of the engine, not to exceed 30 minutes. 1 Limit concentration of CO in the exhaust ≤23 ppmvd at 15% O 2 Operating Limit (ZZZZ Table 2b) Oxidation Catalysta. Maintain catalyst so that the ∆p across the catalyst does not change by more than 2 inches of water at 100% load ±10% from the ∆p across the catalyst that was measured during the initial performance test; and b. Maintain the temperature of your stationary RICE exhaust so that the catalyst inlet temperature is ≥450 °F and ≤1350 °F. 2 No CatalystComply with any operating limitations approved by the Administrator. Existing non-emergency CI RICE >300 hp with a displacement of <30 liters per cylinder that uses diesel fuel, must use diesel that meets the requirements in 40 CFR (b) for nonroad diesel fuel. Sulfur = 15 ppm (NR); min. cetane index of 40, or max aromatic content of 35%v. This requirement also applies to all new CI engines at area sources subject to NSPS IIII – comply by 10/1/ CFR (b) 1 Sources can petition the IDNR pursuant to the requirements of 40 CFR Subpart E for alternative work practices. 2 Sources can petition the IDNR pursuant to the requirements of 40 CFR Subpart E for a different temperature range.

>500 hp CI Emission/Operating Limits Existing non-emergency ≥300 hp CI If not equipped with a closed crankcase ventilation system must:  Install a closed crankcase ventilation system to prevent crankcase emissions from being emitted to atmosphere, or;  Install an open crankcase filtration system to remove oil mist, particles, and metals from engine exhaust.  Follow manufacturer’s specified maintenance requirements for these ventilation systems.

>500 hp non-emergency CI Performance/Compliance Demonstrations Non-emergency CI >500 hp at Major Source Compliance StandardInitial performance (IP)/initial compliance demonstration (CD) Subsequent Performance Tests Construction or Reconstruction between 12/19/2002 – 6/15/2004 Limit the concentration of formaldehyde in the stationary RICE exhaust Initial compliance with proposed or promulgated emissions limits by 2/10/2005, or no later than 180 days after startup. Conduct subsequent performance tests semiannually. 1 Construction or Reconstruction between 12/19/2002 – 6/15/2004 Reduce CO emissions and not using a CEMS Initial compliance with proposed or promulgated emissions limits by 2/10/2005, or no later than 180 days after startup. Conduct subsequent performance tests semiannually. 1 *If you chose to comply with the proposed emission limits for initial CD, you must conduct a second performance test to demonstrate compliance with the promulgated limits by 12/13/2007. ExistingLimit or reduce CO or formaldehyde emissions No later than 180 days after 5/3/2013 (initial test can be conducted 2 years prior to compliance date, provided that it is an acceptable test) Conduct subsequent performance tests every 8,760 hrs or 3 years, whichever comes first. 1 Can reduce testing frequency to annual after two consecutive tests that demonstrate compliance. However, you must resume semiannual testing if subsequent annual tests indicate non-compliance with CO or formaldehyde limits, or you deviate from any operating limits.

>500 hp CI Performance/Compliance Demonstrations Non-emergency CI >500 hp at Area Source Compliance StandardInitial performance (IP)/initial compliance demonstration (CD) Subsequent Performance Tests New or ReconstructedNew CI engines at area sources of HAP must comply with NSPS requirements in 40 CFR 60, Subpart IIII ExistingLimit or reduce CO or formaldehyde emissions No later than 180 days after 5/3/2013 (initial test can be conducted 2 years prior to compliance date, provided that it is an acceptable test) Conduct subsequent performance tests every 8,760 hrs or 3 years, whichever comes first. Existing (limited use)Limit or reduce CO or formaldehyde emissions Within 180 days of 5/3/2013Conduct subsequent performance tests every 8,760 hrs or 5 years, whichever comes first.

>500 hp CI Performance Testing Each performance test must be conducted according to the requirements in Table 4 (approved test methods) of this subpart. Must conduct 3 separate test runs for each performance test required as specified in §63.7(e)(3). Engine load must be representative, 100% load (±10%). If you do not use an oxidation catalyst to comply with emission limits, you must petition the Administrator for operating limits to be established during the initial performance test, or justify why these limits are not necessary as per § (g) & (h). You cannot test until the petition has been approved. Can use a previous performance test for the initial demonstration if:  Use same methods specified in this subpart  Test is not older than 2 years  Test must be reviewed and accepted by Administrator  No process or equipment changes, or owner can demonstrate that the changes would not impact results.

>500 hp CI Continuous Monitoring >500 hp CICompliance StandardCompliance Requirement Major Source (new or reconstructed) Reduce/limit CO and/or formaldehyde using oxidation catalyst and CPMS Conduct semiannual test Collect catalyst inlet data Reduce data to 4-hr rolling average Maintain the 4-hr rolling average operating limits Measure ∆p across catalyst 1x/month and demonstrate compliance with operating limit Reduce/limit CO and/or formaldehyde w/o catalyst and using CPMS Conduct semiannual test Collect approved operating parameter (if any) data Reduce data to 4-hr rolling average Maintain the 4-hr rolling average operating limits Reduce CO emissions using CEMS Collect 1-hr averages Demonstrate % reduction over 4-hr average period Conduct annual RATA Major Source & Area Source (existing) Reduce/limit CO or formaldehyde Conduct performance test every 8,760 hrs or 3 yrs, whichever comes first. Demonstrate compliance with limits Testing frequency every 8,760 hrs or 5yrs for limited use CI engines (testing not required for existing limited use CI engines at major sources). * For new or reconstructed RICE, deviations from the emission or operating limits that occur during the first 200 hrs of operation from engine startup (i.e. initial burn in period) are not violations.

>500 hp CI Reporting Initial Notifications  Startup at major source before 8/16/2004 – no later than 12/13/2004  Startup at major source after 8/16/2004 – no later than 120 days after you become subject  New or existing at area source – no later than 120 days after you become subject Performance Testing  Submit notice at least 60 days prior to test date Compliance Status  For initial compliance demonstration w/o performance test – within 30 days following completion of demonstration  For initial compliance demonstration with performance test – within 60 days following completion of test

>500 hp CI Reporting Compliance Report  Semiannual - 7/31 (reporting period 1/1 – 6/30) & 1/31 (reporting period 7/1 – 12/31) Deviations from emission or operating limits Malfunctions Out of control CEMS or CPMS If no deviations experienced – submit a statement to that effect Frequency changes to annual for limited use – 1/31 Include information as per § (c) – (e)  Annual – 1/31 for prior reporting period Deviations from operating limits in a federally enforceable permit Any problems or errors suspected with the meters

>500 hp CI Recordkeeping Records  Each notification and report submitted for compliance purposes.  Occurrence and duration of each malfunction of operation, air pollution control and monitoring equipment.  Action taken during malfunctions to minimize emissions, or restore equipment to its normal manner of operation.  Performance tests and performance evaluations, including RATA information for CEMS and CPMS.  All required maintenance on air pollution control and monitoring equipment.  Continuous compliance data (4-hr averages, monthly ∆p, etc.)  Records must be in a form suitable and readily available for expeditious review and retained for 5 yrs from date generation. Most recent 2 years of data must be retained on-site Can be in hard copy or electronic format

Q&A Questions? Please refer to the full rule text of 40 CFR Part 63, Subpart ZZZZ to determine all applicable equipment requirements, management practices, monitoring requirements, recordkeeping requirements and reporting requirements necessary to be in compliance with this rule.

Contacts Shane Dodge Linn County Public Health th Street NW Cedar Rapids, IA (319) John Curtin Iowa DNR 7900 Hickman Road Windsor Heights, IA (515) Diane Brockshus Iowa DNR 7900 Hickman Road Windsor Heights, IA (515) Additional Information NESHAP ZZZZ icepg.html icepg.html NSPS IIII /cinsps/cinspspg.html /cinsps/cinspspg.html